Difference between revisions of "LPA:136.12 Figures, Glossary and Other Useful Links"
m (→136.14.5 Recent Changes to LPA Policy: Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.) |
m (→136.14.4 Links to Other Resources: Per LPA, added two links) |
||
Line 298: | Line 298: | ||
*[http://mltrc02.srv.mst.edu/index.html? Missouri LTAP, Local Technical Assistance Program] | *[http://mltrc02.srv.mst.edu/index.html? Missouri LTAP, Local Technical Assistance Program] | ||
+ | |||
+ | *[http://www.fhwa.dot.gov/federalaid/projects.cfm Guide to Federal-Aid Programs and Projects] | ||
+ | |||
+ | *[http://www.fhwa.dot.gov/reports/financingfederalaid/ Financing Federal-Aid Highways] | ||
===136.14.5 Recent Changes to LPA Policy=== | ===136.14.5 Recent Changes to LPA Policy=== |
Revision as of 10:49, 16 December 2011
Printable Version of EPG 136 LPA Policy |
Local Public Agency Policy |
EPG 136 LPA Policy presents the very latest LPA information and this Word file may be helpful for those wanting to easily print the LPA information. |
Please use the LPA Manual Change Request Form to request manual changes throughout the year or the Revisions Comments Form to make comments on proposed revisions.
Contents
136.14.1 Local Programs
Local Programs provides federal funding to cities and counties for their transportation improvements. Please refer to EPG 136 Local Public Agency Policy for guidance to utilize federal funding made available to local agencies through the programs listed below.
136.14.1.1 Transportation Enhancements (TE)
Transportation Enhancements District Contacts |
This program provides funding through a competitive selection process for transportation related activities other than routine highway and bridge construction. For program details and project examples, click on the desired district, listed to the right, to access the TE Guide.
136.14.1.2 Off-System Bridge Replacement and Rehabilitation (BRO)
This program provides funding to counties for replacement or rehabilitation of deficient bridges.
136.14.1.3 On-System Bridge Replacement and Rehabilitation (BRM)
This program provides funding through a competitive selection process for replacement or rehabilitation of deficient bridges.
136.14.1.4 Congestion Mitigation and Air Quality (CMAQ)
This program provides funding for projects that improve air quality within Environmental Protection Agency designated areas.
136.14.1.5 Surface Transportation Program (STP)
Large Urban
This program provides funding for transportation facilities within the Transportation Management Areas of Kansas City, Springfield and St. Louis.
Small Urban
This program provides funding for transportation facilities within urban areas with an urban cluster population greater than 5,000.
136.14.2 MoDOT District and Central Office Information
NW District | NE District | Kansas City District | Central District |
---|---|---|---|
St. Joseph | Hannibal | Lee's Summit | Jefferson City |
St. Louis District | SW District | SE District | |
Chesterfield | Springfield | Sikeston | |
Central Office | |||
MoDOT – Resource Management (RM) | MoDOT - Design (DE) | ||
P.O. Box 270 | P.O. Box 270 | ||
Jefferson City, MO 65102 | Jefferson City, MO 65102 | ||
(573) 526-8106; Fax: (573) 526-2819 | (573) 751-2876; Fax: (573) 526-3261 | ||
__________________ | |||
METROPOLITAN PLANNING ORGANIZATIONS | |||
__________________ | |||
OTHER REGULATORY AGENCIES | |||
State Historic Preservation Office | Charles Scott | ||
MO Dept. of Natural Resources | Field Supervisor | ||
P.O. Box 176 | Columbia Field Office | ||
Jefferson City, MO 65102 | U.S. Fish and Wildlife Service | ||
Phone (573) 751-2479 | 101 Park DeVille Drive, Suite A | ||
Columbia, MO 65203-0007 | |||
Phone (573) 234-2132 | |||
Policy and Coordination Division | Kevin Ward | ||
MO Dept. of Conservation | Federal Highway Administration | ||
P.O. Box 180 | 3220 W. Edgewood, Suite H | ||
Jefferson City, MO 65102-0180 | Jefferson City, MO 65109 | ||
Phone (573) 751-4115 | Phone (573) 636-7104 | ||
__________________ | |||
CORPS OF ENGINEER'S OFFICE | |||
(Contact MoDOT district office if clarification is needed for which Corp Office has jurisdiction) | |||
Commanding Officer | Commanding Officer | ||
Department of the Army | U.S. Army Corps of Engineers | ||
Little Rock Dist., Corps of Engineers | Kansas City District | ||
P.O. Box 867 | 700 Federal Office Building | ||
Little Rock, AR 72203-0867 | 601 East 12th Street | ||
Phone (501) 324-5531 | Kansas City, MO 64106 | ||
Phone (816) 426-5241 | |||
Commanding Officer | Commanding Officer | ||
