Difference between pages "Category:109 Measurement and Payment" and "751.36 Driven Piles"

From Engineering_Policy_Guide
(Difference between pages)
Jump to navigation Jump to search
 
 
Line 1: Line 1:
[[Image:237.3 Quantities.jpg|right|325px]]
+
[[image:Main Page July 17, 2013.jpg|right|350px]]
This article provides additional guidance related to measurement and payment, as defined in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109], and sets forth uniform and effective procedures for the maintenance of records necessary to document project payments.  Documentation procedures shown are considered to be the minimum required to authorize payment for an item. It is not intended to discourage other or more detailed documentation should either or these be appropriate to the situation. 
+
==751.36.1 General==
  
It is intended that detailed records be prepared for all items and especially for those not accessible when a project is complete or for any pay item that does not remain a part of a completed project.
+
'''Accuracy Required'''
  
The specifications provide the basis of payment and a description of most items.  Field measurement, final plans and remarks instructions are included in this article for that specification or may be obtained from the [http://sp/sites/cm/Pages/default.aspx Constructions and Materials division].
+
All  capacities shall be taken to the nearest 1 (one) kip, loads shown on plans.
{|style="padding: 0.3em; margin-left:2px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="325px" align="right"  
+
 
 +
===751.36.1.1 Maximum Specified Pile Lengths===
 +
 
 +
:{|
 +
|Structural Steel Pile||width="25"| ||No Limit
 
|-
 
|-
|EPG articles are <u>not</u> referenced as "sections" but as EPG XXX.X to avoid confusion with MoDOT specs (which are contractually binding).
+
|Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile||width="25"| ||No Limit
 
|}
 
|}
==109.1 Measurement of Quantities (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.1])==
+
It is not advisable to design pile deeper than borings. If longer pile depth is required to meet design requirements, then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as required pile length.
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="275px" align="right"  
+
 
 +
===751.36.1.2 Probe Pile===
 +
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"  
 
|-
 
|-
|<center>'''Forms'''</center>
+
|'''Asset Management'''
 
|-
 
|-
|[https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet]
+
|[https://spexternal.modot.mo.gov/sites/cm/CORDT/or10010.pdf Report 2009]
 
|-
 
|-
|[[media:137 Force Account Worksheet example.xls|Force Account Worksheet example]]
+
|'''See also:''' [https://www.modot.org/research-publications Research Publications]
|-
 
|<center>'''Quick Reference Guides to assist in the AWP change order process:'''</center>
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Change_Order_Reports.doc Change Order Reports]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_1ChangeOrderOverview.doc Change Order Overview]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Change_Order_Codes.docChange Order Codes]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_3ChangeOrderTimeExtension.doc Change Order Time Extension]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_4ChangeOrderValueEngineering.doc Change Order Value Engineering]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_5ChangeOrderNoCostContractModification.doc Change Order, No Cost Contract Modification]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Milestones.doc Milestones]
 
|-
 
|<center>'''Quick Reference Guide to assist in the AWP payment estimate process:'''</center>
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Contract_Adjustments.doc Contract Adjustments]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Estimate.doc Contractor Pay Estimates]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Item_Adjustments.doc Line Item Adjustments]
 
|-
 
|[https://epg.modot.org/forms/CM/AWP_CO_Construction_Stockpiles.doc Stockpiled Materials]
 
 
|}
 
|}
  
Measurements performed, and the associated calculations, should be well documented in the project records and should be recorded to no less than the minimum specified precision of the measurement. (For example: “Measurement will be made to the nearest linear foot” means to measure to no less than the nearest linear foot.) Confirm that the tools being used to make the measurement are accurate within the range required for the measurement. Calculations may be made manually, with a calculator or a computer but in each instance the results should be independently verified to eliminate math, keystroke or computer related errors.
+
Length shall be estimated pile length + 10’.
 +
 +
When probe piles are specified to be driven-in-place, they shall not be included in the number of piles indicated in the [https://epg.modot.org/index.php/751.50_Standard_Detailing_Notes#E2._Foundation_Data_Table “FOUNDATION DATA” Table].
  
Specifications typically have a "Method of Measurement" clause that indicates the minimum unit of measurement and pay. Each day that a work item is reported, the total quantity of work completed or material placed that day is to be totaled and then reported to a degree of accuracy no less than what is designated in the specification. Rounding is generally not necessary. For instance, tickets for hot mix asphalt generally show the measured quantity to the nearest hundredth of a ton even though the degree of accuracy per spec is only required to be to the nearest tenth of a ton. The tickets should be totaled to the nearest hundredth and reported to that accuracy in AWP each day.  The daily quantity does not need to be rounded nor does the final pay quantity at project closeout need to be rounded. 
+
===751.36.1.3 Static Load Test Pile===
  
When payment is made per station, it should be assumed that the work is performed in a single pass through the project limits and that the work may be along the centerline, on either side or on both sides. For example, work on both sides of the centerline that is one station long is to be paid as one station of work, not two.  This guidance is to be waived when the specifications or plans are explicitly contradictory.
+
When Static Load Test Pile is specified, the nominal axial compressive resistance value shall be determined by an actual static load test.
  
==109.2 Scope of Payment (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.2])==
+
For preboring for piles, see [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 702].
  
Payment to the contractor and the exceptional situations that may affect payment are covered by Sec 109.
+
===751.36.1.4 Preliminary Geotechnical Report Information===
  
==109.3 Compensation for Altered Quantities (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.3])==
+
The foundation can be more economically designed with increased geotechnical information about the specific project site.
  
Typically this applies to Major Items, which are marked in the Items window of AWPWhen there are no major items identified on the job, the greatest cost items on the job, that aggregately add up to 60% of the contract, are defined as the major items even though any one of them does not meet the 10% criteria of a Major Item.
+
Soil information should be reviewed for rock or refusal elevationsAuger hole information and rock or refusal data are sufficient for piles founded on rock material to indicate length of piling estimated.  Standard Penetration Test information is especially desirable at '''each''' bent if friction piles are utilized or the depth of rock exceeds approximately 60 feet.
  
==109.4 Differing Site Conditions and Changes in the Work (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.4])==
+
===751.36.1.5 Geotechnical Redundancy===
 +
 +
'''Pile Nonredundancy (20 percent resistance factor reduction)'''
  
Differing site conditions include subsurface or latent physical conditions at the site differing materially from those indicated in the contract, or unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in the work.  Changes in, or extra, work includes items of work not provided for in the contract as awarded, but found essential to the satisfactory completion of the contract.
+
Conventional bridge pile foundations:
  
==109.5 Force Account (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.5])==
+
For pile cap footings where a small pile group is defined as less than 5 piles, reduce pile geotechnical and structural resistance factors shown in LRFD Table 10.5.5.2.3-1.
  
When it is impossible to reach agreement on a fair price for necessary extra work having no unit bid prices, the work must be done on a force account basis. This means that the contractor will be reimbursed for the actual cost of labor, insurance and tax, equipment and materials. In addition, the prime contractor will receive specified percentages of these costs to cover supervision, overhead and profit. Contract provisions for this method of settlement are set out in Sec 109.5. Per the specification, the prime contractor will receive an amount equal to five percent of the actual cost of subcontracted work. Actual cost is defined as including the subcontractor’s work, overhead and profit.  
+
For pile cap bents, the small pile group definition of less than 5 piles is debatable in terms of nonredundancy and applying a resistance factor reduction. The notion of a bridge collapse or a pile cap bent failure directly related to the failure of a single pile or due to its pile arrangement in this instance, or ignoring the strength contribution of the superstructure via diaphragms in some cases would seem to challenge applying the small pile group concept to pile bent systems as developed in NCHRP 508 and alluded to in the LRFD commentary. In terms of reliability, application of this factor could be utilized to account for exposed piling subject to indeterminable scour, erosion, debris loading or vehicular impact loadings as an increased factor of safety.
  
Before work is done on a force account basis, a change order must be approved to provide funds and authority for the work. The change order must be supported by the best available estimate of cost. The estimate should be carefully prepared to prevent large variations of actual cost from the estimate. Reference [[:Category:109_Measurement_and_Payment#109.12.1.3_Contingent_Items_-_Settlement_for_Cost|EPG 109.12.1.3]] for more information on how to set up the pay item for Force Account work.
+
For integral and non-integral end bent cap piles, the reduction factor need not be considered for less than 5 piles due to the studied infrequency of abutment structural failures (NCHRP 458, p. 6) and statewide satisfactory historical performance.
  
Daily records must be kept during progress of the work. This avoids later misunderstanding about the cost. Keep these records on the [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet] of the [[:Category:137 Construction Inspection Guidance for Records to be Maintained#137.3 Force Account|Force Account]] Worksheet. An [[media:137 Force Account Worksheet example.xls|example of the force account worksheet]] is available.  
+
For intermediate bent cap piles, the reduction factor need not be considered for less than 5 piles under normal design conditions. It may be considered for unaccountable loading conditions that may be outside the scope of accountable strength or extreme event limit state loading and is specific to a bridge site and application and is therefore utilized at the discretion of the Structural Project Manager or Structural Liaison Engineer. Further, if applied, it shall be utilized for determining pile length if applicable, lateral and horizontal geotechnical and structural resistances. Alternatively, a minimum of 5 piles may save consideration and cost.  
  
===109.5.1 Daily Force Account Record, Labor Account===
+
Any substructure with a pile foundation can be checked for structural redundancy if necessary by performing structural analyses considering the hypothetical transference of loads to presumed surviving members of a substructure like columns or piles (load shedding). This direct analysis procedure could be performed in place of using a reduction factor for other than pile cap footings.
  
Use the [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet] of the Daily Force Account Record, Labor Account, as follows:
+
For major bridges, the application of pile redundancy may take a stricter direction. See the Structural Project Manager or Structural Liaison Engineer.
  
:In the upper right corner, place the number of the change order that originally authorized the force account work. This will serve to identity all associated reports. If the work is temporary erosion control authorized by order record, use the order record number and initials, O.R.
+
===751.36.1.6 Waterjetting===
  
:Number the report consecutively for each day's work until the operation is completed. Write “Final” after the report number on the last daily report.
+
Waterjetting is a method available to contractors to aid in driving piles. If the drivability analysis indicates difficulty driving piles then it can be assumed that the contractor may use waterjetting to aid in driving the piles. The [[media:751.36.1 Waterjeting.docx|Commentary on Waterjetting]] discusses items to consider when there is a possibility of the use of waterjetting.
  
:Route, county, and project should be placed in the appropriate spaces.
+
===751.36.1.7 Restrike===
  
:Give a fairly detailed description in the space provided for Description of Work. Include the location of the work to be done. Place this data on Report No. 1. It need not be repeated on subsequent daily reports.
+
In general, designers should NOT require restrikes unless the Geotechnical Section requires restrike because it delays construction and makes it harder for contractors to estimate pile driving time on site. The Geotechnical Section shall show on borings data a statement indicating either "No Restrike Recommended" or "Restrike Recommended", with requirements.
  
::(a) The people employed on the work must be listed daily. This makes it necessary for the contractor to furnish the required information for each employee expected to be used on the work. Separate lines are provided for regular and overtime hours. The hours shown for each employee should be the actual hours worked each day. Separate columns are provided for the rate per hour and the fringe benefit rates per hour. The rates shown should be verified by a copy of the contractor's payroll, if available, or from the contractor's statement required by [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.5.7].
+
==751.36.2 Steel Pile==
  
::(b) Lead workers, as described under Sec. 109.5.1, must be paid no less than the prevailing hourly wage for the classification they are working in. If a lead worker is salaried, the contractor must provide documentation of the amount actually paid and the hours actually worked. This documentation is required by Sec 109.5.7. Salaried superintendents are not covered by the prevailing wage provisions and should not be included in the labor account. Their expenses are covered by the 20 percent overhead and profit as provided in Sec 109.5.2.
+
===751.36.2.1 Material Properties===
  
:If actual wage rates and fringe benefits cannot be determined in advance, it will be satisfactory to use rates shown in the contract for each classification. If rates from the contract are used, it will be necessary to obtain the actual rates paid by the contractor and make revised sheets before preparing the [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet] of the Summary of Costs for the force account work. The contractor’s representatives should sign any revised sheets.
+
====751.36.2.1.1 Structural Steel HP Pile====
  
:Total the labor account at the end of each day. Add the previous day's total to get a running total to date.
+
Structural Steel HP piling shall be ASTM A709 Grade 50 (fy = 50 ksi) steel.
  
:Check the appropriate spaces at the bottom of the page to indicate whether there were any materials or equipment charges that day. If the answer in both cases is no, the "Equipment and Materials Account" will not be required for that date.
+
Note: ASTM A709 Grade 50S shall not be specified for HP piles without prior confirmation of the availability of the material.
  
:On the lower left of the form is space for the signature of the resident engineer, or of the employee designated in writing to sign the daily forms. ALternately, this can be done by attaching a digital signature to the form once it has been changed to a pdf document.
+
====751.36.2.1.2 Cast-In-Place (CIP) Pile====
  
:The employee designated in writing by the contractor shall sign immediately below MoDOT's representative. Insert the name of the contractor below the space for this signature.
+
Welded or Seamless steel shell (Pipe) for CIP piling shall be ASTM A252 Modified Grade 3
  
:Give the contractor the original and retain two copies. The MoDOT copy may be retained electronically.
+
:(f<sub>y</sub> = 50 ksi, E<sub>s</sub> = 29,000 ksi)
 +
 
 +
'''Concrete'''
 +
{|style="text-align:left"
 +
|Class B - 1 Concrete (Substructure)||width="50"| ||''f'<sub>c</sub>''= 4.0 ksi
 +
|}
 +
Modulus of elasticity,
 +
:<math>E_c = 33000 K_1(w^{1.5}_c)\sqrt{f'_c}</math>
 
   
 
   
===109.5.2 Daily Force Account Record, Equipment and Materials Account===
+
Where:
  
Complete this portion of the [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet] of the Worksheet, if either materials or equipment charges were assessed for the day. Place the same information in the upper right corner as was placed on the Labor Account portion of the Worksheet. The report number is to be consecutive for the Equipment and Materials Form. It need not agree with the number on the Labor Account Form.
+
:''f'<sub>c</sub>'' in ksi
 +
:''w<sub>c</sub>'' = unit weight of nonreinforced concrete = 0.145 kcf
 +
:''K<sub>1</sub>'' = correction factor for source of aggregate
 +
::= 1.0 unless determined by physical testing
 +
 +
'''Reinforcing Steel '''
 +
{|style="text-align:left"
 +
|Minimum yield strength, ||width="50"| || ''f<sub>y</sub>'' = 60.0 ksi
 +
|-
 +
|Steel modulus of elasticity, ||width="50"| || ''E<sub>s</sub>'' = 29000 ksi
 +
|}
  
The headings for the various spaces under Materials Account are self-explanatory.
+
===751.36.2.2 Steel Pile Type===
  
Each equipment unit must be listed separately. The contractor must supply information on all equipment to be used on a force account basis. The information must be in sufficient detail to allow accurate determination of the allowable rental rent according to [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.5.4].
+
Avoid multiple sizes and/or types of pilings on typical bridges (5 spans or less). Also using same size and type of pile on project helps with galvanizing.
  
'''Rental rates on file with the Commission''' are the rates contained in [https://app.equipmentwatch.com/search/by-manufacturer ''Rental Rate Blue Book''] for construction equipment. [[media:Equipment Rental Rates from the Blue Book.doc|Equipment Rental Rates from the Blue Book]] [[image:bulldozer.jpg|20px]] For contractor-owned equipment, apply the Model Year and Region adjustments, then divide the monthly rate by 176 hours to obtain the FHWA approved hourly rate.  The listed estimated operating cost per hour is also applied for the time the machine is in use.
+
There are two types of piles generally used by MoDOT. They are structural steel HP pile and close-ended pipe pile (cast-in-place, CIP). Open ended pipe pile (cast-in-place, CIP) can also be used. Structural steel piling are generally referred to as HP piling and two different standard AISC shapes are typically utilized: HP12 x 53 and HP14 x 73. Pipe piling are generally referred to as cast-in-place or CIP piling because concrete is poured and cast in steel shells which are driven first or pre-driven.
  
In all other cases, the resident engineer should negotiate rental rates with the contractor, subject to approval by the district. Sec. 109.5.4 states, "In no case shall the rental rates exceed those of established distributors or equipment rental agencies.” Proposed rates for contractor owned equipment may not exceed the rate determined by the above paragraph or the rate charged locally by equipment rental companies, whichever is lower. If special cases indicate that higher rates may be justified, send the proposed rates to [http://sp/sites/cm/Pages/default.aspx Construction & Materials] with the district's recommendation and data to support the proposed rates for division review.
+
====751.36.2.2.1 Structural Steel HP Pile====
 +
<center>
 +
{|style="text-align:center"
 +
|+'''HP Size'''
 +
!width="100pt"|Section||width="25"| ||width="100pt"|Area
 +
|-
 +
|HP 12 x 53|| ||15.5 sq. in.
 +
|-
 +
|HP 14 x 73|| ||21.4 sq. in.
 +
|}
 +
</center>
 +
The HP 12 x 53 section shall be used unless a heavier section produces a more economical design or required by a Drivability Analysis.
  
Contractor's proposed rates shall be submitted to the resident engineer in writing. The proposal shall state whether the rate includes fuel and lubricants. After district concurrence, the resident engineer shall grant approval in writing. The written proposal and approval make up the agreement. Send both letters to the district with the [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet] of the Daily Force Account Record, Summary of Costs after the work is done.
+
====751.36.2.2.2 Cast-In-Place (CIP) Pile====
 +
<center>'''Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile Size'''
 +
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 +
!Outside Diameter!!Minimum Nominal Wall<br/>Thickness (By Design) !!Common Available Nominal Wall<br/>Thicknesses
 +
|-
 +
|14 inch||1/2”|| 1/2” and 5/8”<sup>2</sup>
 +
|-
 +
|16 inch||1/2”|| 1/2” and 5/8”<sup>2</sup>
 +
|-
 +
|20 inch<sup>1</sup>||1/2”|| 1/2” and 5/8”
 +
|-
 +
|24 inch<sup>1</sup>||1/2”|| 1/2”, 5/8” and 3/4”
 +
|-
 +
|colspan="3" align="left"|<sup>'''1'''</sup> Use when required to meet KL/r ratio or when smaller diameter CIP do not meet design.
 +
|-
 +
|colspan="3" align="left"|<sup>'''2'''</sup> 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.
 +
|}
 +
</center>
 +
Use minimum nominal wall thickness which is preferred. When this wall thickness is inadequate for structural strength or for driving (drivability), then a thicker wall shall be used. Specify the required wall thickness on the plan details. The contractor shall determine the pile wall thickness required to avoid damage during driving or after adjacent piles have been driven, but not less than the minimum specified.  
  
When this has been done, use of the various column headings is based on the agreement. The columns for No. Hours, Previous Hours, and Net Hours are self-explanatory. They are to be used regardless of rental basis.
+
Minimum tip elevation must be shown on plans. Criteria for minimum tip elevation shall also be shown. The following information shall be included on the plans:
  
If equipment is to be used on an hourly rental basis, the Hour Rate multiplied by the Rate Adjustment Factor will be used. In all other cases, list the rental on either a weekly or monthly basis as agreed.
+
:“Minimum Tip Elevation is required _______________.” Reason must be completed by designer such as:
 +
::*for lateral stability
 +
::*for required tension or uplift pile capacity
 +
::*to penetrate anticipated soft geotechnical layers
 +
::*for scour*
 +
::*to minimize post-construction settlements
 +
::*for minimum embedment into natural ground
  
When equipment is rented from a recognized rental agency specifically for the force account work, the contractor will normally be allowed the actual rental paid. This must be established by paid invoices.
+
::'''*'''For scour, estimated maximum scour depth (elevation) must be shown on plans.
  
