Difference between revisions of "Where to Find PDM Information in the EPG"
Jump to navigation
Jump to search
m (updated link) |
m (→Chapter IV, Detail Design: updated link) |
||
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | ||
{|border="4" align="right" | {|border="4" align="right" | ||
|-style="background:salmon" | |-style="background:salmon" | ||
− | |[[:Category:237 Contract Plans|'''Return to Contract Plans''']] | + | |[[:Category:237 Contract Plans|<center>'''Return to<br/>EPG 237 Contract Plans'''</center>]] |
|} | |} | ||
Line 124: | Line 124: | ||
|[[:Category:231 Typical Section Elements for Roadways|231 Typical Section Elements for Roadways]]||colspan="2"|4-07 Urban Projects | |[[:Category:231 Typical Section Elements for Roadways|231 Typical Section Elements for Roadways]]||colspan="2"|4-07 Urban Projects | ||
|- | |- | ||
− | |[[ | + | |No direct correlation; may consult [[905.2 Traffic Studies|905.2 Traffic Studies]] and [[905.3 Transportation Impact Analysis|905.3 Transportation Impact Analysis]] || ||4-07.1 Urban Improvements |
|- | |- | ||
|[[:Category:641 Bicycle Facilities|641 Bicycle Facilities]] and [[:Category:642 Pedestrian Facilities|642 Pedestrian Facilities]]|| ||4-07.3 (1) (e) Bicycle/Pedestrian Facilities | |[[:Category:641 Bicycle Facilities|641 Bicycle Facilities]] and [[:Category:642 Pedestrian Facilities|642 Pedestrian Facilities]]|| ||4-07.3 (1) (e) Bicycle/Pedestrian Facilities | ||
Line 228: | Line 228: | ||
|[[:category:402 Bituminous Surface Leveling|402 Bituminous Surface Leveling]]|| ||4-09.27 Contract Leveling Course Projects | |[[:category:402 Bituminous Surface Leveling|402 Bituminous Surface Leveling]]|| ||4-09.27 Contract Leveling Course Projects | ||
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/files/5/5f/237.1 Sample Final Plans.pdf Sample Plans]||colspan="2"|4-10 Sample Plans |
|} | |} | ||
Line 266: | Line 266: | ||
|[[:category:350 Design for Bases and Aggregate Surfaces|350 Design for Bases and Aggregate Surfaces]]|| ||6-03.8 Base considerations | |[[:category:350 Design for Bases and Aggregate Surfaces|350 Design for Bases and Aggregate Surfaces]]|| ||6-03.8 Base considerations | ||
|- | |- | ||
− | |width="375"|[ | + | |width="375"|[https://epg.modot.org/files/f/f5/231_Diamond-Directional_Ramp_%28Any_ADT%29_%28D-50%29.pdf D50 Directional/Directional Ramps], [https://epg.modot.org/files/6/65/231_Loop_Ramp_%28D-51%29.pdf D51 Loop Ramps] and [https://epg.modot.org/files/a/a1/231_Multi-Lane_Ramp_%28D-53%29.pdf D53 Multi-lane ramps] in article [[:Category:231 Typical Section Elements for Roadways|231 Typical Section Elements for Roadways]]|| ||6-03.9 Ramps and High Speed Directional Ramp Design |
|- | |- | ||
|[[Other Aspects of Pavement Design#Thickness Determination|Thickness Determination]] and [[233.2 At-Grade Intersections with Stop and Yield Control#233.2.2 Median Openings|233.2.2 Median Openings]]|| ||6-03.10 Median Openings and Auxiliary Lanes | |[[Other Aspects of Pavement Design#Thickness Determination|Thickness Determination]] and [[233.2 At-Grade Intersections with Stop and Yield Control#233.2.2 Median Openings|233.2.2 Median Openings]]|| ||6-03.10 Median Openings and Auxiliary Lanes | ||
Line 342: | Line 342: | ||
|[[902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C)|902.3 Traffic Control Signal Needs Studies]]|| ||8-02.2 Obtaining Traffic Counts and 8-02.3 Warrants | |[[902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C)|902.3 Traffic Control Signal Needs Studies]]|| ||8-02.2 Obtaining Traffic Counts and 8-02.3 Warrants | ||