If contractor-owned equipment must be kept available full time at the site, or if it is specialized equipment for which there is no other use on the project, it may become necessary to allow rental on a full time basis. The unit should then be shown at 8 hours of rental for each day, Monday through Friday, at the hourly rate established as outlined in the [https://app.equipmentwatch.com/search/by-manufacturer Rental rates on file with the Commission] paragraph, above, unless the resident engineer has authorized overtime use of the equipment. If the agreed rate is "bare" rate, the agreed operating cost per hour would be added to the "bare" rate only for actual operating hours.
+
:Guidance Note: Show maximum of total scour depths estimated for multiple return periods in years  from Preliminary design which should be given on the Design Layout. Show the controlling return period (e.g. 100, 200, 500). If return periods are different for different bents, add a new line in [https://epg.modot.org/index.php/751.50_Standard_Detailing_Notes#E2._Foundation_Data_Table foundation data table].
  
If contractor-owned equipment is to be used on a part-time basis and will be used for other work on the project, it should be carried on the equipment account at actual hours used.
+
==751.36.3 Pile Point Reinforcement==
  
If equipment must be shipped to the project specifically for force account work, the shipping costs are reimbursable. Such costs should be carried in the equipment account by listing the unit involved and showing the shipping cost under amount. Write in the invoice number, noting it as shipping cost, under the rate headings.
+
Pile point reinforcement is also known as a pile tip (e.g., pile shoe or pile toe attachments).  
  
For the time required to move the equipment to and from the site of the ex work and any authorized standby time, the rate will be 50% of the hourly rate after the actual operating costs have been deducted.
+
===751.36.3.1 Structural Steel HP Pile===
  
===109.5.3 Force Account Record, Summary of Costs===
+
Pile point reinforcement shall be required for all HP piles required to be driven to bear on rock regardless of pile strength used for design loadings or geomaterial (soils with or without gravel or cobbles) to be penetrated. Pile point reinforcement shall be manufactured in one piece of cast steel. Manufactured pile point reinforcements are available in various shapes and styles as shown in FHWA-NHI-16-010, Figure 16-5.  
  
The Summary of Costs, [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account Spreadsheet], is prepared in quadruplicate when the force account work has been completed.
+
===751.36.3.2 Cast-In-Place (CIP) Pile===
  
On the Summary, place in the upper right corner the number of the original authorizing change order. Complete the description and location of work in considerable detail.
+
For CIP piles, use pile point reinforcement if boulders or cobbles or dense gravel are anticipated.
  
Give the original to the contractor. Retain the fourth copy in the resident engineer's file. Send the other two copies to the district office for checking.
+
Geotechnical Section shall recommend when pile point reinforcement is needed and type of pile point reinforcement on the Foundation Investigation Geotechnical Report.
  
One copy sent to the district office is to be accompanied by a copy of each daily report for checking. The daily reports, after checking, are to be filed with the district copy of
+
<u>For Closed Ended Cast-In-Place Concrete Pile (CECIP)</u>
the Force Account Record Summary of Costs.
 
  
==109.6 Method of Payment (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.6])==
+
Two types are available.
  
Contractor payments are made electronically to the contractor’s designated financial institution on the basis of the payment estimate which is created twice a month when work on a contract is active.
+
:'''1. “Cruciform”''' type should be used as recommended and for hard driving into soft rock, weathered rock, and shales. It will continue to develop end bearing resistance while driving since an exposed flat closure plate is included with this point type. The closure plate acts to distribute load to the pile cross sectional area.
 +
:'''2. “Conical”''' type should be used as recommended and when there is harder than typical driving conditions, for example hard driving through difficult soils like heavily cobblestoned, very gravelly, densely layered soils. Severely obstructed driving can cause CIP piles with conical points to deflect. Conical pile points are always the more expensive option.  
  
Payment estimates must be supported by documentary evidence that work items allowed have actually been done. Evidence may be in the form of scale tickets, diary entries, material receipts, etc. The payment estimate is intended to provide payment to the contractor for all work performed during the estimate period. In no case should payment for work be delayed beyond the estimate period following the period in which the work was performed.
+
<u>For Open Ended Cast-In-Place Concrete Pile (OECIP)</u>
  
Earthwork quantities may, for example, be supported by load count entries in the inspector's diary. Another way is by diary entries giving limiting stations of completed balances.  
+
One type is available.
  
Weight or volume tickets are a sound basis for allowing payment on items measured in this manner.  
+
:'''“Open Ended Cutting Shoe”''' type should be used as recommended and when protection of the pipe end during driving could be a concern. It is also useful if uneven bearing is anticipated since a reinforced tip can redistribute load and lessen point loading concerns.  
  
Check all items against inspection records to be sure they are properly approved.  
+
:Open ended piles are not recommended for bearing on hard rock since this situation could create inefficient point loading that could be structurally damaging.
  
:Provide equitable payment. If work remains to be done (for example, patching the tie holes in concrete) allowance for the appropriate pay item should be reduced. The reduction should be the amount estimated as the cost of completing the work. Make allowance in full for all completed items.  
+
When Geotechnical Section indicates that pile point reinforcement is needed on the boring log, then the recommended pile point reinforcement type shall be shown on the plan details. Generally this information is also shown on the Design layout.
  
:Items to be paid for by [http://sp/sites/tp/Pages/default.aspx Planning] in connection with weight station complexes are to be included on the regular Engineer's Payment Estimate. At conclusion of this work, a certification is to be submitted with the estimate stating that the scales and material used met specification requirements.  
+
For pile point reinforcement detail, see
 +
<center>
 +
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 +
|+
 +
| style="background:#BEBEBE" width="400" |'''[http://www.modot.org/business/consultant_resources/bridgestandards.htm Bridge Standard Drawings]'''
 +
|-
 +
|align="center"|[http://www.modot.org/business/standard_drawings2/pile_new_title_block.htm Pile]
 +
|}
  
:[http://www.modot.mo.gov/business/contractor_resources/biditemslisting.htm Bid items] not covered in the bid item master list will be indicated in the description block by the term "Miscellaneous" and supplemental number. The resident engineer may insert an abbreviated description using AWP.
+
</center>
 
:Engineer's Payment Estimates should be submitted for liquidated damages even when no pay items are listed. Such estimates indicate a negative amount due the contractor; accordingly, no payment can be made and no further action is taken.
 
  
==109.7 Partial Payments (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.7])==
+
==751.36.4 Anchorage of Piles for Seismic Details==
  
Partial payments are payments made over the course of the contract each estimate period, and payments made for material allowance.
+
===751.36.4.1 Structural Steel HP Pile - Details===
 +
'''<font color="purple">[MS Cell]</font color="purple">'''
  
===109.7.1 Payment Estimates===
+
Use standard seismic anchorage detail for all HP pile sizes. Modify detail (bolt size, no. of bolts, angle size) if seismic and geotechnical analyses require increased uplift resistance. Follow AASHTO 17th Ed. LFD or AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS).
  
[[:Category:101 Standard Forms#Contractor Pay Estimates|Payment estimates]] [[image:bulldozer.jpg|20px]] are generated by the AWP computer software application.
+
:[[image:751.36.4.1 2022.jpg|center|450px]]
  
'''109.7.1.1.''' Estimates will be generated for all active contracts, regardless of the amount of payment encountered during the estimate period.  This includes all estimates for contracts which will produce payment, "no pay" estimates (zero dollar value) and estimates which result in a negative payment.
+
===751.36.4.2 Cast-In-Place (CIP) Pile - Details===
 +
<center>
 +
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 +
|+
 +
| style="background:#BEBEBE" width="300" |'''[http://www.modot.org/business/consultant_resources/bridgestandards.htm Bridge Standard Drawings]'''
 +
|-
 +
|align="center"|[http://www.modot.org/business/standard_drawings2/pile_new_title_block.htm Pile]
 +
|}
 +
</center>
  
Should the contract be inactive and a series of estimates will be no pay estimates, a letter or e-mail shall be sent to the contractor with a copy to the controller's office stating estimates will not be generated during the following time periods because there is no work conducted on the contract. The controller's office will record this information and will not contact the Resident Engineer because estimates haven't been generated for a specific time period.
+
==751.36.5 Design Procedure==
  
'''109.7.1.2.''' The first level of estimate generation will be designated by the Resident Engineer at the time of contract activation.  The Resident Engineer will notify the AWP Administrator who this person shall be.  This person must have project manager access to the system. 
+
*Structural Analysis
 +
*Geotechnical Analysis
 +
*Drivability Analysis
  
Progress estimates will be generated for estimate end dates of, generally, the 1st and 15th of each month. The controller's office will issue a chart of estimate due dates annually. AWP estimates must be approved by Level 2 (Resident Engineer) no later than 4:00 PM on the day listed on the chart as "Due in Controller's Office."
+
===751.36.5.1 Design Procedure Outline===
  
'''109.7.1.3.''' Estimates may be generated repeatedly prior to the estimate ending date, in order to resolve discrepancies or check quantitiesTwo payment estimates shall be made per month for active contracts. The official pay estimates shall be generated with the period ending dates of the 1st and the 15th, making the estimate periods typically the 2nd day of the month to the 15th day, and the 16th day to the 1st of the following month. There may be exceptions to the estimate periods depending upon the financial systems such as the end of the state fiscal year. Other exceptions may be made to the estimate period depending on the status of the contract or as notified otherwise by the AWP Administrator and in the first paragraph of EPG 109.7.1.4, below.
+
*Determine foundation load effects from the superstructure and substructure for Service, Strength and Extreme Event Limit States.  
 +
*If applicable, determine scour depths, liquefaction information and pile design unbraced length information.
 +
*Determine if downdrag loadings should be considered.
 +
*Select preliminary pile size and pile layout.
 +
*Perform a Static Pile Soil Interaction AnalysisEstimate Pile Length and pile capacity.
 +
*Based on pile type and material, determine Resistance Factors for Structural Strength (<math>\, \phi_c</math> and <math>\, \phi_f</math>).
 +
*Determine:
 +
**Maximum axial load effects at toe of a single pile
 +
**Maximum combined axial & flexural load effects of a single pile
 +
**Maximum shear load effect for a single pile
 +
**Uplift pile reactions
 +
*Determine Nominal and Factored Structural Resistance for single pile
 +
**Determine Structural Axial Compression Resistance
 +
**Determine Structural Flexural Resistance
 +
**Determine Structural Combined Axial & Flexural Resistance
 +
**Determine Structural Shear Resistance
 +
*Determine method for pile driving acceptance criteria
 +
*Determine Resistance Factor for Geotechnical Resistance (<math>\, \phi_{stat}</math>) and Driving Resistance (<math>\, \phi_{dyn}</math>).
 +
*If other than end bearing pile on rock or shale, determine Nominal Axial Geotechnical Resistance for pile.
 +
*Determine Factored Axial Geotechnical Resistance for single pile.
 +
*Determine Nominal pullout resistance if pile uplift reactions exist.
 +
*Check for pile group effects.
 +
*Resistance of Pile Groups in Compression 
 +
*Check Drivability of all pile (bearing and friction pile) using the Wave equation analysis.
 +
*Review Static Pile Soil Interaction Analysis and pile lengths for friction pile.  
 +
*Show proper Pile Data on Plan Sheets ([https://epg.modot.org/index.php/751.50_Standard_Detailing_Notes#E2._Foundation_Data_Table Foundation Data Table]).
  
All indexes based upon a monthly index value shall use the same index value for the entire estimate period even though the index value may be reestablished on the 1st of the month. For example the asphalt and fuel index values change on the 1st of the month, but any work completed on the 1st shall use the same index value as the previous month so that the entire 16th to 1st estimate period uses the same index value.
+
===751.36.5.2 Structural Resistance Factor (ϕ<sub>c</sub> and ϕ<sub>f</sub>) for Strength Limit State===
 +
{| style="margin: 1em auto 1em auto"
 +
|-
 +
|align="right" width="850"|'''LRFD 6.5.4.2'''
 +
|}
  
Estimates can be re-generated without deleting the existing estimate from the Estimate History window.  Do not use the "delete" option to delete an estimate. To re-generate an estimate for a pay period, just generate that estimate. The system will indicate that an estimate already exists for the period, and will prompt “Would you like to delete?” (meaning to overwrite the existing estimate.) Select "Yes", which will reset the tables and the estimate will be generated containing any new information that has been added.  
+
'''For integral end bent simple pile design,''' use Φ<sub>c</sub> = 0.35 for CIP steel pipe piles and HP pilesSee [[751.35 Concrete Pile Cap Integral End Bents#751.35.2.4.2 Pile Design|Figure 751.35.2.4.2]].
  
'''109.7.1.4.''' The progress estimate for the period ending July 1 of each year shall be changed by the user to the period ending date of June 30th, prior to estimate generation.  This change shall be made to coincide with the MoDOT Fiscal Year End cycle.
+
'''For pile at all locations where integral end bent simple pile design is not applicable,''' use the following:
  
Supplemental estimates will not be generated unless specifically instructed to do so by the AWP administrator.
+
::The structural resistance factor for axial resistance in compression is dependent upon the expected driving conditions. When the pile is subject to damage due to severe driving conditions where use of pile point reinforcement is necessary:
  
Final Estimates shall be generated by the Resident Engineer prior to submission of the final plans to the District for checking. When logged into the system as a Resident Engineer, only final estimates can be generated.  For a Resident Engineer to generate a progress estimate, they must log in as a project manager.
+
:::Steel Shells (Pipe): <math> \phi_c </math>= 0.60
 +
:::HP Piles: <math> \phi_c </math>= 0.50
  
'''109.7.1.5.''' Payment estimates must be supported by documentary evidence that work items allowed have actually been done. Evidence may be in the form of scale tickets, diary entries, material receipts, etc. Earthwork quantities may, for example, be supported by load count entries in the inspector's remarks. Another way is by remarks entries giving limiting stations of completed balances.  Weight or volume tickets are a sound basis for allowing payment on items measured in this manner.  The payment estimate is intended to provide payment to the contractor for all work performed during the estimate period. In no case should payment for specification compliant  and accepted work be delayed beyond the estimate period following the period in which the work was performed.
+
::When the pile is subject to good driving conditions where use of pile point reinforcement is not necessary:
  
Check all items against inspection records to be sure they are properly approved.
+
:::Steel Shells (Pipe) Piles: <math> \phi_c </math>= 0.70
 +
:::HP Piles: <math> \phi_c </math>= 0.60
  
'''109.7.1.6.''' The Division Final Plans Reviewer shall notify the Resident Engineer when the final estimate is approved and the final plans are passed for payment. Once the Resident Engineer receives the notification, the Resident Engineer will send the prime contractor the Estimate Summary Report(s) for the final estimate as outlined below:
+
::For HP piles, pile point reinforcement is always required when HP piles are anticipated to be driven to rock and proofed. Driving HP piles to rock is considered severe driving conditions for determination of structural resistance factor. However, driving HP piles through overburden not likely to impede driving to deep rock or preboring to rock for setting piles are two situations that could be considered as less than severe. Further, driving any steel pile through soil without rubble, boulders, cobbles or very dense gravel could be considered good driving conditions for determination of structural resistance factor. Consult the Structural Project Manager or Structural Liaison Engineer.  
  
:'''General:'''  The Cognos report “Estimate Summary for Contract, By Estimate Number” is the official estimate report to send to the prime contractor on all MoDOT contracts administered through AWP.  This will establish the policy and procedure related to this function of AWP.
+
::The structural resistance factor for combined axial and flexural resistance of undamaged piles:
 +
:::Axial resistance factor for HP Piles: <math> \phi_c </math>= 0.70
 +
:::Axial resistance for Steel Shells (Pipe): <math> \phi_c </math>= 0.80
 +
:::Flexural resistance factor for HP Piles or Steel Shells: <math> \phi_f </math>= 1.00
  
: Prior to producing this report, it shall be the responsibility of the Resident Engineer to verify the accuracy of the estimate and to approve the estimate in AWP. The Resident Engineer will make this verification by confirming the Last Approver ID is the User ID of the Resident Engineer in the Estimate Summary of each contract.
+
::For Extreme Event Limit States, see LRFD 10.5.5.3.
  
: After the RE has verified the estimate has been approved at the Resident Engineer level, the Estimate Summary for Contract, By Estimate Number shall be electronically saved as a .pdf file in eProjects. Refer to [[:category:137 Construction Inspection Guidance for Records to be Maintained|EPG 137 Construction Inspection Guidance for Records to be Maintained]] for more information on saving reports produced from AWP or information retrieved from AWP.
+
<div id="751.36.5.3 Geotechnical Resistance"></div>
  
===109.7.2 Material Allowance===
+
===751.36.5.3 Geotechnical Resistance Factor (ϕ<sub>stat</sub>) and Driving Resistance Factor (ϕ<sub>dyn</sub>)===
 +
{| style="margin: 1em auto 1em auto"
 +
|-
 +
|align="center" width="850"|'''LRFD Table 10.5.5.2.3-1'''
 +
|}
  
Under [https://epg.modot.org/forms/CM/AWP_CO_Construction_Stockpiles.doc stockpile materials] should appear those items for which a payment may be made in accordance with the general requirements. Check the specification for the minimum acceptable material allowanceNon-perishable items to be incorporated in the finished product may, in general, be included on the estimate for stockpile materials provided satisfactory inspection reports, certifications or mill test reports and required invoices are in the project file. When the item first appears on the estimate, the resident engineer must have on file a copy of an invoice to substantiate the unit prices allowed. Receipted bills for all materials allowed on the estimate must be furnished to the resident engineer within the time established by specifications, or the item must be eliminated from future estimates. Missouri state sales tax may be included in material allowances if shown on invoices or receipted bills. Each receipted bill must be marked or stamped paid with date of payment shown, as well as the name of the firm and signature of the person who received payment. All invoices and receipted bills obtained to substantiate material allowances during progress of the project are to be filed in the district as part of the permanent project record.  
+
The factors for Geotechnical Resistance (<math> \phi_{stat}</math>) and Driving Resistance (<math> \phi_{dyn}</math>) will usually be different because of the different methods used to determine the nominal bearing resistanceCaution should be used if the difference in factors for Geotechnical Resistance and Driving Resistance are great as it can lead to issues with pile overruns. Also see [[#751.36.5.9 Estimate Pile Length and Check Pile Capacity|EPG 751.36.5.9]].
  
Some aggregates are accepted for "quality only" at the point of production. Total acceptance is not made at the time of production because additional processing and/or screening are required before incorporation into the final product. If gradation tests, which are run for information purposes only, indicated it is reasonably possible to produce an acceptable finished product, this material may be included in the stockpile material payment.
+
'''Geotechnical Resistance Factor, <math> \phi_{stat}</math>:'''
 
If test reports or visual inspection on the above material or other material that might be produced and accepted indicate that it will be unsatisfactory at a later date due to gradation, excess P.I., segregation, contamination, etc., these materials should not be included on the stockpile materials payment.
 
  
The price per unit for material produced by the contractor or by a producer other than an established commercial producer should reflect the actual cost of production. The units shown under material estimate should be the same unit of measure used in the bid item where possible, such as pound for steel, linear foot for piles, etc. Where this is not possible, a convenient unit such as ton for aggregate should be used. Quantities in excess of contract requirements should not be allowed. Hauling costs should not normally be included in the unit cost of any material unless it has been hauled to a site where it can immediately be incorporated in the finished product or work. If hauling cost is allowed, it must be considered with relation to the value of the material in case it is necessary for the state to take it over. Stockpiling costs are not to be included as part of the unit cost.  
+
The Geotechnical Resistance factor is based on the static method used by the designer in determining the nominal bearing resistance. Unlike the Driving Resistance factor the Geotechnical Resistance factor can vary with the soil layers. If Geotechnical Resistance factors are not provided by the Geotechnical Engineer, values may be selected from LRFD Table 10.5.5.2.3-1. For Extreme Event Limit States see LRFD 10.5.5.3.
  
Items that are to be accepted by project personnel must be inspected and found satisfactory prior to being included on a stockpile materials payment. Quantities for materials included on a stockpile materials payment should never exceed approved quantities.
+
'''Driving Resistance Factor, <math> \phi_{dyn}</math>:'''
  
Before an allowance will be approved for payment on material stockpiled or stored on private property, or for aggregates stored on property operated as a commercial business, a lease agreement from the contractor or subcontractor showing compliance with the following points must be submitted to the district office for approval.  
+
The Driving Resistance factor shall be selected from LRFD Table 10.5.5.2.3-1 based on the method to be used in the field during construction to verify nominal axial compressive resistance.  
  
:'''1.''' A complete land description covered in the lease form and the haul distance from the lease area to the project.
+
<center>
:'''2.''' The following statement included in the lease agreement:
+
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
:"It is understood and agreed by the parties hereto that the land herein involved is to be used as a materials storage site and that the prime contractor, whether or not the lessee herein, may obtain payment from the Missouri Highway and Transportation Commission for material stored thereon".
+
! Verification Method !! Resistance Factor,<br/><math> \phi_{dyn}</math>
:"It is further understood and agreed by the parties hereto that the prime contractor or contractor having a written agreement with the Missouri Highway and Transportation Commission for the construction of highway work involving this lease and the materials stored thereon, whether or not the lessee, and the employees of the Missouri Highway and Transportation Commission shall have the right of access to the property covered by this lease at all times during its existence and that in the event of default on the part of the lessee or the prime contractor, if other than lessee, the Missouri Highway and Transportation Commission may enter upon the property and remove said materials to the extent to which advance payments were made thereon".  
+
|-
:An area leased on property operated as a commercial business must be posted so as to divorce the site for stockpiling of highway materials from the commercial operation.
+
|FHWA-modified Gates Dynamic Pile Formula<br/>(End of Drive condition only)||0.40
:If either party to the lease agreement is incorporated, it is essential that an Acknowledgment by Corporation be attached for each corporation involved since an individual cannot legally bind a corporation without duly enacted authorization by the corporation's Board of Directors. A suitable form for this purpose is shown in ''Agreement for Shifting State Highway Entrance'', page 1. Other forms may be used by some corporations and are acceptable if they fulfill the intent of the form illustrated. Leases involving corporations should not be accepted without the Acknowledgment.  
+
|-
:Signatures by individuals must be notarized, or be witnessed by at least two disinterested persons. The address of witnesses should be shown.
+
| Wave Equation Analysis (WEAP) || 0.50
:When material is stored on property owned by a railroad and is accessible by a public roadway, it is not necessary to obtain a lease agreement to permit this material to be placed on the estimate as a stockpile material.  
+
|-
:If hauling charges are to be included as part of the cost of materials allowed for payment, invoices for hauling charges must be provided by the contractor in the same manner as invoices for the material. An exception to this requirement is allowance for the cost of the rail freight. For rail freight the contractor should supply a copy of the first freight bill to substantiate the freight rate. In lieu of submitting receipted freight bills, the contractor may then sign a statement on each material invoice indicating that freight charges have been paid. If the contractor prefers, a letter may be submitted listing several invoices and indicating freight charges that have been paid. Whichever procedure is adopted, the resident engineer must be assured that freight charges have been indicated as paid for all materials invoices submitted to verify quantities.  
+
| Dynamic Testing (PDA) on 1 to 10% piles||0.65
:The engineer may also include in any payment estimate an amount not to exceed 90 percent of the invoice value of any inspected and accepted fabricated structural steel items, structural precast concrete items, permanent highway signs, and structural aluminum sign trusses. These items must be finally incorporated in the completed work and be in conformity with the plans and specifications for the contract. These items may be stored elsewhere in an acceptable manner provided approved shop drawings have been furnished covering these items and also provided the value of these items is not less than $25,000 for each storage location for each project.
+
|-
:The engineer may also include in any payment estimate, on contracts containing 100 tons or more of structural steel, an amount not to exceed 100 percent of the receipted mill invoice value of structural carbon steel or structural low alloy steel, or both, which is to form a part of the completed work and which has been produced and delivered by the steel mill to the fabricator.
+
|Other methods||Refer to LRFD Table 10.5.5.2.3-1
 +
|}
 +
</center>
  
While the nature and quality of material is the contractor’s responsibility until incorporated into the project, material presented for stockpile materials payment must be inspected prior to being approved for payment. The nature of that inspection is at the discretion of the engineer and may include sampling and testing to determine whether the material has a reasonable potential of compliance, once incorporated into the project. This sampling and testing may occur wherever the material is offered for stockpile materials payment, including stockpiles in quarries and at other off-project sites. Material that is a component of a mix may be compared to the associated mix design or to any other specification criteria that may apply.
+
Use [https://epg.modot.org/index.php/751.50_Standard_Detailing_Notes#G7._Steel_HP_Pile EPG 751.50 Standard Detailing Note G7.3] on plans as required for end bearing piles driven to rock. This requirement shall apply to any type of rock meaning weak to strong rock including stronger shales where HP piling is anticipated to meet refusal. The verification method shown on the plans is only used to verify the nominal axial compressive resistance prior to reaching practical refusal. If the practical refusal criterion is met the field verification method shown on the plans is no longer considered valid.
  
==109.8 Final Acceptance and Payment (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.8])==
+
For end bearing piles tipped in shale, sandstone, or rock of uncertain strength at any loading where the likelihood of pile damage is increased, the Foundation Investigation Geotechnical Report (FIGR) should give a recommendation for dynamic pile testing (PDA) or no PDA. For most end bearing piles, where a recommendation for field verification is not given in the FIGR, the designer will need to determine whether gates or WEAP is required for the pile driving verification method based on the loading demands on the pile or other factors.
In addition to confirmation of final quantities, all other adjustments to the contract amount should be reviewed and verified prior to making final payment to the contractor. See [[:Category:105 Control of Work#105.15.2 Final Acceptance|EPG 105.15.2]] for guidance on the Final Acceptance process.
 
  
'''[https://epg.modot.org/forms/CM/Contractors_Affidavit_C-242.pdf Contractor's Affidavit Regarding Settlement of Claims (C-242)]'''
+
For piles bearing on hard rock with MNACR less than 600 kips, FHWA-modified Gates Dynamic Pile Formula should be listed as verification method, and practical refusal criterion should control end of driving criteria. FHWA-modified Gates Dynamic Pile Formula is not considered accurate for pile loading (Minimum Nominal Axial Compressive Resistance) exceeding 600 kips. When pile loading exceeds 600 kips, use wave equation analysis, dynamic testing, or other method. Consideration should be given to using additional piles to reduce the MNACR below 600 kips.
  
'''[https://epg.modot.org/forms/CM/Contractors_Affidavit_C-242_With_Exceptions.pdf Contractor's Affidavit Regarding Settlement of Claims (C-242) with Exceptions]'''
+
Under special circumstances when rock limits or conditions are nonuniform, WEAP should be considered in order to limit pile damage since it requires further scrutiny of the site conditions with the proposed pile driving system.
 +
 +
Dynamic Testing is recommended for projects with friction piles.
  
'''Addressing claims from creditors (e.g. supplier, sub, etc.) against the prime contractor:'''
+
===751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction===
  
Intervening in pay disputes between the prime and their creditors should be limited to facilitation efforts by the RE. The RE should contact the prime, discuss details of the payment issue, and advise of Missouri’s Prompt Payment Law if there is not a valid reason for their delay in payment.  If no resolution can be facilitated, provide the creditor with the Surety’s name and contact information, as listed in the contract bond. Also, note the name and nature of the dispute for a reference when the C-242 is received at the completion of the job. Pay retainage should not be withheld from the estimate because of a creditor claim. Payments should not be made to the Surety unless the contract is declared to be in default and the Surety submits a formal letter requesting all future contractor payments go directly to them. If the dispute is not resolved prior to the [[:Category:105 Control of Work#105.15.1.4 Acceptance for Maintenance (Final Inspection)|Final Inspection]], provide the contractor with the [https://epg.modot.org/forms/CM/Contractors_Affidavit_C-242_With_Exceptions.pdf Contractor's Affidavit Regarding Settlement of Claims (C-242) with Exceptions] form so that they can list all pay disputes and state the reason why full payment was not made. Contact the Division of Construction and request authorization to close out the job despite the unsettled claim(s). Projects will typically be authorized for closure unless the dispute is deemed to directly involve the Commission.  If the pay dispute involves a Disadvantaged Business Enterprise (DBE), advise External Civil Rights of the details surrounding the dispute.
+
Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), '''LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8.'''
  
==109.9 Retained Percentage (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.9])==
+
Downdrag, liquefaction and scour all reduce the available skin friction capacity of piles. Downdrag <math>\, (DD)</math> is unique because it not only causes a loss of capacity, but also applies a downward force to the piles. This is usually attributed to embankment settlement. However, downdrag can also be caused by a non-liquefied layer overlying a liquefied layer. Review geotechnical report for downdrag and liquefaction information.
  
Formal retainage is no longer designated by MoDOT as a routine part of the contract however [https://revisor.mo.gov/main/OneSection.aspx?section=34.057 34.057 RSMo] does allow up to 10% of the contract price to be retained in order to ensure performance of the contract.  Payment may be withheld on any particular work item that has not been completed in accordance with the contract.  This can include work incidental to the work item, and required documentation directly related to the work.
+
===751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile ===
  
==109.10 Contract Assignment Process - Contract Reassignment to a New Contractor (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.10])==
+
The PNDC equations provided herein assume the piles are continually braced. This assumption is applicable for the portion of piling below ground or confined by solid wall encasement. If designing a pile bent structure, scour exists or liquefaction exists, then the pile shall be checked considering the appropriate unbraced length.
  
The Missouri Highway and Transportation Commission (MHTC) and MoDOT advertise construction projects, open bids and award several hundred contracts each year. Typically, the awarded contractor performs the work, with subcontractors, through completion and the contract is closed out.  Sometimes contractors may be purchased by other contractors, may have taken on too much work, or decide for other reasons not to finish a contract they were awarded, and then wish to make an arrangement with another contractor to complete the project(s) under the same contract conditions.  MoDOT has prepared for this slight possibility with a process for transferring the contract to a new prime contractor by reassigning the contract through an “Assignment Agreement”, subject to consent and approval by the MHTC.  [http://sp/sites/cc/Pages/default.aspx Chief Counsel's Office] has created [[153.7 Construction and Materials|template assignment agreements for the typical scenarios]].  [http://sp/sites/cm/Pages/default.aspx The Construction and Materials Division] is responsible for working with the contractors to process the assignment agreement allowing the new contractor to work on the project and collect payment from MoDOT. 
+
'''Structural Steel HP Piles'''
  
Although the original contract remains in place, the assignment agreement assigns responsibilities for completing the contract to the new contractor. MoDOT does not pay any additional compensation to the contractor when agreeing to an assignment, nor does either contractor pay MoDOT any compensation for the transfer.  The original contractor (assignor) and the new contractor (assignee) have their own agreement regarding this transaction which sometimes includes transferring other assets from one contractor to the other.  MoDOT is only concerned with continuing surety protection while the work is still active and completing the contract on time and within budget.  MoDOT and the MHTC could object to a transfer, but the likely outcome is a situation where the original prime contractor has been purchased, has no assets remaining and their surety would have to be engaged to complete the work.  Therefore, consenting to the assignment is generally in the best interest of all involved parties and likely the best way to get work completed in these situations. 
+
:<math>\, PNDC = 0.66^\lambda F_y A_S</math>
  
Once a contract is reassigned, the new contractor (assignee) is the responsible contractor that MoDOT expects to and is contractually obligated to complete the work, will be paid for work completed and will be held accountable to finish the contract on time and within budget.  MoDOT will change the information in the contract administration system to recognize the new contractor and the Resident Engineer’s office will be notified of the changes.  See the [[media:109.10 transfer.xlsx|Assignment Matrix]] for the details of the reassignment process.
+
:Since we are assuming the piles are continuously braced, then <math>\,\lambda</math>= 0.  
  
==109.11 Compensation for Project Delays (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.11])==
+
:{|
 +
|<math>\, F_y</math>||is the yield strength of the pile
 +
|-
 +
|<math>\, A_S</math>||is the area of the steel pile
 +
|}
  
Sec 109.11 designates the conditions for which compensation may be appropriate to cover the cost of a project delay. Review the specification and refer any questions to the  [http://sp/sites/cm/Pages/default.aspx Construction and Materials] Division.
+
'''Welded or Seamless Steel Shell (Pipe) Cast-In-Place Piles (CIP Piles)'''
  
===109.11.1 Documentation of Delay Costs===
+
:<math>\, PNDC = 0.85 f'_c Ac+F_y A_{st}</math>
When a delay has been determined to be compensable (that is, it was directly caused by the Commission), and the contractor has claimed impact costs due to the delay, reference Sec 109.11.1 for a list of eligible delay costs.  An additional 10% is added to the sum of these costs to account for home office overhead and all other costs.  The total of all costs, plus the 10% mark-up, should be summarized on a Documentation Record as supporting documentation for the lump sum delay cost change order.  The Force Account spreadsheet should not be used as those accounting methods are only for added work and include other mark-up rates for profit and overhead.
 
  
There are four categories for additional costs.  Below further clarifies what is included in each of these items.
+
:{|
:'''(a) Non-Salaried labor expenses. ''' This is most commonly for trade workers who are compensated on an hourly rate.  This would be for workers such as laborers, carpenters, iron workers etc.  During a delay there may be activities that need to still be ongoing.  This would include activities such as traffic control and erosion control.  Salaried workers are non-compensable.  These workers can be reassigned to other projects or perform other activities.  Their salary is ongoing and would be incurred regardless of the delay.  Labor rate increases are allowed.  For example, paving was to be performed in October and due to the delay, it could not be performed until May.  A labor rate increase went into effect in January.  Therefore, the net labor increase for the hours worked on the paving would be allowed. This does not apply to increases in prevailing wage rates as the original wage order remains in effect for the life of the project. The only mark-up for labor costs, prior to the 10% overall markup, should be inclusion of additives for insurance and taxes (FICA/FUTA/SUTA/General Liability/Work Comp).
+
|<math>\, F_y</math>||is the yield strength of the pipe pile
:'''(b) Material costs.'''  This is for an increase in costs for materials due to the delay.  Actual documented increases in costs for materials due to the delay is allowable.  For example, a bridge deck scheduled to be poured in October is now being poured in March due to the delay.  The concrete price was increased in January.  Therefore, the net increase in concrete material cost is allowed.
+
|-
:'''(c) Equipment costs.'''  This is the cost of on-site equipment that is idled.  It would not include trucks or other mobile equipment that can readily be relocated. The reimbursement method is outlined in detail in Sec 109.11.2. 
+
|valign="top"|<math>\, A_{st}</math>||is the area of the steel pipe (deducting 12.5 % ASTM tolerance and 1/16 inch corrosion where appropriate.)
:'''(d) Costs of extended job-site overhead.'''  These are ongoing costs such as the job site office, porta-potty rental, utilities, dumpster rental etc. that are extended due to the delay.  (It does not include cell phone costs which are portable and not tied to the project.) These costs are only compensated for the period from the original completion date to the extended completion date as a result of the delay.  This applies even if the contractor’s submitted schedule indicates they would have completed the project before the original completion date (since there is no guarantee that the project would have been completed ahead of the original completion date).
+
|-
 +
|<math>\, f'_c</math>||is the concrete compressive strength at 28 days
 +
|-
 +
|<math>\, Ac</math>|| is the area of the concrete inside the pipe pile
 +
|}
  
===109.11.2  Calculation of Equipment Delays===
+
:Maximum Load during pile driving = <math>\, 0.90 (f_y A_{st})</math>
Equipment costs should be limited to on-site equipment that remains inactive due to the compensable delay.  In lieu of computing actual ownership cost of the equipment, the Non-Active Use Standby Rate, as published in ''EquipmentWatch'', shall be used to calculate the costs of idle equipment owned by the contractor. Multiply the hourly standby rate by 8 hours for each full weekday/non-holiday elapsed during the delay.  If the delay extends for a month or more, use 176 hours/month.  For rented equipment, payment will be made per the actual rate in the rental agreement.
 
  
'''Long-Term Delays'''
+
Welded or Seamless Steel Shell shall be ASTM A252 Modified Grade 3 (50 ksi). ASTM A252 states “the wall thickness at any point shall not be more than 12.5% under the specified nominal wall thickness.” AASHTO recommends deducting 1/16” of the wall thickness due to corrosion (LRFD 5.13.4.5.2). Corrosion need not be considered at construction stage and for drivability analysis and static analysis. For drivability analysis and static analysis deduct 12.5% of specified nominal wall thickness (ASTM A252). For structural design deduct 12.5 % (ASTM A252) and 1/16” for corrosion (LRFD 5.13.4.5.2) from specified nominal wall thickness.
  
If the delay is anticipated to be long-term, such that the projected delay cost would exceed the cost to mobilize the equipment from/to the job site, the Resident Engineer should inform the contractor in writing that they have the option to mobilize the equipment off-site for use elsewhere. State the earliest possible date resumption of work is anticipated.  Clarify that payment for equipment standby costs will be made only from the start of the delay period through the date of the notice of the long-term delay. If the contractor chooses to mobilize the equipment off-site, actual mobilization costs from/to the site will also be paid. If the contractor chooses to leave the equipment on-site, no standby costs for equipment will be paid past the date of the Resident Engineer's notice.
+
===751.36.5.6 Preliminary Factored Axial Design Capacity (PFDC) of an Individual Pile ===
  
===109.11.3 Common Claims===
+
:PFDC = Structural Factored Axial Compressive Resistance – Factored Downdrag Load
No other overhead costs are reimbursable.  See Sec 109.11.3 for a list of common claims that are contractually ineligible.
 
  
==109.12 Change Orders==
+
===751.36.5.7 Design Values for Steel Pile===
 +
====751.36.5.7.1 Integral End Bent Simple Pile Design ====
 +
The following design values may be used for integral end bents where the simple pile design method is applicable per [[751.35 Concrete Pile Cap Integral End Bents#751.35.2.4.2 Pile Design|EPG 751.35.2.4.2 Pile Design]].  These values are not applicable for soils subject to liquefaction or scour where  unbraced lengths may alter the design.
  