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.5_Traffic_Control_Signal_Features_%28MUTCD_Chapter_4D%29#902.5.2_Traffic_Signal_Operation 902.5.2 Traffic Signal Operation]|| ||8-02.4 Traffic Signals in Urban Areas, (1) – (3) |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.5_Traffic_Control_Signal_Features_%28MUTCD_Chapter_4D%29#902.5.8.1_Agreements 902.5.8.1 Agreements]|| ||8-02.4 (5) through (7) Bus Stops through Agreements |
|- | |- | ||
|[[902.4 Signal Installations and Equipment|902.4 Signal Installations and Equipment]]|| ||8-02.5 Design of Signal Installations, (1) Standardization | |[[902.4 Signal Installations and Equipment|902.4 Signal Installations and Equipment]]|| ||8-02.5 Design of Signal Installations, (1) Standardization | ||
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.5_Traffic_Control_Signal_Features_%28MUTCD_Chapter_4D%29#902.5.47_Use_of_Pavement_Markings_at_Signalized_Locations_.28MUTCD_Section_4D.35.29 902.5.47 Use of Pavement Markings at Signalized Locations]|| ||8-02.5 (2) Pavement Markings |
|- | |- | ||
|[[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)|902.5 Traffic Control Signal Features]]|| ||8-02.6 Signal Phasing | |[[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)|902.5 Traffic Control Signal Features]]|| ||8-02.6 Signal Phasing | ||
Line 354: | Line 354: | ||
|[[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)|902.5 Traffic Control Signal Features]]|| || 8-02.7 Method of Signal Control | |[[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)|902.5 Traffic Control Signal Features]]|| || 8-02.7 Method of Signal Control | ||
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.1_Preparation_of_Plans 902.15.1 Preparation of Plans]|| ||8-02.8 Auxiliary Equipment for Controllers |
|- | |- | ||
|[[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)|902.5 Traffic Control Signal Features]]|| ||8-02.9 Meaning and Application of Signal Indications | |[[902.5 Traffic Control Signal Features (MUTCD Chapter 4D)|902.5 Traffic Control Signal Features]]|| ||8-02.9 Meaning and Application of Signal Indications | ||
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.2_Location_of_Signals_and_Appurtenances 902.15.2 Location of Signals and Appurtenances]|| ||8-02.10 Location of Signals and Appurtenances |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.3_Detectors 902.15.3 Detectors] || ||8-02.11 Detectors |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.4_Pull_Boxes 902.15.4 Pull Boxes] || ||8-02.12 Pull Boxes |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.5_Conduit_System 902.15.5 Conduit System]|| ||8-02.13 Conduit System |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.6_Control_and_Power_Ccable 902.15.6 Control and Power Cable]|| ||8-02.14 Control and Power Cable |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.6.4_Circuit_Breaker_Trip_Rating 902.15.6.4 Circuit Breaker Trip Rating]|| ||8-02.15 Circuit Breaker Trip Rating |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.6.5_Cable_Size_from_Power_Supply_to_Controller 902.15.6.5 Cable Size from Power Supply to Controller]|| ||8-02.16 Cable Size from Power Supply to Controller |
|- | |- | ||