The primary purpose of a change order is to document a supplemental change to the contract. The official definition, as stated in [https://www.modot.org/missouri-standard-specifications-highway-consthction Sec 101], is as follows:
+
=====751.36.5.7.1.1 Design Values for Individual HP Pile=====
  
:'''Change Order''' - ''A written order from the engineer to the contractor, as authorized by the contract, directing changes in the work as made necessary or desirable by unforeseen conditions or events discovered or occurring during the progress of the work.''
+
<center>
 +
F<sub>y</sub> = 50 ksi. End Bearing Piles (HP piles) anticipated to be driven to rock.
 +
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 +
!Pile Size!!A<sub>s</sub><br/>Area,<br/>sq. in.!!Structural<br/>Nominal<br/>Axial<br/>Compressive<br/>Resistance<br/>PNDC<sup>1,2</sup>,<br/>kips!!Φ<sub>c</sub><br/>Structural<br/>Resistance<br/>Factor<sup>4,5</sup>,<br/>LRFD 6.5.4.2!!Structural<br/>Factored<br/>Axial<br/>Compressive<br/>Resistance<sup>2,3,4</sup>,<br/>kips!!0.9*ϕ<sub>da</sub>*F<sub>y</sub><br/>Maximum<br/>Nominal<br/>Driving<br/>Stress,<br/>LRFD 10.7.8,<br/>ksi
 +
|-
 +
|HP 12x53|| 15.5|| 775|| 0.35|| 271|| 45.00
 +
|-
 +
|HP 14x73|| 21.4|| 1070|| 0.35|| 375|| 45.00
 +
|-
 +
|colspan="6" align="left"|'''<sup>1</sup>''' Structural Nominal Axial Compressive Resistance for fully embedded piles only. <br/><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Minimum Nominal Axial Compressive Resistance  =  Required nominal driving resistance, R<sub>ndr</sub><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; = (Maximum factored axial loads / ϕ<sub>dyn</sub>) ≤ Structural nominal axial compressive resistance, PNDC &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;LRFD 10.5.5.2.3<br/><br/>
 +
'''<sup>2</sup>''' Axial Compressive Resistance values shown above shall be reduced when downdrag is considered.
 +
<br/><br/>'''<sup>3</sup>''' Maximum factored axial load per pile  ≤  Structural factored axial compressive resistance.
 +
<br/><br/>'''<sup>4</sup>''' Values are applicable for Strength Limit States.
 +
<br/><br/>'''<sup>5</sup>''' Use (Φ<sub>c</sub>) = 0.35 instead of 0.5 for structural resistance factor (LRFD 6.5.4.2)
 +
<br/><br/><br/>'''Notes:
 +
<br/><br/>ϕ<sub>dyn</sub> = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; LRFD Table 10.5.5.2.3-1
 +
<br/><br/>For more information about selecting pile driving verification methods refer to [[751.36_Driven_Piles#751.36.5.3_Geotechnical_Resistance_Factor_.28.CF.95stat.29_and_Driving_Resistance_Factor_.28.CF.95dyn.29|EPG 751.36.5.3 Geotechnical Resistance Factor (ϕ<sub>stat</sub>) and Driving Resistance Factor (ϕ<sub>dyn</sub>)]]. 
 +
<br/><br/>Drivability analysis shall be performed for all HP piles using Delmag D19-42.  Do not show minimum hammer energy on plans.
 +
<br/><br/>Check drivability for all HP Pile in accordance with [[#751.36.5.11 Check Pile Drivability|EPG 751.36.5.11]]
 +
<br/><br/>For additional design requirements, see [[#751.36.5.1 Design Procedure Outline|EPG 751.36.5.1]].
 +
|}
 +
</center>
  
The second most primary purpose of the change order process is to ensure proper authority has been granted before proceeding with revisions in quantities or changes in scope of work, design concept, time or specifications. Changes in scope should be limited to the original intent, purpose and limits (length and width) of the job. In instances where proposed changes in scope go beyond these original job parameters, the change order shall be considered a major change order (Sequence 4). Significant scope changes require the State Construction and Materials Engineer to discuss the requested changes with the Asst. Chief Engineer prior to granting approval.
+
=====751.36.5.7.1.2 Design Values for Individual Cast-In-Place (CIP) Pile=====
  
Change orders must have approval at all required levels before the work proceeds. Exceptions are granted for routine or minor changes, or emergency revisions for which verbal approval has been granted. In rare cases it may be necessary to proceed with emergency measures without prior approval. In such cases, verbal approval should be sought as soon as practicable. Indicate in the DWR remarks the name of the individual who provided verbal approval. For change orders that provide payment for additional work, all attempts should be made to complete the process promptly so that the contractor can be compensated at the end of the pay period in which the work was performed.  
+
<center>
 +
Grade 3 F<sub>y</sub> = 45 ksi; F'<sub>c</sub> = 4 ksi; Structural Axial Compressive Resistance Factor, (Φ<sub>c</sub>)<sup>1,3</sup> = 0.35
 +
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 +
|-
 +
!colspan="8"|Unfilled Pipe For Axial Analysis<sup>2</sup>
 +
|-
 +
!Pile Outside Diameter O.D., in.!!Pile Inside Diameter I.D., in.!!Minimum Wall Thickness, in.!! Reduced Wall thick. for Fabrication (ASTM 252), in. !!A<sub>s</sub>,<sup>4</sup><br/>Area<br/>of<br/>Steel<br/>Pipe,<br/>sq. in.!!Structural<br/>Nominal<br/>Axial<br/>Compressive<br/>Resistance<br/>P<sub>n</sub><sup>5,6,7</sup>,<br/>kips!!Structural<br/>Factored Axial<br/>Compressive<br/>Resistance<sup>1,7,8</sup>,<br/>kips !!0.9*ϕ<sub>da</sub>*F<sub>y</sub>*A<sub>s</sub><br/>Maximum<br/>Nominal<br/>Driving<br/>Resistance<sup>6</sup>,<br/>LRFD 10.7.8,<br/>kips
 +
|-
 +
|rowspan="2"|14 ||13|| 0.5|| 0.44|| 18.47|| 831|| 291|| 748
 +
|-
 +
|12.75||0.625<sup>9</sup>||0.55||22.84||1028||360||925
 +
|-
 +
|rowspan="2"|16 ||15|| 0.5|| 0.44|| 21.22|| 955|| 334|| 859
 +
|-
 +
|14.75||0.625<sup>9</sup>||0.55|| 26.28|| 1183|| 414|| 1064
 +
|-
 +
|colspan="8" align="left"|'''<sup>1</sup>'''Values are applicable for Strength Limit States. <br/>'''<sup>2</sup>''' Use to determine preliminary number of pile and pile size. For piles predominantly embedded and tipped in cohesionless soils the maximum loads provided in [[#751.36.5.10 Pile Nominal Axial Compressive Resistance|EPG 751.36.5.10]] will control. <br/>'''<sup>3</sup>''' Use (Φ<sub>c</sub>) = 0.35 instead of 0.6 for structural axial compressive resistance factor (LRFD 6.5.4.2).  Since ϕ<sub>dyn</sub> >> Φ<sub>c</sub> the maximum nominal driving resistance may not control. <br/>'''<sup>4</sup>''' Corrosion NOT considered at construction stage and for drivability analysis and static analysis. For drivability analysis and static analysis use reduced pipe nominal wall thickness, 12.5%, for fabrication (ASTM A252).<br/>'''<sup>5</sup>''' Structural Nominal Axial compressive resistance for fully embedded piles only. <br/>'''<sup>6</sup>''' Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, R<sub>ndr</sub><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; = Maximum factored axial loads / ϕ<sub>dyn</sub> ≤ Structural nominal axial compressive resistance, P<sub>n</sub> and &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; LRFD 10.5.5.2.3<br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ≤ Maximum nominal driving resistance. <br/>'''<sup>7</sup>''' Axial Compressive Resistance values shown above shall be reduced when downdrag is considered. <br/>'''<sup>8</sup>''' Maximum factored axial load per pile ≤ Structural factored axial compressive resistance <br/>'''<sup>9</sup>''' 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.<br/>'''Notes: '''<br/>Drivability analysis shall be performed for all CIP piles (unfilled pipe) using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans. <br/>Check drivability for all CIP Pile in accordance with [[#751.36.5.11 Check Pile Drivability|EPG 751.36.5.11]]. <br/>Require dynamic pile testing for field verification for all CIP piles on the plans. <br/>ϕ<sub>dyn</sub> = 0.65 = Dynamic Testing resistance factor to be used to estimate nominal pile resistance during pile installation. This value may be increased if static load testing is specified per LRFD Table 10.5.5.2.3-1. <br/>For additional design requirements, see [[#751.36.5.1 Design Procedure Outline|EPG 751.36.5.1]].
 +
|}
 +
</center>
  
'''Environmental Change Orders''' - Any design changes that include disturbance of new areas on the project, or that include any other unplanned environmental impacts, should be reviewed by the Project Manager to determine if a request for environmental services is necessary prior to implementation.
+
====751.36.5.7.2 General Pile Design====
  
'''Job Order Contract Change Orders.'''  Job Order Contracts have unique contract terms that limit spending to a budgeted amount and often include pre-approved time extensions. Reference [[147.3 Job Order Contracting (JOC)#147.3.9 Change Order Approvals|EPG 147.3.9 Change Order Approvals]] for additional guidance on administration of change orders for Job Order Contracts.  
+
The following design values are recommended for general use where the simple pile design method is not applicable per [[751.35 Concrete Pile Cap Integral End Bents#751.35.2.4.2 Pile Design|EPG 751.35.2.4.2 Pile Design]].  These values are not applicable for soils subject to liquefaction or scour where unbraced lengths may alter the design.
  
===109.12.1 Change Order Preparation===
+
=====751.36.5.7.2.1 Design Values for Individual HP Pile=====
  
Change orders are generated in AWP, and subsequently displayed in pdf format using the appropriate Cognos change order form. Quick Reference Guides are provided below to provide detailsAll completed change orders and supporting documentation shall be in electronic format and stored in eProjects. Change orders shall be transmitted in the original electronic format and shall not be scannedInk-signed paper copies or scans from a contractor shall not be accepted. A QRG ([https://epg.modot.org/forms/CM/Digital_Signature_for_Adobe_Reader_DC_or_Pro_DC.docx Digital Signature for Adobe Reader DC or Pro DC]) is available to assist contractors with creation of their digital ID, and registration of that ID with MoDOT. The contractor shall also inform the RE in writing who they authorize to approve change orders on their behalf.
+
<center>
 +
F<sub>y</sub> = 50 ksi. End Bearing Piles (HP piles) anticipated to be driven to rock.
 +
{|border="1" style="text-align:center;" cellpadding="5" align="center" cellspacing="0"
 +
!Pile Size!!A<sub>s</sub><br/>Area,<br/>sq. in.!!Structural<br/>Nominal<br/>Axial<br/>Compressive<br/>Resistance<br/>PNDC<sup>1,2</sup>,<br/>kips!!Φ<sub>c</sub><br/>Structural<br/>Resistance<br/>Factor<sup>4</sup>,<br/>LRFD 6.5.4.2!!Structural<br/>Factored<br/>Axial<br/>Compressive<br/>Resistance<sup>2,3,4</sup>,<br/>kips!!0.9*ϕ<sub>da</sub>*F<sub>y</sub><br/>Maximum<br/>Nominal<br/>Driving<br/>Stress,<br/>LRFD 10.7.8,<br/>ksi
 +
|-
 +
|HP 12x53|| 15.5|| 775|| 0.5|| 388|| 45.00
 +
|-
 +
|HP 14x73|| 21.4|| 1070|| 0.5|| 535|| 45.00
 +
|-
 +
|colspan="6" align="left"|'''<sup>1</sup>''' Structural Nominal Axial Compressive Resistance for fully embedded piles only. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e., intermediate pile cap bent).<br/><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Minimum Nominal Axial Compressive Resistance  =  Required nominal driving resistance, R<sub>ndr</sub><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; = (Maximum factored axial loads / ϕ<sub>dyn</sub>) ≤ Structural nominal axial compressive resistance, PNDC &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;LRFD 10.5.5.2.3<br/><br/>
 +
'''<sup>2</sup>''' Axial Compressive Resistance values shown above shall be reduced when downdrag is considered.
 +
<br/><br/>'''<sup>3</sup>''' Maximum factored axial load per pile  ≤  Structural factored axial compressive resistance.
 +
<br/><br/>'''<sup>4</sup>''' Values are applicable for Strength Limit StatesModify value for other Limit States.
 +
<br/><br/><br/>'''Notes:
 +
<br/><br/>ϕ<sub>dyn</sub> = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; LRFD Table 10.5.5.2.3-1
 +
<br/><br/>For more information about selecting pile driving verification methods refer to [[751.36_Driven_Piles#751.36.5.3_Geotechnical_Resistance_Factor_.28.CF.95stat.29_and_Driving_Resistance_Factor_.28.CF.95dyn.29|EPG 751.36.5.3 Geotechnical Resistance Factor (ϕ<sub>stat</sub>) and Driving Resistance Factor (ϕ<sub>dyn</sub>)]].
 +
<br/><br/>Drivability analysis shall be performed for all HP piles using Delmag D19-42. Do not show minimum hammer energy on plans.
 +
<br/><br/>Check drivability for all HP Pile in accordance with [[#751.36.5.11 Check Pile Drivability|EPG 751.36.5.11]]
 +
<br/><br/>For additional design requirements, see [[#751.36.5.1 Design Procedure Outline|EPG 751.36.5.1]].
 +
|}
 +
</center>
  
'''Supplemental Documents.''' Supplemental contract documents that are pertinent to the change order directive, such as new or revised plan sheets, new or revised Job Special Provisions, revised cross-sections, etc., shall be merged with the change order form to create a single file in pdf format and saved to eProjects prior to sending to the contractor. 
+
=====751.36.5.7.2.2 Design Values for Individual Cast-In-Place (CIP) Pile=====
<div id="Supporting Documentation."></div>
 
'''Supporting Documentation.''' Any pertinent supporting documents (e.g. Contingent Item Price Check form, relevant emails, letter of agreed price, computation sheets, mock Force Account computations, etc.) that provide additional details of the change, or provide justification of a price for contingent work, should be saved in eProjects as Supporting Documentation. All supporting documents should be merged into a single pdf document for each change order (the Force Account spreadsheets will require conversion to pdf format). At a minimum, any change order that contains a new contingent item should have supporting documentation that justifies the agreed price.  More information on how to justify an agreed price can be found in [[#109.12.1.3 Contingent Items - Settlement for Cost|EPG 109.12.1.3 Contingent Items - Settlement for Cost]].  Time adjustment change orders require supporting documentation (e.g. weighted time-table computation, analysis of how an excusable delay impacted the critical path, negotiated settlement narrative, etc.), unless the change order reason is self-explanatory.
 
  
'''Final Change Order.'''  If a clean-up change order is necessary after project completion to adjust the quantity of one or more pay items to the final accepted amount, this is designated as the “Final” change order. If no final change order is necessary due to all quantities being updated to final status by previous change order(s), the contractor should be informed that records indicate no further quantity adjustments are needed and the project will be closed out, as is, with current quantities as listed on the most recent pay estimate.
+
<center>
 
+
Grade 3 F<sub>y</sub> = 45 ksi; F'<sub>c</sub> = 4 ksi; Structural Resistance Factor, (Φ<sub>c</sub>)<sup>'''1'''</sup> = 0.6
The following Quick Reference Guides provide detailed information on how to create a change order in AASHTOWARE Project and how to create the contractual pdf form:
+
{|border="1" style="text-align:center;" cellpadding="5" align="center" cellspacing="0"
::* [https://epg.modot.org/forms/CM/AWP_CO_1ChangeOrderOverview.doc AWP CO 1 Change Order Overview]
+
!colspan="8"|Unfilled Pipe For Axial Analysis<sup>2</sup>!!colspan="5"|Concrete Filled Pipe For Flexural Analysis<sup>3</sup>
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="300px" align="right"  
+
|-
 +
!Pile Outside Diameter O.D., in. !!Pile Inside Diameter I.D., in. !!Minimum Wall Thickness,<br/>in. !!Reduced Wall thick. for Fabrication (ASTM 252),<br/>in. !!A<sub>s</sub>,<sup>4</sup><br/>Area of Steel Pipe,<br/>sq. in.!!Structural Nominal Axial Compressive Resistance, P<sub>n</sub><sup>5,6,7</sup>,<br/>kips !!Structural Factored Axial Compressive Resistance<sup>1,7,8</sup>,<br/>kips !!0.9*ϕ<sub>da</sub>*F<sub>y</sub>*A<sub>s</sub><br/>Maximum<br/>Nominal<br/>Driving<br/>Resistance<sup>5,6</sup>,<br/>LRFD 10.7.8,<br/>kips !!Reduced Wall Thick. for Corrosion (1/16"), LRFD 5.13.4.5.2,<br/>in. !!A<sub>st</sub>,<sup>9</sup> Net Area of Steel Pipe,<br/>sq. in.!!A<sub>c</sub> Concrete Area,<br/>sq. in. !!Structural Nominal Axial Compressive Resistance PNDC<sup>5,7,10</sup>,<br/>kips!!Structural Factored Axial Compressive Resistance<sup>1,7,10</sup>,<br/>kips
 +
|-
 +
|rowspan="2"|14|| 13|| 0.5|| 0.44|| 18.47|| 831|| 499|| 748|| 0.375|| 15.76|| 133|| 1160|| 696
 +
|-
 +
|12.75||0.625<sup>'''11'''</sup>||0.55|| 22.84|| 1028|| 617|| 925|| 0.484|| 20.14|| 128|| 1340|| 804
 +
|-
 +
|rowspan="2"|16||15 ||0.5|| 0.44|| 21.22|| 955 ||573 ||859 ||0.375 ||18.11|| 177|| 1416|| 850
 +
|-
 +
|14.75||0.625<sup>'''11'''</sup>|| 0.55|| 26.28|| 1183|| 710|| 1064|| 0.484|| 23.18|| 171|| 1624|| 975
 
|-
 
|-
|<center>'''Change Order Examples'''</center>
+
|rowspan="2"|20||19 ||0.5|| 0.44|| 26.72|| 1202|| 721|| 1082 ||0.375|| 22.83|| 284|| 1991|| 1195
 
|-
 
|-
|[[media:109.12.1 Mobilization.pdf|Adjust Mobilization for Contract Bond]]
+
|18.75||0.625|| 0.55|| 33.15|| 1492|| 895|| 1343|| 0.484|| 29.27|| 276|| 2256|| 1354
 
|-
 
|-
|[[media:109.12.1 Chief Engineer.pdf|Chief Engineer Level]]
+
|rowspan="3"|24||23|| 0.5|| 0.44|| 32.21|| 1450|| 870|| 1305|| 0.375|| 27.54|| 415|| 2652|| 1591
 
|-
 
|-
|[[media:109.12.1 Division.pdf|Division Level]]
+
|22.75||0.625|| 0.55|| 40.03|| 1801|| 1081|| 1621|| 0.484|| 35.36|| 406|| 2973|| 1784
 
|-
 
|-
|[[media:109.12.1 RE.pdf|RE Level]]
+
|22.5 ||0.75||0.66|| 47.74|| 2148|| 1289|| 1933|| 0.594|| 43.08|| 398|| 3290|| 1974
 