− | |[ | + | |[https://epg.modot.org/index.php?title=902.15_Designing_a_Traffic_Signal#902.15.1_Preparation_of_Plans 902.15.1 Preparation of Plans]|| ||8-02.17 Preparation of Plans |
|- | |- | ||
|[[:category:903 Highway Signing|903 Highway Signing]]||colspan="2"|8-03 Highway Signing and 8-03.1 General | |[[:category:903 Highway Signing|903 Highway Signing]]||colspan="2"|8-03 Highway Signing and 8-03.1 General | ||
Line 384: | Line 384: | ||
|[[903.8 Freeway and Expressway Guide Signs#903.8.3 General Design (MUTCD Section 2E.04)|903.8.3 General Design]]|| ||8-03.6 Guide Sign Design | |[[903.8 Freeway and Expressway Guide Signs#903.8.3 General Design (MUTCD Section 2E.04)|903.8.3 General Design]]|| ||8-03.6 Guide Sign Design | ||
|- | |- | ||
− | |[[903. | + | |[[903.17 Delineation and Object Markers|903.17 Delineation and Object Markers]]|| ||8-03.7 Miscellaneous Signing Items |
|- | |- | ||
− | |[[903.9 General Information Signs#903.9.4 Emergency Reference Markers (D10-5)|903.9.4 Emergency Reference Markers (D10-5)]]|| ||8-03.7 (1) Mileposts | + | |[[903.9 General Information Signs#903.9.4 Emergency Reference Markers (D10-5 and D10-5a) (MUTCD Section 2H.06))|903.9.4 Emergency Reference Markers (D10-5 and D10-5a)]]|| ||8-03.7 (1) Mileposts |
|- | |- | ||
− | |[[903. | + | |[[903.17 Delineation and Object Markers|903.17 Delineation and Object Markers]]|| ||8-03.7 (2) Delineators and (3) Object Markers |
|- | |- | ||
− | |[[903.2 Extent of Signing#903.2. | + | |[[903.2 Extent of Signing#903.2.25.3 Signing Plans|903.2.25.3 Signing Plans]]|| ||8-03.8 Signing Plans |
|- | |- | ||
− | |[[903.2 Extent of Signing#903.2. | + | |[[903.2 Extent of Signing#903.2.25.4 Quantity Computations|903.2.25.4 Quantity Computations]]|| ||8-03.9 Computations of Quantities |
|- | |- | ||
|[[:category:616 Temporary Traffic Control|616 Temporary Traffic Control]]||colspan="2"|8-04 Temporary Traffic Control Plans | |[[:category:616 Temporary Traffic Control|616 Temporary Traffic Control]]||colspan="2"|8-04 Temporary Traffic Control Plans | ||
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.1 General |
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.2 Work Zone Signing and 8-04.3 Guidelines for Work Zone Signing Applications |
|- | |- | ||
− | |[ | + | |[https://epg.modot.mo.gov/index.php?title=616.6_Temporary_Traffic_Control_Zone_Devices_%28MUTCD_6F%29#616.6.60_Portable_Changeable_Message_Signs_.28MUTCD_6F.60.29 616.6.60 Changeable Message Signs (CMS)]|| ||8-04.4 Changeable Message Signs (CMS) |
|- | |- | ||
|[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)|616.6.68 Type 1 or 3 Barricades (MUTCD 6F.68)]]|| ||8-04.5 Type III Movable Barricades | |[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)|616.6.68 Type 1 or 3 Barricades (MUTCD 6F.68)]]|| ||8-04.5 Type III Movable Barricades | ||
|- | |- | ||
− | |[[616. | + | |[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.63 Channelizing Devices (MUTCD 6F.63)|616.6.63 Channelizing Devices]]|| ||8-04.6 Channelizing Devices |
|- | |- | ||
|[[617.1 Temporary Traffic Barriers|617.1 Temporary Traffic Barriers]]|| ||8-04.7 Temporary Concrete Traffic Barrier Temporary | |[[617.1 Temporary Traffic Barriers|617.1 Temporary Traffic Barriers]]|| ||8-04.7 Temporary Concrete Traffic Barrier Temporary | ||
Line 410: | Line 410: | ||
|[[:category:620 Pavement Marking|620 Pavement Marking]]|| ||8-04.8 Pavement Marking | |[[:category:620 Pavement Marking|620 Pavement Marking]]|| ||8-04.8 Pavement Marking | ||
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.9 Lighting Devices and 8-04.10 Work Zone Lighting |
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.11 Flashing Arrow Panels |
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.12 Bypasses, Crossovers and Temporary Connections through 8-04.16 Temporary Signals and Intersections |
|- | |- | ||
|[[616.17 Pavement Edge Treatment|616.17 Pavement Edge Treatment]]|| ||8-04.17 Pavement Edge Treatment | |[[616.17 Pavement Edge Treatment|616.17 Pavement Edge Treatment]]|| ||8-04.17 Pavement Edge Treatment | ||
Line 420: | Line 420: | ||
|[[616.16 Law Enforcement Services|616.16 Law Enforcement Services]]|| ||8-04.18 Law Enforcement Services | |[[616.16 Law Enforcement Services|616.16 Law Enforcement Services]]|| ||8-04.18 Law Enforcement Services | ||
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.19 Temporary Median Crossovers for Construction Equipment |
|- | |- | ||
|[[616.24 Traffic Control for Non-Motorized Traffic|616.24 Traffic Control for Non-Motorized Traffic]]|| ||8-04.20 Traffic Control for Non-Motorized Traffic | |[[616.24 Traffic Control for Non-Motorized Traffic|616.24 Traffic Control for Non-Motorized Traffic]]|| ||8-04.20 Traffic Control for Non-Motorized Traffic | ||
Line 426: | Line 426: | ||
|[[616.15 Transit Considerations|616.15 Transit Considerations]]|| ||8-04.21 Transit Considerations | |[[616.15 Transit Considerations|616.15 Transit Considerations]]|| ||8-04.21 Transit Considerations | ||
|- | |- | ||
− | |[[616 | + | |No direct correlation; refer to [[:Category:616 Temporary Traffic Control|EPG 616 Temporary Traffic Control]] || ||8-04.22 Special Provisions |
|- | |- | ||
− | |[[616. | + | |[[616.8 Typical Applications (MUTCD 6H)|616.8 Typical Applications]] || ||8-04.23 Typical Applications |
|- | |- | ||
|[[:category:620 Pavement Marking|620 Pavement Marking]]||colspan="2"|8-05 Pavement Marking | |[[:category:620 Pavement Marking|620 Pavement Marking]]||colspan="2"|8-05 Pavement Marking | ||
Line 460: | Line 460: | ||
|} | |} | ||
+ | [[image:where to find PDM info in the EPG.jpg|center|775px]] | ||
[[category:237 Contract Plans]] | [[category:237 Contract Plans]] |
Latest revision as of 07:38, 11 March 2022
EPG 237 Contract Plans |
Contents
Chapter I, General Information
EPG article | PDM section | |
---|---|---|
No correlation | 1-01.1 and 1-01.2 | |
Help article and other definitions found throughout EPG | 1-01.3, Definitions | |
No correlation | 1-01.4 Abbreviations | |
101 Standard Forms | 1-01.5 Standard Forms | |
106.11 Metric Implementation | 1-01.6, Metrication | |
104 Scope | 1-02 Project Initialization and Estimating | |
104 Scope | 1-02.1 and 1-02.2 | |
121.2 The Planning Process | 1-02.3 Needs Identification and 1-02.4 Needs Prioritization | |
104.7 Estimates | 1-02.5 Initial Project Estimates | |
104.2 Project Scoping, 121.2 The Planning Process | 1-02.6 Project Scoping | |
104.11 Project Scoping Documentation | 1-02.7 Project Scoping Memorandum | |
104.6 Project Scoping Checklists | 1-02.8 Project Scoping Checklists | |
121.5 Prioritization Factors | 1-02.9 Project Prioritization | |
121.3 The STIP | 1-02.10 STIP Commitments | |
104.12 Scope Changes (Scope, Estimate or Fiscal Year) | 1-02.11 Scope Changes | |
104.7 Estimates | 1-02.12 Project Cost Estimates | |
103.1.8 Final Engineer’s Estimate | 1-02.13 Engineer’s Estimate | |