|-
 
|-
|[[media:109.12.1 Time.pdf|Time Extension]]
+
|colspan="13" align="left"|'''<sup>1</sup>''' Values are applicable for Strength Limit States.  Modify value for other Limit States.
|}
+
<br/>'''<sup>2</sup>''' Use to determine preliminary number of pile and pile size. For piles predominantly embedded and tipped in cohesionless soils the maximum loads provided in [[#751.36.5.10 Pile Nominal Axial Compressive Resistance|EPG 751.36.5.10]] will control.
::* [https://epg.modot.org/forms/CM/AWP_CO_2ChangeOrderAddingNewItemorOverrunUnderrunExisting.doc AWP CO 2 Change Order Adding New Item or Overrun/Underrun of Existing Items]
+
<br/><br/>'''<sup>3</sup>''' Pipes placed in prebored holes in rock can use filled pipe capacity for axial plus flexural resistance. Therefore, number of piles should be based on this capacity assuming rock is infinitely more stiff. This recognizes that pile driving is not a concern.
::* [https://epg.modot.org/forms/CM/AWP_CO_3ChangeOrderTimeExtension.doc AWP CO 3 Change Order Time Extension]
+
<br/><br/>'''<sup>4</sup>''' Corrosion NOT considered at construction stage and for drivability analysis and static analysis. For drivability analysis and static analysis use reduced pipe nominal wall thickness, 12.5%, for fabrication (ASTM A252).
::* [https://epg.modot.org/forms/CM/AWP_CO_4ChangeOrderValueEngineering.doc AWP CO 4 Change Order Value Engineering]
+
<br/><br/>'''<sup>5</sup>''' Structural Nominal Axial compressive resistance for fully embedded piles only.  Value in table is a raw number and is the value used to determine the factored resistance. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e. Intermediate pile cap bent).
::* [https://epg.modot.org/forms/CM/AWP_CO_5ChangeOrderNoCostContractModification.doc AWP CO 5 Change Order, No Cost Contract Modification]
+
<br/><br/>'''<sup>6</sup>''' Minimum Nominal Axial Compressive Resistance  =  Required nominal driving resistance, R<sub>ndr</sub><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =  Maximum factored axial loads  / ϕ<sub>dyn</sub> ≤  Structural nominal axial compressive resistance, P<sub>n</sub> and &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;LRFD 10.5.5.2.3<br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;≤ Maximum nominal driving resistance.
::* [https://epg.modot.org/forms/CM/AWP_CO_6ChangeOrderMobilizationAndContractBond.doc AWP CO 6 Change Order, Mobilization and Contract Bond]
+
<br/><br/>'''<sup>7</sup>''' Axial Compressive Resistance values shown above shall be reduced when  downdrag is considered
::* [https://epg.modot.org/forms/CM/AWP_CO_7ChangeOrderApproval.doc AWP CO 7 Change Order Approval]
+
<br/><br/>'''<sup>8</sup>''' Maximum factored axial load per pile  ≤  Structural factored axial compressive resistance
::* [https://epg.modot.org/forms/CM/AWP_CO_Change_Order_Codes.doc AWP CO Change Order Codes]
+
<br/><br/>'''<sup>9</sup>''' Net area of steel pipe, A<sub>st</sub>, assumes a 12.5% fabrication reduction (ASTM A252) and 1/16" (LRFD 5.13.4.5.2) reduction in pipe nominal wall thickness for corrosion.
::* [https://epg.modot.org/forms/CM/AWP_CO_Change_Order_Reports.doc AWP CO Change Order Reports].
+
<br/><br/>'''<sup>10</sup>''' Use for lateral load analysis. Resistance value includes filled pipe based on net area of steel pipe, A<sub>st</sub> (12.5% fab. reduction and 1/16” corr. reduction in nominal pipe wall thickness).
 +
<br/><br/>'''<sup>11</sup>''' 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.  
 +
<br/><br/><br/>'''Notes:
 +
<br/><br/>Drivability analysis shall be performed for all CIP piles (unfilled pipe) using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans.
 +
<br/><br/>Check drivability for all CIP Pile in accordance with [[#751.36.5.11 Check Pile Drivability|EPG 751.36.5.11]].
 +
<br/><br/>Require dynamic pile testing for field verification for all CIP piles on the plans.
 +
<br/><br/>ϕ<sub>dyn</sub> = 0.65 = Dynamic Testing resistance factor to be used to estimate nominal pile resistance during pile installation. This value may be increased if static load testing is specified per LRFD Table 10.5.5.2.3-1. <br/><br/>For additional design requirements, see [[#751.36.5.1 Design Procedure Outline|EPG 751.36.5.1]].
 +
|}
 +
</center>
  
====109.12.1.1 Change Order Approval Level Criteria====
+
===751.36.5.8 Additional Provisions for Pile Cap Footings===
This article provides the criteria to determine the required approval level of a change order.  AWP assigns a sequence number to correspond with each approval level, as follows:
+
'''Pile Group Layout:'''
  
::Contractor level (Sequence 1) – Approval applied in AWP by the Construction Project Office Assistant.
+
P<sub>u</sub> = Total Factored Vertical Load.
  
:'''Non-major Change Orders:'''
+
Preliminary Number of Piles Required = <math>\, \frac{Total\ Factored\ Vertical\ Load}{PFDC}</math>
::RE level (Sequence 2)
 
::District level (Sequence 3)
 
  
:'''Major Change Orders:'''
+
Layout a pile group that will satisfy the preliminary number of piles required.  Calculate the maximum and minimum factored load applied to the outside corner piles assuming the pile cap/footing is perfectly rigid.  The general equation is as follows:
::Division level (Sequence 4)
 
::Chief Engineer/ Chief Financial Officer level (Sequence 5)
 
  
:FHWA Review (Sequence 6). If a project is designated for federal involvement for change orders on the PODI Matrix, and the change order is classified as district level or higher (i.e., Sequence 3, 4 or 5), review and approval by the Federal Highway Administration (Sequence 6) is required. RE level change orders do not require FHWA review.
+
Max. Load = &nbsp; <math>\, \frac {P_u}{Total\ No.\ of\ Piles} + \frac {M_{ux} Y_i}{\Sigma Y_i^2} + \frac {M_{uy} X_i}{\Sigma X_i^2}</math>
  
The change order approval level criteria are listed below and [https://epg.modot.org/forms/CM/Chg_Ord_Approval_Level_Chart.pdf available here in table form]:
+
Min. Load = &nbsp; <math>\, \frac {P_u}{Total\ No.\ of\ Piles} - \frac {M_{ux} Y_i}{\Sigma Y_i^2} - \frac {M_{uy} X_i}{\Sigma X_i^2}</math>
{|style="padding: 0.3em; margin-left:10px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="370px" align="right"
 
|-
 
|<center>'''[https://epg.modot.org/forms/CM/Chg_Ord_Approval_Level_Chart.pdf Change Order Approval Level Determination Chart]'''</center>
 
|-
 
|align="left"|This chart is a graphic presentation of the criteria stated in [[#109.12.1.1 Change Order Approval Level Criteria|EPG 109.12.1.1]]. All change orders require approval in AWP at Project Office Assistant role on behalf of the contractor (Sequence 1) AND the Resident Engineer role (Sequence 2).  If the change order exceeds any of the criteria displayed in this chart, it would also need to be approved at the additional Sequence(s) shown. The chart values are absolute values. The criteria that requires the highest sequence approval always prevails over other criteria.
 
|}
 
  
'''Non-major change orders (Change Order Sequence 2)''' approved by the Resident Engineer are:
+
The maximum factored load per pile must be less than or equal to PFDC for the pile type and size chosen. If not, the pile size must be increased or additional piles must be added to the pile group. Reanalyze until the pile type, size and layout are satisfactory.
:1. Any no-cost (zero dollar) change orders (used when the direct substitution of a particular line item with a contingent item does not generate an additional cost or cost reduction).
 
:2. Any change in a contract or contingency item less than $50,000.
 
  
'''Non-major change orders (Change Order Sequence 3)''' that require approval from the district office, and by FHWA on projects designated for federal involvement on change orders on the PODI Matrix, are:
 
:1. Any change in a contract item or contingency item from $50,000 to $100,000.
 
:2. Any new contingency item from $50,000 to $100,000.
 
  
'''Major change orders (Change Order Sequence 4)''' that require approval from the division office, and by FHWA on projects designated for federal involvement on change orders on the PODI Matrix, are:
+
'''Pile Uplift on End Bearing Piles and Friction Piles:'''
:1. Any change in a contract or contingency item greater than $100,000.
 
:2. Any new contingency item greater than $100,000.
 
:3. Any specification change.
 
:4. Any revision in a contract unit price.
 
:5. Any change in a “Major Item” greater than 25% from the original contract amount for that line item (in dollars). A Major Item is defined in Sec 101 as, “having an original value in excess of 10% of the original contract amount.”
 
:6. Any change of the contract amount greater than 25% of the original contract bid amount (also in dollars).
 
:7. Any change in design concept.
 
:8. Any change order not approved by the contractor.
 
:9. Any change order for adjustments due to differing site conditions or significant changes in the character of the work.
 
:10. All value engineering change orders regardless of cost.
 
:11. Any change order granting a time extension.
 
  
'''Chief Engineer/Chief Financial Officer change orders (Change Order Sequence 5)''' meeting any of the three following criteria must have the concurrent approval of the Chief Engineer and the Chief Financial Officer, and FHWA approval for projects designated for federal involvement on change orders on the PODI Matrix:
+
:'''Service - I Limit State:'''
:1. Additions greater than 50% if the original contract amount was $500,000 or less.
 
:2. Additions greater than 25% if the original contract amount was greater than $500,000.
 
:3. Additions greater than $1,000,000.
 
  
====109.12.1.2 Description and Reason for Change====
+
::Minimum factored load per pile shall be ≥ 0.
The author of the change order should provide sufficient narrative to explain both the reason the change is needed and a description that clearly states any necessary contractual language to define the terms. Enough detail should be included to explain the circumstances to someone who may be unfamiliar with the issue, such as a reviewer or auditor. For contingent items, check to ensure controlling specifications are available that adequately define the work, including the method of measurement and basis of payment. Add any terms not covered by specifications or other contract language. For significant quantity changes, explain exactly what caused the overrun or underrun (e.g. grade change, incorrect shrinkage factor, error in Summary of Quantities, roadway width differed from typical section, additional asphalt needed due to excessive rutting, etc.). Slight quantity variations can be explained as “Final measured quantity, within normal tolerance".  
+
::Tension on a pile is not allowed for conventional bridges.
  
====109.12.1.3 Contingent Items - Settlement for Cost====
+
:'''Strength and Extreme Event Limit States:'''
When a MoDOT standard bid item exists for contingent work, use the item number and description from the [https://www.modot.org/bid-items-listing Bid Items Listing].  Miscellaneous “99” numbers are available in this listing for items that require a unique description.
 
  
If payment is to be made by force account settlement, use item number 109.4000 FORCE ACCOUNT, enter $1.00 for the unit price and set the quantity equivalent to the estimated cost.  The quantity will be adjusted after the work is complete to reflect the actual cost, as determined by the force account summary.
+
::Uplift on a pile is not preferred for conventional bridges.
 +
::Maximum Pile Uplift load = │Minimum factored load per pile│ - │Factored pile uplift resistance│ ≥ 0<sup>'''1'''</sup>
  
A “Settlement for Cost” statement should be included in the Description and Reason for Change field for all new contingent items.  Changes to contract pay items, or previously established contingent items, do not require this statement since the contract prices govern.  The “Settlement for Cost” statement, when required, should refer to the basis of settlement (i.e., agreed unit price, a fixed price listed in Standard Specifications, or [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account]). The settlement statement should also state the unit price.  Here are some examples of “Settlement for Cost” statements:
+
:::'''Note:''' Compute maximum pile uplift load if value of minimum factored load is negative.
:* “Settlement for cost of REPAIRING CONCRETE DECK (HALF-SOLING) shall be made at the agreed price of $69 per square foot.”
 
:* “Settlement for cost of CLASS 2 EXCAVATION IN ROCK shall be made at $170 per cubic yard, as specified in [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 109.16 Fixed Cost Items].”
 
:* “Settlement for cost for FORCE ACCOUNT-MODIFY EXISTING DRAIN GRATES, as specified herein, shall be made per Sec 109.5 Force Account Computation.
 
  
'''Justification of Agreed Price.''' Any contractor-proposed price for a contingent item shall be fully evaluated to ensure it is fair and reasonable before accepting it as the agreed price. Justification of the agreed price on any new contingent item shall be documented in eProjects as [[#Supporting Documentation.|Supporting Documentation]]. Documentation is typically made on the [https://epg.modot.org/forms/CM/Contingent_Item_Price_Check.pdf Contingent Item Price Check] form by comparing the agreed price to the Average Unit Bid Prices (BidTabs), or to a price for the same type of work on another area project. Sometimes documentation can be as simple as saving an email string that states the reason the price was deemed acceptable. For unique work for which no price comparison exists, or there are other factors that greatly affect the price, a detailed cost estimate (materials/equipment/labor) should be requested from the contractor that supports their proposal. If the RE concurs that the contractor’s breakdown of costs is reasonable, the price can be accepted. Another tool to arrive at an agreed price, especially for lump sum price quotes, is for project office staff to perform a mock [https://epg.modot.org/forms/CM/Force_Account_Spreadsheet.xlsx Force Account] analysis using anticipated materials, equipment and labor costs. If that total is reasonably close to the contractor’s proposal, the price can be accepted as an agreed price without invoking the force account process. If a price agreement cannot be reached, the RE should direct the contractor to proceed with the work under Force Account Computation per Sec 109.5.
+
::::<sup>'''1'''</sup> The minimum factored load (maximum tensile load) per pile should preferably not result in uplift for the Strength and Extreme Event Limit States. Pile uplift for the Strength and Extreme Event limit states may be permitted by SPM or SLE based on infrequent uplift load cases and small magnitudes of uplift. This decision is based on the presumed difficulty of a pile cap footing to rotate, specifically for it to be able to rotate on piles driven to rock. When pile uplift is allowed, the necessity of top pile cap reinforcement shall be investigated and the standard  anchorage detail for HP pile per [[#751.36.4.1 Structural Steel HP Pile - Details|EPG 751.36.4.1 Structural Steel HP Pile - Details]] shall be used.
  
All contingent work must be clearly defined (i.e., include a description of work, material requirements, construction requirements, method of measurement and basis of payment). References to the standard specifications may be used when available.
 
  
'''Settlement Clause''' (used only for settlement of a Claim or Controversy, as defined in Sec 101).  When a change order involves a negotiated settlement and final resolution of a contentious issue, in order to clarify the settlement is all-inclusive for any associated claims for costs, the following language is recommended for insertion into the change order description:
+
'''Resistance of Pile Groups in Compression'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;'''LRFD 10.7.3.9'''
:''"The amount being paid to <Construction Company> in this Change Order represents a negotiated settlement and, as such, reflects payment of all claims of <Construction Company> and/or any of its subcontractors and suppliers direct and indirect, including all impacts starting from the date of execution of the contract until the execution by both parties of the Change Order. However, nothing in this Change Order affects <Construction Company>'s right to file a claim based on an occurrence after the date of this Change Order."''
 
  
:Note: Delete the last sentence if the change order is being issued after all work on the project is complete.
+
If the cap is not in firm contact with the ground and if the soil at the surface is soft, the individual nominal resistance of each pile (751.36.5.5) shall be multiplied by an efficiency factor, <math>\eta</math>, based on pile spacing.
  
===109.12.2 Change Order Approval===
+
===751.36.5.9 Estimate Pile Length and Check Pile Capacity===
  
'''Preview for Sequence 3, 4 or 5 Change Orders.''' All draft Major change orders shall be submitted to the to the Construction Liaison Engineer for initial review prior to submitting to the contractor. Likewise, all district level change orders shall be sent to the DCE prior to submitting to the contractor. This is only considered initial approval, change orders sent to the contractor should not contain any MoDOT approval signatures. MoDOT approval and signing shall occur after the contractor digitally signs the change order.
+
====751.36.5.9.1 Estimated Pile Length====
  
Following any required previews, the RE will submit the completed change order to the contractor as an attachment to an email.  The contractor’s signature should be requested on all change order.  If the contractor refuses to sign a change order, their refusal should be documented and disclosed to any subsequent approvers (i.e., district or division level approvers). If the decision is made to execute the change order without the contractor’s signature, all other approval signatures will be applied, and the executed change order will be sent back to the contractor as a directive to proceed with the change in work.  If the unsigned change order includes new contingent item work, and no contract price or fixed price exists, payment for that portion of the work will need to be designated force account.
+
'''Friction Piles:'''
  
Once the digitally signed change order is returned from the contractor, the RE shall upload it to eProjects, sign, and then approve in AWP. For change orders that require district level or higher approval, the RE will then send an email to the District Construction Engineer with a direct link to the change order, along with a link to any supporting documentationIf the change order requires division level approval, the RE should also copy the Construction Liaison Engineer. After approval has been completed at the district level, the DCE will forward the email on to the Construction Liaison Engineer if division level approval is required.  The highest-level approver will reply to the RE confirming that the pdf is signed and the change order is approved in AWP. For PODI projects that are designated for change order review by FHWA, the highest-level approver will forward the email on to the appropriate FHWA Transportation Engineer and copy the RE. The FHWA Transportation Engineer will reply to all when approved.
+
Estimate the pile length required to achieve the minimum nominal axial compressive resistance, R<sub>ndr</sub>, for establishment of contract pile quantities. Perform a static analysis to determine the nominal resistance profile of the soilFor each soil layer the appropriate resistance factor, ϕ<sub>stat</sub>, shall be applied to account for the reliability of the static analysis method chosen in order to create a factored resistance profile.  The penetration depth would then occur at the location where the factored resistance profile intercepts the factored load. Similarly, for a uniform soil layer the adjusted nominal resistance, R<sub>nstat</sub>, can be determined from the equation below.
 +
:{| style="margin: 1em auto 1em auto"
 +
|-
 +
|ϕ<sub>dyn</sub> x R<sub>ndr</sub> = ϕ<sub>stat</sub> x R<sub>nstat</sub> ≥ Factored Load||width="450"| ||LRFD C10.7.3.3-1
 +
|}
  
===109.12.3 Time Adjustment Change Orders===
+
Where:
All time adjustment change orders, whether for overall contract time, individual project time, or specified milestones (e.g. road/bridge closure), are considered major change orders and shall be reviewed and approved by the division office. Initial review by the Construction Liaison Engineer shall be made prior to any agreements with the contractor and prior to submitting the Time Adjustment change order to the contractor.  Time adjustments are granted for events deemed by the engineer as excusable delays that inhibit progress of a controlling item of work (i.e., critical path schedule). [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 108.14.1] lists some of the common events that warrant consideration. [[:Category:108 Prosecution and Progress#108.7 Contract Time for Completion of the Work|EPG 108.7 Contract Time for Completion of the Work]] provides guidance for determining the appropriate amount of a time extension. The [https://epg.modot.org/forms/CM/AWP_CO_3ChangeOrderTimeExtension.doc AWP CO 3 Change Order Time Extension] provides guidance on how to generate the time change in AWP. Justification for the extension should be documented and saved in eProjects as [[#Supporting Documentation.|Supporting Documentation]] unless the change order reason is self-explanatory.
+
:ϕ<sub>dyn</sub> = see [[#751.36.5.3 Geotechnical Resistance|EPG.751.36.5.3]]
 +
:R<sub>ndr</sub> = Minimum nominal axial compressive resistance = Required nominal driving resistance
 +
:ϕ<sub>stat</sub> = Static analysis resistance factor per LRFD Table 10.5.5.2.3-1 or as provided by the Geotechnical Engineer. Factors for side friction and end bearing may be different.
 +
:R<sub>nstat</sub> = Adjusted Nominal resistance due to static analysis reliability
  
All time extension change orders should include a description and reason and for granting of additional time, the amount of days, and any terms associated with the extension.  The description should identify the controlling item of work that was affected by the delay, as confirmed by examining the critical path schedule. If the extension includes multiple causes of delay, each cause should be listed separately, along with the amount of time granted for each, excluding any overlap. Time adjustments are sometimes granted for reasons unrelated to an excusable delay.  Time adjustments are sometimes granted as part of a negotiated settlement and may not directly correlate with the progress schedule.  Regardless of the reason for the extension, a revised Progress Schedule should be requested following execution of the change order.  An [[media:109.12.1 Time.pdf|example Time Adjustment Change Order]] is available.
+
Use soil profiles from borings and mimic soil characteristics as closely as possible in computations or software to calculate the geotechnical resistance and for estimating the length of pile.  
  
The following statement is recommended for inclusion in all time adjustment change orders to make clear that the additional time being granted includes all excusable delays up to the date of the change order:
+
It is not advisable to design pile deeper than available borings or to reach capacity within the bottom 3 to 5 feet of borings. If a longer pile depth is needed to meet design requirements then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as the required pile length.  
:''“This revised Completion Date (or, “This addition of Calendar Days”), as specified, is full and final adjustment for all time and costs, loss or damage including, without limitation, delays, accelerations, or inefficiencies, resulting from the above causes, and is made without prejudice to the Commission.”''
 
  
====109.12.3.1 Excusable Delays for Unusual Events====
+
For friction pile the top five feet of soil friction resistance may be neglected with SPM or SLE approval for possible disturbance from MSE wall excavation prior to driving pile.
Per [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 108.14.1], the engineer may grant an excusable delay for unusual or extreme events. To qualify, the events must be highly unusual and not just somewhat out of the ordinary. For example, a wet construction season due to above average rainfall does not necessarily constitute “unusually severe weather”. In addition, the event must be outside of the contractor’s control and must have adversely affected the project's identified critical path schedule. Completed work damaged or destroyed by motorist or other outside parties may qualify as an excusable delay only if the remediated work adversely affects the project's critical path. When significant defects or failures in the contractor’s workmanship are discovered during the project and the remediation is extensive and results in significant time delays to the project's critical path, the State Construction and Materials Engineer may, at the State Construction and Materials Engineer's discretion, grant the contractor additional time to perform the remediation as part of a settlement agreement. The contractor shall submit in writing to the State Construction and Materials Engineer a justification request for the additional time. The justification must include the duration and timeframes to complete the remediation. In addition, an action plan that outlines the specific remediation shall be included with the justification. Only the time to perform remediation repairs will be considered for the additional time requests. The decision to grant additional time for these events are the sole discretion of the State Construction and Materials Engineer.
 
  
====109.12.3.2 Description, Reason and Supporting Documentation====
+
'''End Bearing Piles:'''
The Description/Reason narrative of the time adjustment change order, as well as the Supporting Documentation, should address four primary areas:
 
  
:'''1. Describe the Contract Change -''' Begin by explicitly describing the change in contract terms. For example:  ''“The number of Calendar Days for J4P2168, as stated in Section 2.1 of JSP B. CONTRACT LIQUIDAGED DAMAGES, is hereby increased from 130 days to 134 days.”'' Or, if the contract completion date is being extended, state: ''“The Contract Completion Date stated in Section 2.0 of JSP B. CONTRACT LIQUIDAGED DAMAGES, is hereby extended from Nov. 1, 2021 to Nov. 5, 2021.”''  If extensive changes are being made to the JSP, rewrite the JSP as desired, then merge it with the change order and state the following: ''“Delete JSP B. CONTRACT LIQUIDAGED DAMAGES and substitute with the attached version.”''
+
The estimated pile length is the distance along the pile from the cut-off elevation to the estimated tip elevation considering any penetration into rock. The estimated tip elevation shall not be shown on plans for end bearing piles.  
  
:'''2. Justification -''' Now explain the justification for the extension.  For example:  ''“The major operation, storm sewer pipe installation, was halted from March 15 thru March 18, both dates inclusive, to allow for the relocation of an unexpected water main owned by the City of Lee’s Summit, right of Sta 156+22.  Per Sec 105.7.6.1, this delay is considered excusable but non-compensable.”''  If there are many details, provide those in the Supporting Documentation rather than the change order itself.
+
The geotechnical material above the estimated end bearing tip elevation shall be reviewed for the presence of glacial till or similar layers. If these layers are present, then a static analysis shall be performed to verify if the required pile resistance is reached at a higher elevation due to pile friction capacity.
  
:'''3. Full and Final Closure Statement -''' Insert our standard closure statement so that it is clear that this agreement is full and final. No additional cost adjustments will be made except for any terms that may have been included in the opening contract change statement. Insert the closure statement (cut/paste) exactly as it is written in [[#109.12.3 Time Adjustment Change Orders|EPG 109.12.3 Time Adjustment Change Orders]].  Just edit the part in parenthesis to match what type of time change you made (i.e., calendar days or date).
+
====751.36.5.9.2 Check Pile Geotechnical Capacity (Axial Loads Only)====
  
:'''4. Supporting Documentation -''' Now provide Supporting Documentation, if necessary. This is an internal document to help reviewers and auditors understand the details. In the simple example above, everything was addressed in the change order itself, so no supporting documents would be needed. But, for example, had a weighted time table calculation been necessary, it would be shown in the Supporting Documentation. Or, perhaps a brief analysis of the critical path schedule is necessary to explain how the number of days granted was derived.
+
Use the same methodology outlined in [[#751.36.5.9.1 Estimated Pile Length|EPG 751.36.5.9.1 Estimated Pile Length]].
  
==109.13 Prompt Payment to Subcontractors and Suppliers (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.13])==
+
====751.36.5.9.3 Check Pile Structural Capacity (Combined Axial and Bending)====
  
Prompt payment of subcontractors is defined by Sec 109.13. The prime contractor shall coordinate with subcontractors to assure all subcontractors are paid within 15 days.
+
Structural design checks which include lateral loading and bending shall be accomplished using the appropriate structural resistance factors.
  
The Resident Engineer should provide the following to facilitate the process: The RE will provide an approved payment estimate to the prime contractor within 3 business days of the end of each estimate period. This approved payment estimate will provide a summary of all quantities paid to the contractor in order to facilitate the payment to the subcontractors.
+
===751.36.5.10 Pile Nominal Axial Compressive Resistance ===
 
Issues related to this subject can be forwarded to [http://sp/sites/cm/Pages/default.aspx Construction and Materials].  A related subject, Prompt Payment of Contractors, is related to [https://revisor.mo.gov/main/OneSection.aspx?section=34.057 RSMo Missouri Revised Statute 34.057].
 
  
==109.14 Price Adjustment for Fuel (for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 109.14])==
+
The minimum nominal axial compressive resistance, R<sub>ndr</sub>, must be calculated and shown on the final plans. The factored axial compressive resistance will be used to verify the pile group layout and loading. The minimum nominal axial compressive resistance will be used in construction field verification methods to obtain the required nominal driving resistance.  
  
Prior to bid, the contractor must determine whether they will bid their project based on projected fuel prices, or if they will choose to utilize the fuel price adjustments provided in Sec 109.14. In their bid proposal, they will choose to accept or decline receiving a fuel adjustment for the bid items identified in Sec 109.14 when the contract is executed.  Bidders must choose to accept or decline the fuel adjustments for qualifying pay items in each of the four categories: excavation (production), asphalt paving (production & hauling), concrete paving (production & hauling), aggregate base (hauling).  Production factors account for fuel used in producing and placing a product (e.g. asphalt plant burner fuel, paver fuel, distributor fuel, etc.), whereas On-Road Hauling factors account for fuel used to haul the material to the project.  The On-Road Hauling factor is based on a 30-mile round trip.  This is an average factor that is always used regardless of the actual haul distance.
+
:Minimum Nominal Axial Compressive Resistance = Required Nominal Driving Resistance, R<sub>ndr</sub>  
 +
::::::::::::::: = Maximum factored axial loads/ϕ<sub>dyn</sub>
  
AWP automatically calculates the fuel price adjustment for all known qualifying standard pay items. Per Sec 109.14, non-standard pay items (generally designated with a "99" item number) do not qualify for fuel adjustment unless there is a Job Special Provision that overrides the spec and states the fuel adjustment shall apply to that item.  Each estimate should be checked to verify that the appropriate fuel adjustments are being made either manually or auto-generated.
+
:ϕ<sub>dyn</sub> = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation. LRFD 10.5.5.2.3.1
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="right"
 
|-
 
|<center>'''[https://epg.modot.org/forms/CM/Fuel_Adjustment_Calculation.xlsx Fuel Adjustment Calculation Spreadsheet]'''</center>
 
|}
 
A [https://epg.modot.org/forms/CM/Fuel_Adjustment_Calculation.xlsx Fuel Adjustment Calculation spreadsheet] is available for manual calculations. Prior to calculating the adjustment, a check must be done to verify that the unit pay item matches the unit shown in the table in Sec 109.14. If not, a quantity conversion must be done before calculating the adjustment. For example, asphalt paid by the square yard would need to be converted to tons before multiplying by the corresponding factors in the table. The manually calculated fuel adjustment should then be added to the estimate as a [[:Category:101 Standard Forms#AWP CO Item Adjustments|CO Item Adjustments]] for the designated lines. The spreadsheet calculations should be retained in eProjects as documentation.  
 
  
Payment for work should be made in the pay period (or at least a pay period in the same month) in which the work was performed in order for AWP to calculate the fuel adjustment accurately. If payment for work is submitted via AWP in a time period other than the month in which the work was performed, a manual fuel adjustment will be necessary. When this happens, the fuel price adjustment must be calculated for the correct estimate period and a contract adjustment must be made to correct for the difference in the index for the two estimate periods. Calculations should be retained with the contract documentation.  
+
The value of R<sub>ndr</sub> shown on the plans shall be the greater of the value required at the '''Strength limit state and Extreme Event limit state'''. This value shall not be greater than the structural nominal axial compressive resistance of the steel HP pile nor shall it exceed the maximum nominal driving resistance of the steel shell for CIP piles.  See [[#751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile |EPG 751.36.5.5]].&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;           LRFD 10.7.7
  
A table listing the Monthly Fuel Indexes is available in the right column under "Documents" on [https://www.modot.org/bid-opening-info MoDOT’s Contractor Resources website].
 
  
<div id="The following table provides"></div>
+
For friction piles predominantly embedded and tipped in cohesionless soils the minimum nominal axial compressive resistance should be limited to the values shown in the following table.  Please seek approval from the SPM or SLE before exceeding the limits provided.
  
The following table provides further guidance on when the fuel adjustment is applicable:
+
<center>'''Maximum Axial Loads for Friction Pile in Cohesionless Soils'''
<center>
+
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:left"
+
!rowspan="3"|Pile Type !!rowspan="3"|Minimum Nominal<br/>Axial Compressive<br/>Resistance (R<sub>ndr</sub>)<sup>'''1'''</sup><br/>(kips)<br/>!!colspan="3"|Maximum Factored Axial Load (kips)
|+
+
|-
! style="background:#BEBEBE" align="center"|Pay Item!! style="background:#BEBEBE" width=450px align="center"|Does Fuel Adjustment Apply?
+
!Dynamic Testing!!Wave Equation<br/>Analysis!!FHWA-modified<br/>Gates Dynamic<br/>Pile Formula
 +
|-
 +
!ϕ<sub>dyn</sub>= 0.65 !!ϕ<sub>dyn</sub> = 0.50 !!ϕ<sub>dyn</sub> = 0.40
 
|-
 
|-
|Asphalt pavement, shoulders, and entrances (full depth and overlays)||width=400px|Yes, all asphalt in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=7 Sections 401], [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=7 402], [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=7 403] and ultrathin bonded asphalt wearing surface.
+
|CIP 14” ||210 ||136 ||105 ||84
 
|-
 
|-
|Job Order contracts ||width=400px|Fixed-cost pay items in Job Order Contracts do not qualify because they are considered “repair” work and not “construction” work. This exclusion is stated in Sec 109.14.
+
|CIP 16” ||240 ||156 ||120 ||96
 
|-
 
|-
|Concrete pavement (including pavement overlays), concrete base, shoulders, and entrances (i.e. 7” or 8” Paved Approach)||width=400px|Yes. For overlays that have separate pay items for placing (SY) and furnishing (CY), only the square yards of placing should receive a fuel adjustment. For overlays that are paid entirely in CY, the unit of measure should be converted to SY and the adjustment should be paid based on SY at the theoretical thickness.
+
|CIP 20” ||300 ||195 ||150 ||120
 
|-
 
|-
|Concrete Bridge Approach Slab and Concrete Approach Pavement||width=400px| No
+
|CIP 24” ||340 ||221 ||170 ||136
 
|-
 
|-
|Roller compacted concrete||width=400px| Yes
+
|colspan="5" align="left"|<sup>'''1'''</sup> The minimum nominal axial compressive resistance values are correlated to match the maximum design tonnage values used in past ASD practice.  A factor of safety of 3.5 is used to determine the equivalent R<sub>ndr</sub>.
 +
|}
 +
</center>
 +
 
 +
===751.36.5.11 Check Pile Drivability===
 +
 
 +
Drivability of the pile through the soil profile shall be investigated using Wave equation analysis program or other available software. Designers may import soil resistances from a static analysis program or input soil values directly into Wave equation analysis program to perform drivability.
 +
 +
If soil values are to be directly input into Wave equation analysis program, enter in values of sand and clay layers with specific values of cohesion or internal friction angle or just by uncorrected blow count values obtained from borings.
 +
 
 +
Drivability analysis shall be performed by the designer for all pile types (bearing pile and friction pile) using the Delmag D19-42 hammer with manufacturer recommendations. The drivability analysis shall confirm that the pile can be driven to the minimum tip elevation, rock elevation or reach the minimum nominal axial compressive resistance prior to refusal and without overstressing the pile. If the drivability analysis shows overstress or refusal prior to reaching the desired depth a lighter or heavier hammer from the table below may be used to confirm constructability. The drivability analysis is not intended to confirm that a pile can be driven through rock (shales, sandstones, etc…) where the likelihood of pile damage is increased and PDA is recommended to reduce loads and monitor pile stresses in the field. The drivability analyses performed by the designer do not waive the responsibility of the contractor in selecting the appropriate pile driving system per Sec 702.3.5 (also discussed below).
 +
 
 +
Use soil profiles from borings and mimic soil characteristics as closely as possible for computations or in software to perform drivability analysis of any kind of pile.
 +
 
 +
'''Structural steel HP Pile:'''
 +
 
 +
Drivability analysis shall be performed for two cases:
 +
:1. Box shape
 +
:2. Perimeter
 +
 
 +
Drivability shall be performed considering existing condition without considering any excavation/ disturbance (i.e., possible disturbance to top 5 feet of soil from MSE wall excavation prior to driving pile), liquefaction or future scour loss.
 +
 
 +
'''Hammer types:'''
 +
<center>'''Pile Driving Hammer Information For GRLWEAP'''
 +
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 +
!colspan="3"|Hammer used in the field per survey response (2017)
 
|-
 
|-
|Concrete sidewalk, median strip (concrete or asphalt), or curb & gutter|| width=400px|No
+
!GRLWEAP ID!!Hammer name!!No. of Responses
 
|-
 
|-
|Full or partial depth pavement repair, asphalt and concrete||width=400px|No, this concrete or asphalt material is for “repair”, not “construction”.  Nor would the base rock for pavement repair.
+
|41||Delmag D19-42<sup>1</sup>|| 13
 
|-
 
|-
|Concrete or asphalt bridge deck overlays|| width=400px|Deck overlays do not qualify except when the roadway asphalt overlay extends across the bridge deck.
+
|40||Delmag D19-32 || 6
 
|-
 
|-
|Seal coat, micro-surfacing, etc.|| No
+
|38||Delmag D12-42  || 4
 
|-
 
|-
|Stabilized Permeable Base || Yes
+
|139||ICE 32S ||4
 
|-
 
|-
|Type A2 and A3 shoulders (concrete and asphalt) ||width=400px|Yes, both the surface material and the base rock qualify, but not the portion of base rock identified as incidental.
+
|15||Delmag D30-32|| 2
 
|-
 
|-
|Aggregate surfacing||width=400px| No, aggregate under [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=6 Section 310] does not qualify.
+
| ||Delmag D25-32 ||2
 
|-
 
|-
|Other base rock such as 12" or 18" Rock Base (Section 303)||width=400px|No. Only Type 1, 5, 7, and Stabilized Permeable Base qualify.
+
|127||ICE 30S|| 1
 
|-
 
|-
|Base produced from rock on the project or from an adjacent source||width=400px| No, the material must be hauled to the project.
+
|150||MKT DE-30B|| 1
 
|-
 
|-
|Non-standard bid items. These are items not specifically listed in the Listing of Bid Items For Highway Construction at the time of letting (i.e. item numbers with a “99” designation).||width=400px|No, not unless there is a JSP that specifically overrides Sec 109.14 and allows a fuel adjustment.
+
|colspan="3"|<sup>'''1</sup>''' Delmag series of pile hammers is the most popular, with the D19-42 being the most widely used.  
 
|}
 
|}
 
</center>
 
</center>
 +
'''Hammer usage in the field will be surveyed every five years. The above results will be revised according to the new survey and the most widely used hammer will be selected for drivability analysis.'''
 +
 +
The contractor is responsible for determining the hammer energy required to successfully drive the pile to the minimum tip elevation and to reach the minimum nominal axial compressive resistance specified on the plans. The contractor shall perform a drivability analysis to select an appropriate hammer size to ensure the pile can be driven without overstressing the pile and to prevent refusal of the pile prior to reaching the minimum tip elevation.  The contractor shall plan pile driving activities and submit hammer energy requirements to the engineer for approval before driving. 
 +
 +
Practical refusal is defined at 20 blows/inch or 240 blows per foot. 
 +
 +
Driving should be terminated immediately once 30 blows/inch is encountered.
 +
 +
:{| style="margin: 1em auto 1em auto"
 +
|-
 +
|'''Nominal Driving Stress'''||width="840"| ||'''LRFD 10.7.8'''
 +
|}
 +
:Nominal driving stress ≤ 0.9*ϕ<sub>da</sub>*F<sub>y</sub>
 +
::For structural steel HP pile, Maximum nominal driving stress = 45 ksi
 +
::For CIP pile, Maximum nominal driving resistance, see [[#751.36.5.7.2.1 Design Values for Individual HP Pile|EPG 751.36.5.7.1.2]] or [[#751.36.5.7.2.2 Design Values for Individual Cast-In-Place (CIP) Pile|EPG 751.36.5.7.2.2]] (unfilled pipe for axial analysis).
 +
 +
If analysis indicates the piles do not have sufficient structural or geotechnical strength or drivability issues exist, then consider increasing the number of piles.
  