103.1.10 Bid Analysis Process | 1-02.14 Bid Analysis Process | |
103.1.11 Recommendations for Award or Rejection of Bids | 1-02.15 Recommendations for Award or Rejection of Bids | |
No correlation | 1-03 General Procedures | |
134 Engineering Professional Services | 1-03.4 Consultant Services | |
235.7 Distribution of Preliminary Plans | 1-03.6 Distribution of Preliminary Plans and Drawings | |
123 Federal-Aid Highway Program | 1-04 Federal-Aid Highway Program |
Chapter II, Preliminary Design
EPG article | PDM section | |
---|---|---|
128 Conceptual Studies | 2-01 Conceptual Study | |
126 Location Study and Alternative Analysis | 2-02 Location Study/Environmental Report | |
129 Public Involvement | 2-03 Public Hearings and Meetings | |
127 MoDOT and the Environment | 2-04 Environmental Document | |
130 Value Engineering | 2-05 Value Engineering Policies and Procedures | |
235 Preliminary Plans | 2-06 Preliminary Plans |
Chapter III, Surveys
EPG article | PDM section | |
---|---|---|
238.3 Route Surveying | 3-01 General and 3-02 Conventional Surveys | |
238.1 Photogrammetric Surveying | 3-03 Photogrammetric Surveys | |
238.2 Land Surveying | 3-04 Location Surveys |
Chapter IV, Detail Design
EPG article | PDM section | |
---|---|---|
No correlation | 4.01 General | |
237.1 Plan Details | 4-01.1 Accuracy for Plan Dimensions | |
236.13 Designing Right of Way Plans | 4-02 Right of Way Plans | |
237 Contract Plans | 4-03 Plans-Specifications-Estimates | |
No correlation | 4-04.1 Basic Design Data | |
230.2 Vertical Alignment | 4-04.2 Profile Grade and Vertical Alignment Controls | |
230.1 Horizontal Alignment | 4-04.3 Horizontal Alignment | |
Soil Characteristics | 4-04.4 Cut and Fill Slopes | |
231.1 Median Width | 4-04.5 Medians | |
230.2.1.13 Outer Roads and Service Roads | 4-04.6 Outer Roadways and Service Roads | |
233 At-Grade Intersections | 4-05 Intersections At Grade | |
234 Interchanges | 4-06 Interchanges | |
231 Typical Section Elements for Roadways | 4-07 Urban Projects | |
No direct correlation; may consult 905.2 Traffic Studies and 905.3 Transportation Impact Analysis | 4-07.1 Urban Improvements | |
641 Bicycle Facilities and 642 Pedestrian Facilities | 4-07.3 (1) (e) Bicycle/Pedestrian Facilities | |
232.3 Two-Way Left-Turn Lanes | 4-07.3 (1) (h) Two-Way Left-Turn Lanes | |
232.5 Freeways | 4-07.3 (3) Freeways | |
202 Removal of Buildings and Structures | 4-08.1 Removal of Existing Structures, Buildings, and Miscellaneous Items | |
201 Clearing and Grubbing | 4-08.2 Clearing and Grubbing | |
No correlation | 4-08.3 Grading | |
214 Rock Fill | 4-08.3 (h) Rock Fill | |
207 Linear Grading | 4-08.3 (2) Linear Grading | |
209 Subgrade Preparation | 4-08.3 (3) Subgrade Preparation | |
211 Subgrade Scarifying | 4-08.3 (4) Subgrade Scarifying | |
210 Subgrade Compaction | 4-08.3 (5) Subgrade Compaction | |
212 Subgrading and Shouldering | 4-08.3 (6) Subgrading and Shouldering | |
No correlation | 4-08.3 (7) Shaping Shoulders | |
215 Shaping Slopes | 4-08.3 (8) Shaping Slopes | |
No correlation | 4-08.3 (9) Plans | |
No correlation | 4-08.4 Compaction | |
752 Bridges Used in Place | 4-09.1(1) Bridges used in Place | |
718 Temporary Bridge | 4-09.1(2) Temporary Bridges | |
748.8 Bridge Drainage | 4-09.1(3) Bridge Drainage | |
503 Bridge Approach Slabs | 4-09.1(4) Bridge Approach Slabs | |
504 Concrete Approach Pavement | 4-09.1(5) Concrete Approach Pavement | |
1045.5 Color of Structural Steel Paint | 4-09.1(6) Color of Structural Steel Paint | |
232.1 Climbing Lanes | 4-09.2 Climbing Lanes for Two Lane Highways | |
609 Paved Drainage | 4-09.3 Curbs, Curb and Gutter | |
806 Pollution, Erosion and Sediment Control | 4-09.4 Erosion Control | |
611 Embankment Protection | 4-09.5 Embankment Protection | |
607 Fencing | 4-09.6 Fencing | |
606 Guardrail and Guard Cable | 4-09.7 Guardrail and 4-04.5(2) Median Barrier | |
646.1 Manholes | 4-09.8 Manholes | |
731 Precast Reinforced Concrete Manholes and Drop Inlets | 4-09.9 Precast Concrete Drop Inlets | |
646.2 Pipelines | 4-09.10 Pipelines | |
646.3 Private Underpasses | 4-09.11 Private Underpasses | |
No correlation | 4-09.12 Job Numbers | |
643.4 Railroads | 4-09.13 Railroads | |
231.2 Clear Zones | 4-09.14 Clear Zones | |
Temporary Connections and Bypasses | 4-09.15 Temporary Connections | |
643.1 Utilities – Status and Liability Acceptance | 4-09.16 Utilities | |
No correlation | 4-09.17 Temporary U-turn Median Openings on Freeways | |
644 Weigh Stations, Rest Areas, Welcome/Information Centers and Commuter Parking Lots | 4-09.18 Weigh Stations and Rest Areas | |
646.4 Work Funded by Maintenance | 4-09.19 Work by Maintenance | |
236.17 Junkyards | 4-09.20 Junkyard Control | |
127 MoDOT and the Environment | 4-09.21 Permits | |
No correlation | 4-09.22 Distribution Policy | |
136 Local Public Agency (LPA) Policy | 4-09.22 (2) Local Public Agency Manual (LPA) | |
127.18 Job Special Provisions (JSP) and Contract Documents | 4-09.22 (3) Job Special Provisions | |
125 CADD Services | 4-09.22 (4) Microstation “Format/Special Sheets” | |
237.10 Distribution of Contract Plans | 4-09.22 (5) Final Plans | |
131.2 Proprietary Items and Public Interest Findings | 4-09.23 Proprietary Items and 4-09.24 Public Interest Findings | |
641 Bicycle Facilities and 642 Pedestrian Facilities | 4-09.25 Bicycle/Pedestrian Facilities | |
822 Roadside Vegetation Management | 4-09.26 Mowing | |
402 Bituminous Surface Leveling | 4-09.27 Contract Leveling Course Projects | |
Sample Final Plans.pdf Sample Plans | 4-10 Sample Plans |
Chapter V, Bridge Report and Layout
EPG article | PDM section | |
---|---|---|
747 Bridge Reports and Layouts | Chapter V, Bridge Report and Layout |
Chapter VI, Pavement Structure Design
EPG article | PDM section | |
---|---|---|
Soil Characteristics | 6-01 Subgrade | |
605 Underdrainage | 6-02 Underdrains | |
No correlation | 6-03 Pavements | |
No correlation | 6-03.1 General and 6-03.2 Definitions | |
Thickness Determination | 6-03.3 Pavement Thickness Determination | |
Alternate and Optional Pavement | 6-03.4 Alternate Pavements | |
450 Bituminous Pavement Design | 6-03.5 Flexible Pavement Design | |
550 Portland Cement Concrete Pavement Design | 6-03.6 Rigid Pavement Design | |
No correlation | 6-03.7 Composite Pavement Design | |
350 Design for Bases and Aggregate Surfaces | 6-03.8 Base considerations | |
D50 Directional/Directional Ramps, D51 Loop Ramps and D53 Multi-lane ramps in article 231 Typical Section Elements for Roadways | 6-03.9 Ramps and High Speed Directional Ramp Design | |
Thickness Determination and 233.2.2 Median Openings | 6-03.10 Median Openings and Auxiliary Lanes | |
Temporary Connections and Bypasses | 6-03.11 Temporary Bypass | |
No correlation | 6-04 Shoulders | |
Shoulder Maintenance | 6-04.1 Shoulder Types | |