==109.15 Price Adjustment for Asphalt Cement==
+
===751.36.5.12 Information to be Included on the Plans===
 
   
 
   
See [[:Category:403 Asphaltic Concrete Pavement|EPG 403 Asphaltic Concrete Pavement]] for guidance on AC price index adjustments.
+
See [https://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#A1._Design_Specifications.2C_Loadings_.26_Unit_Stresses EPG 751.50 A1 Design Specifications, Loadings & Unit Stresses] for appropriate design stresses to be included in the general notes.
 +
 
 +
See [https://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#E2._Foundation_Data_Table EPG 751.50 E2 Foundation Data Table] for appropriate data to be included in the foundation data table for HP pile and CIP pile and any additional notes required below the table. See [https://www.modot.org/pile-pile  Bridge Standard Drawings “Pile”] for CIP data table.
 +
 
 +
 
 +
 
 +
 
 +
 
 +
[[Category:751 LRFD Bridge Design Guidelines]]

Revision as of 12:37, 21 November 2024

Main Page July 17, 2013.jpg

Contents

751.36.1 General

Accuracy Required

All capacities shall be taken to the nearest 1 (one) kip, loads shown on plans.

751.36.1.1 Maximum Specified Pile Lengths

Structural Steel Pile No Limit
Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile No Limit

It is not advisable to design pile deeper than borings. If longer pile depth is required to meet design requirements, then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as required pile length.

751.36.1.2 Probe Pile

Asset Management
Report 2009
See also: Research Publications

Length shall be estimated pile length + 10’.

When probe piles are specified to be driven-in-place, they shall not be included in the number of piles indicated in the “FOUNDATION DATA” Table.

751.36.1.3 Static Load Test Pile

When Static Load Test Pile is specified, the nominal axial compressive resistance value shall be determined by an actual static load test.

For preboring for piles, see Sec 702.

751.36.1.4 Preliminary Geotechnical Report Information

The foundation can be more economically designed with increased geotechnical information about the specific project site.

Soil information should be reviewed for rock or refusal elevations. Auger hole information and rock or refusal data are sufficient for piles founded on rock material to indicate length of piling estimated. Standard Penetration Test information is especially desirable at each bent if friction piles are utilized or the depth of rock exceeds approximately 60 feet.

751.36.1.5 Geotechnical Redundancy

Pile Nonredundancy (20 percent resistance factor reduction)

Conventional bridge pile foundations:

For pile cap footings where a small pile group is defined as less than 5 piles, reduce pile geotechnical and structural resistance factors shown in LRFD Table 10.5.5.2.3-1.

For pile cap bents, the small pile group definition of less than 5 piles is debatable in terms of nonredundancy and applying a resistance factor reduction. The notion of a bridge collapse or a pile cap bent failure directly related to the failure of a single pile or due to its pile arrangement in this instance, or ignoring the strength contribution of the superstructure via diaphragms in some cases would seem to challenge applying the small pile group concept to pile bent systems as developed in NCHRP 508 and alluded to in the LRFD commentary. In terms of reliability, application of this factor could be utilized to account for exposed piling subject to indeterminable scour, erosion, debris loading or vehicular impact loadings as an increased factor of safety.

For integral and non-integral end bent cap piles, the reduction factor need not be considered for less than 5 piles due to the studied infrequency of abutment structural failures (NCHRP 458, p. 6) and statewide satisfactory historical performance.

For intermediate bent cap piles, the reduction factor need not be considered for less than 5 piles under normal design conditions. It may be considered for unaccountable loading conditions that may be outside the scope of accountable strength or extreme event limit state loading and is specific to a bridge site and application and is therefore utilized at the discretion of the Structural Project Manager or Structural Liaison Engineer. Further, if applied, it shall be utilized for determining pile length if applicable, lateral and horizontal geotechnical and structural resistances. Alternatively, a minimum of 5 piles may save consideration and cost.

Any substructure with a pile foundation can be checked for structural redundancy if necessary by performing structural analyses considering the hypothetical transference of loads to presumed surviving members of a substructure like columns or piles (load shedding). This direct analysis procedure could be performed in place of using a reduction factor for other than pile cap footings.

For major bridges, the application of pile redundancy may take a stricter direction. See the Structural Project Manager or Structural Liaison Engineer.

751.36.1.6 Waterjetting

Waterjetting is a method available to contractors to aid in driving piles. If the drivability analysis indicates difficulty driving piles then it can be assumed that the contractor may use waterjetting to aid in driving the piles. The Commentary on Waterjetting discusses items to consider when there is a possibility of the use of waterjetting.

751.36.1.7 Restrike

In general, designers should NOT require restrikes unless the Geotechnical Section requires restrike because it delays construction and makes it harder for contractors to estimate pile driving time on site. The Geotechnical Section shall show on borings data a statement indicating either "No Restrike Recommended" or "Restrike Recommended", with requirements.

751.36.2 Steel Pile

751.36.2.1 Material Properties

751.36.2.1.1 Structural Steel HP Pile

Structural Steel HP piling shall be ASTM A709 Grade 50 (fy = 50 ksi) steel.

Note: ASTM A709 Grade 50S shall not be specified for HP piles without prior confirmation of the availability of the material.

751.36.2.1.2 Cast-In-Place (CIP) Pile

Welded or Seamless steel shell (Pipe) for CIP piling shall be ASTM A252 Modified Grade 3

(fy = 50 ksi, Es = 29,000 ksi)

Concrete

Class B - 1 Concrete (Substructure) f'c= 4.0 ksi

Modulus of elasticity,

Where:

f'c in ksi
wc = unit weight of nonreinforced concrete = 0.145 kcf
K1 = correction factor for source of aggregate
= 1.0 unless determined by physical testing

Reinforcing Steel

Minimum yield strength, fy = 60.0 ksi
Steel modulus of elasticity, Es = 29000 ksi

751.36.2.2 Steel Pile Type

Avoid multiple sizes and/or types of pilings on typical bridges (5 spans or less). Also using same size and type of pile on project helps with galvanizing.

There are two types of piles generally used by MoDOT. They are structural steel HP pile and close-ended pipe pile (cast-in-place, CIP). Open ended pipe pile (cast-in-place, CIP) can also be used. Structural steel piling are generally referred to as HP piling and two different standard AISC shapes are typically utilized: HP12 x 53 and HP14 x 73. Pipe piling are generally referred to as cast-in-place or CIP piling because concrete is poured and cast in steel shells which are driven first or pre-driven.

751.36.2.2.1 Structural Steel HP Pile

HP Size
Section Area
HP 12 x 53 15.5 sq. in.
HP 14 x 73 21.4 sq. in.

The HP 12 x 53 section shall be used unless a heavier section produces a more economical design or required by a Drivability Analysis.

751.36.2.2.2 Cast-In-Place (CIP) Pile

Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile Size
Outside Diameter Minimum Nominal Wall
Thickness (By Design)
Common Available Nominal Wall
Thicknesses
14 inch 1/2” 1/2” and 5/8”2
16 inch 1/2” 1/2” and 5/8”2
20 inch1 1/2” 1/2” and 5/8”
24 inch1 1/2” 1/2”, 5/8” and 3/4”
1 Use when required to meet KL/r ratio or when smaller diameter CIP do not meet design.
2 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.

Use minimum nominal wall thickness which is preferred. When this wall thickness is inadequate for structural strength or for driving (drivability), then a thicker wall shall be used. Specify the required wall thickness on the plan details. The contractor shall determine the pile wall thickness required to avoid damage during driving or after adjacent piles have been driven, but not less than the minimum specified.

Minimum tip elevation must be shown on plans. Criteria for minimum tip elevation shall also be shown. The following information shall be included on the plans:

“Minimum Tip Elevation is required _______________.” Reason must be completed by designer such as:
  • for lateral stability
  • for required tension or uplift pile capacity
  • to penetrate anticipated soft geotechnical layers
  • for scour*
  • to minimize post-construction settlements
  • for minimum embedment into natural ground
*For scour, estimated maximum scour depth (elevation) must be shown on plans.
Guidance Note: Show maximum of total scour depths estimated for multiple return periods in years from Preliminary design which should be given on the Design Layout. Show the controlling return period (e.g. 100, 200, 500). If return periods are different for different bents, add a new line in foundation data table.

751.36.3 Pile Point Reinforcement

Pile point reinforcement is also known as a pile tip (e.g., pile shoe or pile toe attachments).

751.36.3.1 Structural Steel HP Pile

Pile point reinforcement shall be required for all HP piles required to be driven to bear on rock regardless of pile strength used for design loadings or geomaterial (soils with or without gravel or cobbles) to be penetrated. Pile point reinforcement shall be manufactured in one piece of cast steel. Manufactured pile point reinforcements are available in various shapes and styles as shown in FHWA-NHI-16-010, Figure 16-5.

751.36.3.2 Cast-In-Place (CIP) Pile

For CIP piles, use pile point reinforcement if boulders or cobbles or dense gravel are anticipated.

Geotechnical Section shall recommend when pile point reinforcement is needed and type of pile point reinforcement on the Foundation Investigation Geotechnical Report.

For Closed Ended Cast-In-Place Concrete Pile (CECIP)

Two types are available.

1. “Cruciform” type should be used as recommended and for hard driving into soft rock, weathered rock, and shales. It will continue to develop end bearing resistance while driving since an exposed flat closure plate is included with this point type. The closure plate acts to distribute load to the pile cross sectional area.
2. “Conical” type should be used as recommended and when there is harder than typical driving conditions, for example hard driving through difficult soils like heavily cobblestoned, very gravelly, densely layered soils. Severely obstructed driving can cause CIP piles with conical points to deflect. Conical pile points are always the more expensive option.

For Open Ended Cast-In-Place Concrete Pile (OECIP)

One type is available.

“Open Ended Cutting Shoe” type should be used as recommended and when protection of the pipe end during driving could be a concern. It is also useful if uneven bearing is anticipated since a reinforced tip can redistribute load and lessen point loading concerns.
Open ended piles are not recommended for bearing on hard rock since this situation could create inefficient point loading that could be structurally damaging.

When Geotechnical Section indicates that pile point reinforcement is needed on the boring log, then the recommended pile point reinforcement type shall be shown on the plan details. Generally this information is also shown on the Design layout.

For pile point reinforcement detail, see

Bridge Standard Drawings
Pile

751.36.4 Anchorage of Piles for Seismic Details

751.36.4.1 Structural Steel HP Pile - Details

[MS Cell]

Use standard seismic anchorage detail for all HP pile sizes. Modify detail (bolt size, no. of bolts, angle size) if seismic and geotechnical analyses require increased uplift resistance. Follow AASHTO 17th Ed. LFD or AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS).

751.36.4.1 2022.jpg

751.36.4.2 Cast-In-Place (CIP) Pile - Details

Bridge Standard Drawings
Pile

751.36.5 Design Procedure

  • Structural Analysis
  • Geotechnical Analysis
  • Drivability Analysis

751.36.5.1 Design Procedure Outline

  • Determine foundation load effects from the superstructure and substructure for Service, Strength and Extreme Event Limit States.
  • If applicable, determine scour depths, liquefaction information and pile design unbraced length information.
  • Determine if downdrag loadings should be considered.
  • Select preliminary pile size and pile layout.
  • Perform a Static Pile Soil Interaction Analysis. Estimate Pile Length and pile capacity.
  • Based on pile type and material, determine Resistance Factors for Structural Strength ( and ).
  • Determine:
    • Maximum axial load effects at toe of a single pile
    • Maximum combined axial & flexural load effects of a single pile
    • Maximum shear load effect for a single pile
    • Uplift pile reactions
  • Determine Nominal and Factored Structural Resistance for single pile
    • Determine Structural Axial Compression Resistance
    • Determine Structural Flexural Resistance
    • Determine Structural Combined Axial & Flexural Resistance
    • Determine Structural Shear Resistance
  • Determine method for pile driving acceptance criteria
  • Determine Resistance Factor for Geotechnical Resistance () and Driving Resistance ().
  • If other than end bearing pile on rock or shale, determine Nominal Axial Geotechnical Resistance for pile.
  • Determine Factored Axial Geotechnical Resistance for single pile.
  • Determine Nominal pullout resistance if pile uplift reactions exist.
  • Check for pile group effects.
  • Resistance of Pile Groups in Compression
  • Check Drivability of all pile (bearing and friction pile) using the Wave equation analysis.
  • Review Static Pile Soil Interaction Analysis and pile lengths for friction pile.
  • Show proper Pile Data on Plan Sheets (Foundation Data Table).

751.36.5.2 Structural Resistance Factor (ϕc and ϕf) for Strength Limit State

LRFD 6.5.4.2

For integral end bent simple pile design, use Φc = 0.35 for CIP steel pipe piles and HP piles. See Figure 751.35.2.4.2.

For pile at all locations where integral end bent simple pile design is not applicable, use the following:

The structural resistance factor for axial resistance in compression is dependent upon the expected driving conditions. When the pile is subject to damage due to severe driving conditions where use of pile point reinforcement is necessary:
Steel Shells (Pipe): = 0.60
HP Piles: = 0.50
When the pile is subject to good driving conditions where use of pile point reinforcement is not necessary:
Steel Shells (Pipe) Piles: = 0.70
HP Piles: = 0.60
For HP piles, pile point reinforcement is always required when HP piles are anticipated to be driven to rock and proofed. Driving HP piles to rock is considered severe driving conditions for determination of structural resistance factor. However, driving HP piles through overburden not likely to impede driving to deep rock or preboring to rock for setting piles are two situations that could be considered as less than severe. Further, driving any steel pile through soil without rubble, boulders, cobbles or very dense gravel could be considered good driving conditions for determination of structural resistance factor. Consult the Structural Project Manager or Structural Liaison Engineer.
The structural resistance factor for combined axial and flexural resistance of undamaged piles:
Axial resistance factor for HP Piles: = 0.70
Axial resistance for Steel Shells (Pipe): = 0.80
Flexural resistance factor for HP Piles or Steel Shells: = 1.00
For Extreme Event Limit States, see LRFD 10.5.5.3.

751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn)

LRFD Table 10.5.5.2.3-1

The factors for Geotechnical Resistance () and Driving Resistance () will usually be different because of the different methods used to determine the nominal bearing resistance. Caution should be used if the difference in factors for Geotechnical Resistance and Driving Resistance are great as it can lead to issues with pile overruns. Also see EPG 751.36.5.9.

Geotechnical Resistance Factor, :

The Geotechnical Resistance factor is based on the static method used by the designer in determining the nominal bearing resistance. Unlike the Driving Resistance factor the Geotechnical Resistance factor can vary with the soil layers. If Geotechnical Resistance factors are not provided by the Geotechnical Engineer, values may be selected from LRFD Table 10.5.5.2.3-1. For Extreme Event Limit States see LRFD 10.5.5.3.

Driving Resistance Factor, :

The Driving Resistance factor shall be selected from LRFD Table 10.5.5.2.3-1 based on the method to be used in the field during construction to verify nominal axial compressive resistance.

Verification Method Resistance Factor,
FHWA-modified Gates Dynamic Pile Formula
(End of Drive condition only)
0.40
Wave Equation Analysis (WEAP) 0.50
Dynamic Testing (PDA) on 1 to 10% piles 0.65
Other methods Refer to LRFD Table 10.5.5.2.3-1

Use EPG 751.50 Standard Detailing Note G7.3 on plans as required for end bearing piles driven to rock. This requirement shall apply to any type of rock meaning weak to strong rock including stronger shales where HP piling is anticipated to meet refusal. The verification method shown on the plans is only used to verify the nominal axial compressive resistance prior to reaching practical refusal. If the practical refusal criterion is met the field verification method shown on the plans is no longer considered valid.

For end bearing piles tipped in shale, sandstone, or rock of uncertain strength at any loading where the likelihood of pile damage is increased, the Foundation Investigation Geotechnical Report (FIGR) should give a recommendation for dynamic pile testing (PDA) or no PDA. For most end bearing piles, where a recommendation for field verification is not given in the FIGR, the designer will need to determine whether gates or WEAP is required for the pile driving verification method based on the loading demands on the pile or other factors.

For piles bearing on hard rock with MNACR less than 600 kips, FHWA-modified Gates Dynamic Pile Formula should be listed as verification method, and practical refusal criterion should control end of driving criteria. FHWA-modified Gates Dynamic Pile Formula is not considered accurate for pile loading (Minimum Nominal Axial Compressive Resistance) exceeding 600 kips. When pile loading exceeds 600 kips, use wave equation analysis, dynamic testing, or other method. Consideration should be given to using additional piles to reduce the MNACR below 600 kips.

Under special circumstances when rock limits or conditions are nonuniform, WEAP should be considered in order to limit pile damage since it requires further scrutiny of the site conditions with the proposed pile driving system.

Dynamic Testing is recommended for projects with friction piles.

751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction

Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8.

Downdrag, liquefaction and scour all reduce the available skin friction capacity of piles. Downdrag is unique because it not only causes a loss of capacity, but also applies a downward force to the piles. This is usually attributed to embankment settlement. However, downdrag can also be caused by a non-liquefied layer overlying a liquefied layer. Review geotechnical report for downdrag and liquefaction information.

751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile

The PNDC equations provided herein assume the piles are continually braced. This assumption is applicable for the portion of piling below ground or confined by solid wall encasement. If designing a pile bent structure, scour exists or liquefaction exists, then the pile shall be checked considering the appropriate unbraced length.

Structural Steel HP Piles

Since we are assuming the piles are continuously braced, then = 0.
is the yield strength of the pile
is the area of the steel pile

Welded or Seamless Steel Shell (Pipe) Cast-In-Place Piles (CIP Piles)

is the yield strength of the pipe pile
is the area of the steel pipe (deducting 12.5 % ASTM tolerance and 1/16 inch corrosion where appropriate.)
is the concrete compressive strength at 28 days
is the area of the concrete inside the pipe pile
Maximum Load during pile driving =

Welded or Seamless Steel Shell shall be ASTM A252 Modified Grade 3 (50 ksi). ASTM A252 states “the wall thickness at any point shall not be more than 12.5% under the specified nominal wall thickness.” AASHTO recommends deducting 1/16” of the wall thickness due to corrosion (LRFD 5.13.4.5.2). Corrosion need not be considered at construction stage and for drivability analysis and static analysis. For drivability analysis and static analysis deduct 12.5% of specified nominal wall thickness (ASTM A252). For structural design deduct 12.5 % (ASTM A252) and 1/16” for corrosion (LRFD 5.13.4.5.2) from specified nominal wall thickness.

751.36.5.6 Preliminary Factored Axial Design Capacity (PFDC) of an Individual Pile

PFDC = Structural Factored Axial Compressive Resistance – Factored Downdrag Load

751.36.5.7 Design Values for Steel Pile

751.36.5.7.1 Integral End Bent Simple Pile Design

The following design values may be used for integral end bents where the simple pile design method is applicable per EPG 751.35.2.4.2 Pile Design. These values are not applicable for soils subject to liquefaction or scour where unbraced lengths may alter the design.

751.36.5.7.1.1 Design Values for Individual HP Pile

Fy = 50 ksi. End Bearing Piles (HP piles) anticipated to be driven to rock.