626 Rumble Strips | 6-04.6 Shoulder Rumble Strips | |
No correlation | 6-05 3R/4R Projects | |
606.1.3 Applications | 6-05.11 Guardrail | |
409 Seal Coat | 6-06 Seal Coats | |
450 Bituminous Pavement Design | 6-07 Bituminous Construction Materials |
Chapter VII, Utilities
EPG article | PDM section |
---|---|
643.1 Utilities – Status and Liability Acceptance | 7-01 General |
643.2 Local Utility Adjustments – Public and Private | 7-02 Local Public and Private Utility Adjustments |
643.3 Policy, Standards and Regulations | 7-03 Policy, Standards and Regulations |
643.4 Railroads | 7-04 Railroads |
106.11 Metric Implementation | 7-05 Metric Policy |
Chapter VIII, Traffic Control Devices
EPG article | PDM section | |
---|---|---|
901 Lighting | 8-01 Highway Lighting | |
901.15 Glossary | 8-01.1 Definitions | |
901.1 Lighting to be Provided, Operated and Maintained at State Expense | 8-01.2 (1) Lighting to be Provided, Operated and Maintained at State Expense | |
901.2 Lighting to be Provided, Operated and Maintained at the Expense of the Local Political Subdivision | 8-01.2 (2) Lighting to be Provided, Operated and Maintained at the Expense of the Local Political Subdivision | |
901.3 Lighting to be Adjusted at State Expense and Operated and Maintained at the Expense of the Local Political Subdivision | 8-01.2 (3) Lighting to be Adjusted at State Expense and Operated and Maintained at the Expense of the Local Political Subdivision | |
901.4 State Participation in Continuous Freeway Lighting by a Local Political Subdivision | 8-01.2 (4) State Participation in Continuous Freeway Lighting by a Local Political Subdivision | |
901.5 Future Lighting | 8-01.2 (5) Future Lighting | |
901.6 Programming | 8-01.3 Programming and 8-01.4 Design, (1) Authorization | |
901.7 Light Source and Intensity | 8-01.4 (2) Light Source and Intensity through 8-01.4 (8) Control Station and Power Supply | |
901.8 Circuiting | 8-01.4 (9) Circuiting through 8-01.4 (11) Poles, Bracket Arms and Foundations | |
901.9 Luminaires | 8-01.4 (12) Luminaires through 8-01.4 (14) Summary | |
901.10 Preparation of Plans | 8-01.5 Preparation of Plans | |
901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination | 8-01.6 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination | |
901.12 Electrical Components | 8-01.7 Electrical Components | |
902 Signals | 8-02 Traffic Signals and 8-02.1 General | |
902.3 Traffic Control Signal Needs Studies | 8-02.2 Obtaining Traffic Counts and 8-02.3 Warrants | |
902.5.2 Traffic Signal Operation | 8-02.4 Traffic Signals in Urban Areas, (1) – (3) | |
902.5.8.1 Agreements | 8-02.4 (5) through (7) Bus Stops through Agreements | |
902.4 Signal Installations and Equipment | 8-02.5 Design of Signal Installations, (1) Standardization | |
902.5.47 Use of Pavement Markings at Signalized Locations | 8-02.5 (2) Pavement Markings | |
902.5 Traffic Control Signal Features | 8-02.6 Signal Phasing | |
902.5 Traffic Control Signal Features | 8-02.7 Method of Signal Control | |
902.15.1 Preparation of Plans | 8-02.8 Auxiliary Equipment for Controllers | |
902.5 Traffic Control Signal Features | 8-02.9 Meaning and Application of Signal Indications | |
902.15.2 Location of Signals and Appurtenances | 8-02.10 Location of Signals and Appurtenances | |
902.15.3 Detectors | 8-02.11 Detectors | |
902.15.4 Pull Boxes | 8-02.12 Pull Boxes | |
902.15.5 Conduit System | 8-02.13 Conduit System | |
902.15.6 Control and Power Cable | 8-02.14 Control and Power Cable | |
902.15.6.4 Circuit Breaker Trip Rating | 8-02.15 Circuit Breaker Trip Rating | |
902.15.6.5 Cable Size from Power Supply to Controller | 8-02.16 Cable Size from Power Supply to Controller | |
902.15.1 Preparation of Plans | 8-02.17 Preparation of Plans | |
903 Highway Signing | 8-03 Highway Signing and 8-03.1 General | |
903.1 Extent of Signing | 8-03.1 (1) Interstate System, (2) Highways Other Than the Interstate System, 8-03.2 Extent of Signing and 8-03.3 Plan Development Procedure | |
903.3 Ground-Mounted Sign Supports | 8-03.4 Ground Mounting | |
903.4 Overhead Guide Sign Mounting | 8-03.5 Overhead Guide Sign Mounting | |
903.8.3 General Design | 8-03.6 Guide Sign Design | |
903.17 Delineation and Object Markers | 8-03.7 Miscellaneous Signing Items | |
903.9.4 Emergency Reference Markers (D10-5 and D10-5a) | 8-03.7 (1) Mileposts | |
903.17 Delineation and Object Markers | 8-03.7 (2) Delineators and (3) Object Markers | |
903.2.25.3 Signing Plans | 8-03.8 Signing Plans | |
903.2.25.4 Quantity Computations | 8-03.9 Computations of Quantities | |
616 Temporary Traffic Control | 8-04 Temporary Traffic Control Plans | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.1 General | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.2 Work Zone Signing and 8-04.3 Guidelines for Work Zone Signing Applications | |
616.6.60 Changeable Message Signs (CMS) | 8-04.4 Changeable Message Signs (CMS) | |
616.6.68 Type 1 or 3 Barricades (MUTCD 6F.68) | 8-04.5 Type III Movable Barricades | |
616.6.63 Channelizing Devices | 8-04.6 Channelizing Devices | |
617.1 Temporary Traffic Barriers | 8-04.7 Temporary Concrete Traffic Barrier Temporary | |
620 Pavement Marking | 8-04.8 Pavement Marking | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.9 Lighting Devices and 8-04.10 Work Zone Lighting | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.11 Flashing Arrow Panels | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.12 Bypasses, Crossovers and Temporary Connections through 8-04.16 Temporary Signals and Intersections | |
616.17 Pavement Edge Treatment | 8-04.17 Pavement Edge Treatment | |
616.16 Law Enforcement Services | 8-04.18 Law Enforcement Services | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.19 Temporary Median Crossovers for Construction Equipment | |
616.24 Traffic Control for Non-Motorized Traffic | 8-04.20 Traffic Control for Non-Motorized Traffic | |
616.15 Transit Considerations | 8-04.21 Transit Considerations | |
No direct correlation; refer to EPG 616 Temporary Traffic Control | 8-04.22 Special Provisions | |
616.8 Typical Applications | 8-04.23 Typical Applications | |
620 Pavement Marking | 8-05 Pavement Marking |
Chapter IX, Hydraulics and Drainage
EPG article | PDM section |
---|---|
700 Structures and Hydraulics | 9-01 General |
749 Hydrologic Analysis | 9-02 Hydrologic Analysis |
750.1 Open Channels | 9-03 Open Channels (English Only) |
750.6 Erosion Control and Energy Dissipation | 9-04 Erosion Control and Energy Dissipation |
640.2 Median Drainage | 9-05 Median Drainage |
750.2 Culverts | 9-06 Crossroad Structures (English only) |
640.1 Pavement Drainage | 9-07 Pavement Drainage |
750.4 Storm Sewers | 9-08 Storm Sewers |
750.5 Sanitary Sewers | 9-09 Sanitary Sewers (English only) |
750.7 Non-Hydraulic Considerations | 9-10 Non-Hydraulic Aspects of Drainage Design |