Pile Size As
Area,
sq. in.
Structural
Nominal
Axial
Compressive
Resistance
PNDC1,2,
kips
Φc
Structural
Resistance
Factor4,5,
LRFD 6.5.4.2
Structural
Factored
Axial
Compressive
Resistance2,3,4,
kips
0.9*ϕda*Fy
Maximum
Nominal
Driving
Stress,
LRFD 10.7.8,
ksi
HP 12x53 15.5 775 0.35 271 45.00
HP 14x73 21.4 1070 0.35 375 45.00
1 Structural Nominal Axial Compressive Resistance for fully embedded piles only.

     Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, Rndr
                  = (Maximum factored axial loads / ϕdyn) ≤ Structural nominal axial compressive resistance, PNDC          LRFD 10.5.5.2.3

2 Axial Compressive Resistance values shown above shall be reduced when downdrag is considered.

3 Maximum factored axial load per pile ≤ Structural factored axial compressive resistance.

4 Values are applicable for Strength Limit States.

5 Use (Φc) = 0.35 instead of 0.5 for structural resistance factor (LRFD 6.5.4.2)


Notes:

ϕdyn = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation.      LRFD Table 10.5.5.2.3-1

For more information about selecting pile driving verification methods refer to EPG 751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn).

Drivability analysis shall be performed for all HP piles using Delmag D19-42. Do not show minimum hammer energy on plans.

Check drivability for all HP Pile in accordance with EPG 751.36.5.11

For additional design requirements, see EPG 751.36.5.1.

751.36.5.7.1.2 Design Values for Individual Cast-In-Place (CIP) Pile

Grade 3 Fy = 45 ksi; F'c = 4 ksi; Structural Axial Compressive Resistance Factor, (Φc)1,3 = 0.35

Unfilled Pipe For Axial Analysis2
Pile Outside Diameter O.D., in. Pile Inside Diameter I.D., in. Minimum Wall Thickness, in. Reduced Wall thick. for Fabrication (ASTM 252), in. As,4
Area
of
Steel
Pipe,
sq. in.
Structural
Nominal
Axial
Compressive
Resistance
Pn5,6,7,
kips
Structural
Factored Axial
Compressive
Resistance1,7,8,
kips
0.9*ϕda*Fy*As
Maximum
Nominal
Driving
Resistance6,
LRFD 10.7.8,
kips
14 13 0.5 0.44 18.47 831 291 748
12.75 0.6259 0.55 22.84 1028 360 925
16 15 0.5 0.44 21.22 955 334 859
14.75 0.6259 0.55 26.28 1183 414 1064
1Values are applicable for Strength Limit States.
2 Use to determine preliminary number of pile and pile size. For piles predominantly embedded and tipped in cohesionless soils the maximum loads provided in EPG 751.36.5.10 will control.
3 Use (Φc) = 0.35 instead of 0.6 for structural axial compressive resistance factor (LRFD 6.5.4.2). Since ϕdyn >> Φc the maximum nominal driving resistance may not control.
4 Corrosion NOT considered at construction stage and for drivability analysis and static analysis. For drivability analysis and static analysis use reduced pipe nominal wall thickness, 12.5%, for fabrication (ASTM A252).
5 Structural Nominal Axial compressive resistance for fully embedded piles only.
6 Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, Rndr
                  = Maximum factored axial loads / ϕdyn ≤ Structural nominal axial compressive resistance, Pn and           LRFD 10.5.5.2.3
                   ≤ Maximum nominal driving resistance.
7 Axial Compressive Resistance values shown above shall be reduced when downdrag is considered.
8 Maximum factored axial load per pile ≤ Structural factored axial compressive resistance
9 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.
Notes:
Drivability analysis shall be performed for all CIP piles (unfilled pipe) using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans.
Check drivability for all CIP Pile in accordance with EPG 751.36.5.11.
Require dynamic pile testing for field verification for all CIP piles on the plans.
ϕdyn = 0.65 = Dynamic Testing resistance factor to be used to estimate nominal pile resistance during pile installation. This value may be increased if static load testing is specified per LRFD Table 10.5.5.2.3-1.
For additional design requirements, see EPG 751.36.5.1.

751.36.5.7.2 General Pile Design

The following design values are recommended for general use where the simple pile design method is not applicable per EPG 751.35.2.4.2 Pile Design. These values are not applicable for soils subject to liquefaction or scour where unbraced lengths may alter the design.

751.36.5.7.2.1 Design Values for Individual HP Pile

Fy = 50 ksi. End Bearing Piles (HP piles) anticipated to be driven to rock.

Pile Size As
Area,
sq. in.
Structural
Nominal
Axial
Compressive
Resistance
PNDC1,2,
kips
Φc
Structural
Resistance
Factor4,
LRFD 6.5.4.2
Structural
Factored
Axial
Compressive
Resistance2,3,4,
kips
0.9*ϕda*Fy
Maximum
Nominal
Driving
Stress,
LRFD 10.7.8,
ksi
HP 12x53 15.5 775 0.5 388 45.00
HP 14x73 21.4 1070 0.5 535 45.00
1 Structural Nominal Axial Compressive Resistance for fully embedded piles only. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e., intermediate pile cap bent).

     Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, Rndr
                  = (Maximum factored axial loads / ϕdyn) ≤ Structural nominal axial compressive resistance, PNDC          LRFD 10.5.5.2.3

2 Axial Compressive Resistance values shown above shall be reduced when downdrag is considered.

3 Maximum factored axial load per pile ≤ Structural factored axial compressive resistance.

4 Values are applicable for Strength Limit States. Modify value for other Limit States.


Notes:

ϕdyn = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation.      LRFD Table 10.5.5.2.3-1

For more information about selecting pile driving verification methods refer to EPG 751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn).

Drivability analysis shall be performed for all HP piles using Delmag D19-42. Do not show minimum hammer energy on plans.

Check drivability for all HP Pile in accordance with EPG 751.36.5.11

For additional design requirements, see EPG 751.36.5.1.

751.36.5.7.2.2 Design Values for Individual Cast-In-Place (CIP) Pile

Grade 3 Fy = 45 ksi; F'c = 4 ksi; Structural Resistance Factor, (Φc)1 = 0.6

Unfilled Pipe For Axial Analysis2 Concrete Filled Pipe For Flexural Analysis3
Pile Outside Diameter O.D., in. Pile Inside Diameter I.D., in. Minimum Wall Thickness,
in.
Reduced Wall thick. for Fabrication (ASTM 252),
in.
As,4
Area of Steel Pipe,
sq. in.
Structural Nominal Axial Compressive Resistance, Pn5,6,7,
kips
Structural Factored Axial Compressive Resistance1,7,8,
kips
0.9*ϕda*Fy*As
Maximum
Nominal
Driving
Resistance5,6,
LRFD 10.7.8,
kips
Reduced Wall Thick. for Corrosion (1/16"), LRFD 5.13.4.5.2,
in.
Ast,9 Net Area of Steel Pipe,
sq. in.
Ac Concrete Area,
sq. in.
Structural Nominal Axial Compressive Resistance PNDC5,7,10,
kips
Structural Factored Axial Compressive Resistance1,7,10,
kips
14 13 0.5 0.44 18.47 831 499 748 0.375 15.76 133 1160 696
12.75 0.62511 0.55 22.84 1028 617 925 0.484 20.14 128 1340 804
16 15 0.5 0.44 21.22 955 573 859 0.375 18.11 177 1416 850
14.75 0.62511 0.55 26.28 1183 710 1064 0.484 23.18 171 1624 975
20 19 0.5 0.44 26.72 1202 721 1082 0.375 22.83 284 1991 1195
18.75 0.625 0.55 33.15 1492 895 1343 0.484 29.27 276 2256 1354
24 23 0.5 0.44 32.21 1450 870 1305 0.375 27.54 415 2652 1591
22.75 0.625 0.55 40.03 1801 1081 1621 0.484 35.36 406 2973 1784
22.5 0.75 0.66 47.74 2148 1289 1933 0.594 43.08 398 3290 1974
1 Values are applicable for Strength Limit States. Modify value for other Limit States.


2 Use to determine preliminary number of pile and pile size. For piles predominantly embedded and tipped in cohesionless soils the maximum loads provided in EPG 751.36.5.10 will control.

3 Pipes placed in prebored holes in rock can use filled pipe capacity for axial plus flexural resistance. Therefore, number of piles should be based on this capacity assuming rock is infinitely more stiff. This recognizes that pile driving is not a concern.

4 Corrosion NOT considered at construction stage and for drivability analysis and static analysis. For drivability analysis and static analysis use reduced pipe nominal wall thickness, 12.5%, for fabrication (ASTM A252).

5 Structural Nominal Axial compressive resistance for fully embedded piles only. Value in table is a raw number and is the value used to determine the factored resistance. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e. Intermediate pile cap bent).

6 Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, Rndr
      = Maximum factored axial loads / ϕdyn ≤ Structural nominal axial compressive resistance, Pn and                         LRFD 10.5.5.2.3
                                                                   ≤ Maximum nominal driving resistance.

7 Axial Compressive Resistance values shown above shall be reduced when downdrag is considered

8 Maximum factored axial load per pile ≤ Structural factored axial compressive resistance

9 Net area of steel pipe, Ast, assumes a 12.5% fabrication reduction (ASTM A252) and 1/16" (LRFD 5.13.4.5.2) reduction in pipe nominal wall thickness for corrosion.

10 Use for lateral load analysis. Resistance value includes filled pipe based on net area of steel pipe, Ast (12.5% fab. reduction and 1/16” corr. reduction in nominal pipe wall thickness).

11 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.


Notes:

Drivability analysis shall be performed for all CIP piles (unfilled pipe) using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans.

Check drivability for all CIP Pile in accordance with EPG 751.36.5.11.

Require dynamic pile testing for field verification for all CIP piles on the plans.

ϕdyn = 0.65 = Dynamic Testing resistance factor to be used to estimate nominal pile resistance during pile installation. This value may be increased if static load testing is specified per LRFD Table 10.5.5.2.3-1.

For additional design requirements, see EPG 751.36.5.1.

751.36.5.8 Additional Provisions for Pile Cap Footings

Pile Group Layout:

Pu = Total Factored Vertical Load.

Preliminary Number of Piles Required =

Layout a pile group that will satisfy the preliminary number of piles required. Calculate the maximum and minimum factored load applied to the outside corner piles assuming the pile cap/footing is perfectly rigid. The general equation is as follows:

Max. Load =  

Min. Load =  

The maximum factored load per pile must be less than or equal to PFDC for the pile type and size chosen. If not, the pile size must be increased or additional piles must be added to the pile group. Reanalyze until the pile type, size and layout are satisfactory.


Pile Uplift on End Bearing Piles and Friction Piles:

Service - I Limit State:
Minimum factored load per pile shall be ≥ 0.
Tension on a pile is not allowed for conventional bridges.
Strength and Extreme Event Limit States:
Uplift on a pile is not preferred for conventional bridges.
Maximum Pile Uplift load = │Minimum factored load per pile│ - │Factored pile uplift resistance│ ≥ 01
Note: Compute maximum pile uplift load if value of minimum factored load is negative.
1 The minimum factored load (maximum tensile load) per pile should preferably not result in uplift for the Strength and Extreme Event Limit States. Pile uplift for the Strength and Extreme Event limit states may be permitted by SPM or SLE based on infrequent uplift load cases and small magnitudes of uplift. This decision is based on the presumed difficulty of a pile cap footing to rotate, specifically for it to be able to rotate on piles driven to rock. When pile uplift is allowed, the necessity of top pile cap reinforcement shall be investigated and the standard anchorage detail for HP pile per EPG 751.36.4.1 Structural Steel HP Pile - Details shall be used.


Resistance of Pile Groups in Compression                                                                                                                          LRFD 10.7.3.9

If the cap is not in firm contact with the ground and if the soil at the surface is soft, the individual nominal resistance of each pile (751.36.5.5) shall be multiplied by an efficiency factor, , based on pile spacing.

751.36.5.9 Estimate Pile Length and Check Pile Capacity

751.36.5.9.1 Estimated Pile Length

Friction Piles:

Estimate the pile length required to achieve the minimum nominal axial compressive resistance, Rndr, for establishment of contract pile quantities. Perform a static analysis to determine the nominal resistance profile of the soil. For each soil layer the appropriate resistance factor, ϕstat, shall be applied to account for the reliability of the static analysis method chosen in order to create a factored resistance profile. The penetration depth would then occur at the location where the factored resistance profile intercepts the factored load. Similarly, for a uniform soil layer the adjusted nominal resistance, Rnstat, can be determined from the equation below.

ϕdyn x Rndr = ϕstat x Rnstat ≥ Factored Load LRFD C10.7.3.3-1

Where:

ϕdyn = see EPG.751.36.5.3
Rndr = Minimum nominal axial compressive resistance = Required nominal driving resistance
ϕstat = Static analysis resistance factor per LRFD Table 10.5.5.2.3-1 or as provided by the Geotechnical Engineer. Factors for side friction and end bearing may be different.
Rnstat = Adjusted Nominal resistance due to static analysis reliability

Use soil profiles from borings and mimic soil characteristics as closely as possible in computations or software to calculate the geotechnical resistance and for estimating the length of pile.

It is not advisable to design pile deeper than available borings or to reach capacity within the bottom 3 to 5 feet of borings. If a longer pile depth is needed to meet design requirements then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as the required pile length.

For friction pile the top five feet of soil friction resistance may be neglected with SPM or SLE approval for possible disturbance from MSE wall excavation prior to driving pile.

End Bearing Piles:

The estimated pile length is the distance along the pile from the cut-off elevation to the estimated tip elevation considering any penetration into rock. The estimated tip elevation shall not be shown on plans for end bearing piles.

The geotechnical material above the estimated end bearing tip elevation shall be reviewed for the presence of glacial till or similar layers. If these layers are present, then a static analysis shall be performed to verify if the required pile resistance is reached at a higher elevation due to pile friction capacity.

751.36.5.9.2 Check Pile Geotechnical Capacity (Axial Loads Only)

Use the same methodology outlined in EPG 751.36.5.9.1 Estimated Pile Length.

751.36.5.9.3 Check Pile Structural Capacity (Combined Axial and Bending)

Structural design checks which include lateral loading and bending shall be accomplished using the appropriate structural resistance factors.

751.36.5.10 Pile Nominal Axial Compressive Resistance

The minimum nominal axial compressive resistance, Rndr, must be calculated and shown on the final plans. The factored axial compressive resistance will be used to verify the pile group layout and loading. The minimum nominal axial compressive resistance will be used in construction field verification methods to obtain the required nominal driving resistance.

Minimum Nominal Axial Compressive Resistance = Required Nominal Driving Resistance, Rndr
= Maximum factored axial loads/ϕdyn
ϕdyn = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation. LRFD 10.5.5.2.3.1

The value of Rndr shown on the plans shall be the greater of the value required at the Strength limit state and Extreme Event limit state. This value shall not be greater than the structural nominal axial compressive resistance of the steel HP pile nor shall it exceed the maximum nominal driving resistance of the steel shell for CIP piles. See EPG 751.36.5.5.                                                                                    LRFD 10.7.7


For friction piles predominantly embedded and tipped in cohesionless soils the minimum nominal axial compressive resistance should be limited to the values shown in the following table. Please seek approval from the SPM or SLE before exceeding the limits provided.

Maximum Axial Loads for Friction Pile in Cohesionless Soils
Pile Type Minimum Nominal
Axial Compressive
Resistance (Rndr)1
(kips)
Maximum Factored Axial Load (kips)
Dynamic Testing Wave Equation
Analysis
FHWA-modified
Gates Dynamic
Pile Formula
ϕdyn= 0.65 ϕdyn = 0.50 ϕdyn = 0.40
CIP 14” 210 136 105 84
CIP 16” 240 156 120 96
CIP 20” 300 195 150 120
CIP 24” 340 221 170 136
1 The minimum nominal axial compressive resistance values are correlated to match the maximum design tonnage values used in past ASD practice. A factor of safety of 3.5 is used to determine the equivalent Rndr.

751.36.5.11 Check Pile Drivability

Drivability of the pile through the soil profile shall be investigated using Wave equation analysis program or other available software. Designers may import soil resistances from a static analysis program or input soil values directly into Wave equation analysis program to perform drivability.

If soil values are to be directly input into Wave equation analysis program, enter in values of sand and clay layers with specific values of cohesion or internal friction angle or just by uncorrected blow count values obtained from borings.

Drivability analysis shall be performed by the designer for all pile types (bearing pile and friction pile) using the Delmag D19-42 hammer with manufacturer recommendations. The drivability analysis shall confirm that the pile can be driven to the minimum tip elevation, rock elevation or reach the minimum nominal axial compressive resistance prior to refusal and without overstressing the pile. If the drivability analysis shows overstress or refusal prior to reaching the desired depth a lighter or heavier hammer from the table below may be used to confirm constructability. The drivability analysis is not intended to confirm that a pile can be driven through rock (shales, sandstones, etc…) where the likelihood of pile damage is increased and PDA is recommended to reduce loads and monitor pile stresses in the field. The drivability analyses performed by the designer do not waive the responsibility of the contractor in selecting the appropriate pile driving system per Sec 702.3.5 (also discussed below).

Use soil profiles from borings and mimic soil characteristics as closely as possible for computations or in software to perform drivability analysis of any kind of pile.

Structural steel HP Pile:

Drivability analysis shall be performed for two cases:

1. Box shape
2. Perimeter

Drivability shall be performed considering existing condition without considering any excavation/ disturbance (i.e., possible disturbance to top 5 feet of soil from MSE wall excavation prior to driving pile), liquefaction or future scour loss.

Hammer types:

Pile Driving Hammer Information For GRLWEAP
Hammer used in the field per survey response (2017)
GRLWEAP ID Hammer name No. of Responses
41 Delmag D19-421 13
40 Delmag D19-32 6
38 Delmag D12-42 4
139 ICE 32S 4
15 Delmag D30-32 2
Delmag D25-32 2
127 ICE 30S 1
150 MKT DE-30B 1
1 Delmag series of pile hammers is the most popular, with the D19-42 being the most widely used.

Hammer usage in the field will be surveyed every five years. The above results will be revised according to the new survey and the most widely used hammer will be selected for drivability analysis.

The contractor is responsible for determining the hammer energy required to successfully drive the pile to the minimum tip elevation and to reach the minimum nominal axial compressive resistance specified on the plans. The contractor shall perform a drivability analysis to select an appropriate hammer size to ensure the pile can be driven without overstressing the pile and to prevent refusal of the pile prior to reaching the minimum tip elevation. The contractor shall plan pile driving activities and submit hammer energy requirements to the engineer for approval before driving.

Practical refusal is defined at 20 blows/inch or 240 blows per foot.

Driving should be terminated immediately once 30 blows/inch is encountered.

Nominal Driving Stress LRFD 10.7.8
Nominal driving stress ≤ 0.9*ϕda*Fy
For structural steel HP pile, Maximum nominal driving stress = 45 ksi
For CIP pile, Maximum nominal driving resistance, see EPG 751.36.5.7.1.2 or EPG 751.36.5.7.2.2 (unfilled pipe for axial analysis).

If analysis indicates the piles do not have sufficient structural or geotechnical strength or drivability issues exist, then consider increasing the number of piles.

751.36.5.12 Information to be Included on the Plans

See EPG 751.50 A1 Design Specifications, Loadings & Unit Stresses for appropriate design stresses to be included in the general notes.

See EPG 751.50 E2 Foundation Data Table for appropriate data to be included in the foundation data table for HP pile and CIP pile and any additional notes required below the table. See Bridge Standard Drawings “Pile” for CIP data table.