Department of the Army | Department of the Army | ||
Rock Island Dist., Corps of Engineers | Memphis Dist., Corps of Engineers | ||
P.O. Box 2004 | 167 North Main Street, Room B202 | ||
Rock Island, IL 61204-2004 | Memphis, TN 38103-1894 | ||
Phone (309) 788-6361 | Phone (901) 544-3005 | ||
Commanding Officer | |||
U.S. Army Corps of Engineers | |||
St. Louis District | |||
1222 Spruce Street | |||
St. Louis, MO 63103-2833 | |||
Phone (314) 331-8000 |
136.14.3 Other Helpful Information
136.14.3.1 Commonly Used Forms
Disadvantaged Business Enterprise Program Requirements for Local Programs
Form 1590, Federal Funding Accountability and Transparency Act (FFATA)
On the Job Training Manual and Submittal Forms
FHWA Form 1273 Required Contract Provisions
Utility Agreement - Actual Cost
Daily Force Account Record-Equipment Rental Account/Materials Account
Daily Force Account Record-Labor Account
Force Account Record - Cost Summary
Construction Contract Calls for Bid
Awarded Construction Contracts
136.14.3.2 Examples of Completed Forms
Utility Lump Sum Estimate Example
Utility Actual Cost Estimate Example
Sample Utilities Status Letter
Sample Job Special Provisions for Utilities
Sample Utility Agreement - Lump Sum
Sample Utility Agreement - Actual Cost
Bridge Slab Pour Checklist & Pre-Pour Meeting Topics
136.14.4 Links to Other Resources
- Equal Employment Opportunity Requirements (41 CFR 60.1 and 41 CFR 60.2)
136.14.5 Recent Changes to LPA Policy
11/30/11: The Obligation Request Form was updated in EPG 136.14.3.1 Commonly Used Forms. In EPG 136.6 Consultant Contracts, two forms were updated: Fig. 136.6.2 Criteria for Evaluating Consultants (which now includes additional guidance and deleted proximity from criteria) and Fig. 136.6.7 Sample Solicitation (which now includes the sample scopes to the sample solicitation).
11/23/11: In EPG 136.14.3.1 Commonly Used Forms, above, a link to Form 1590 FFATA was added.
10/21/11: In EPG 136.11.2 Consultant Construction Engineering Services, guidance was clarified about work (surveying) performed by a consulting engineering firm.
10/18/11: DBE goals are now required in all contracts, regardless of contract amount, as now reflected in EPG 136.6 Consultant Contracts.
10/5/11: In EPG 136.6.7 Supplemental Agreements, guidance for Supplemental Agreements has been clarified.
9/30/11: Fig. 136.6.7 Sample Solicitation was updated in EPG 136.6 Consultant Contracts by the addition of a "Submit" box that included the definition of a page.
9/29/11: The Obligation Request Form added to EPG 136.14.3.1 Commonly Used Forms.
8/23/11: In EPG 136.8.8.3 Deficiencies, the bridge ratings were corrected to bring the table into compliance with Bridge standards.
8/17/11: In EPG 136.6 Consultant Contracts, updated Fig. 136.6.1, Fig. 136.6.2, Fig. 136.6.7 and added new Engineering Services Sample Invoice spreadsheet.
8/11/11: In EPG 136, guidance was added to help users find info in the EPG. The video provides general guidance for MoDOT employees but it also is useful for other officials.
7/25/11: In EPG 136.7.2.2 Design Public Hearings, the reference to design public hearing being held for any job requiring a road closure was removed. It is no longer the practice.
7/6/11: A link to the NHI course, "Improving the Daily Diary", was added to EPG 136.11.7 General Documentation Requirements.
6/20/11: At the top of EPG 136.10 Construction Authorization and Letting, Fig 136.10.5 was updated to refer to 2011 specs rather than 2004 specs.
6/10/11: Expanded guidance, EPG 136.10.14 Request for Concurrence, has been provided to clarify an LPA's request for concurrence.
6/6/11: For greater clarity, two subtitles were entered to divide much of EPG 136.10.11 into EPG 136.10.12 Advertising and Addenda and EPG 136.10.13 Additive Alternates.
6/2/11: References to the 2004 specbook were updated in EPG 136.9.11, EPG 136.10 (in the article's text and in Fig. 136.10.1) and in EPG 136.13 Glossary. The last printed edition of the specbook is the 2011 edition. The latest specbook information will be available online.
5/23/11: Wage rate guidance in EPG 136.10.1 was clarified. New boilerplate document was added to EPG 136.10.2 so LPAs have a starting point for bid proposal documents.
5/6/11: Additional guidance regarding contracts exceeding $100,000 is provided at EPG 136.6.5 Evaluations.
5/4/11: In EPG 136.11.9, #1 was clarified and #2 updated.
4/28/11: No. 4 in EPG 136.11.6 was expanded and clarified.
4/13/11: Files available to non-MODOT agencies were updated in EPG 136.5 Agreements.
3/2/11: Added a link from the Additional Information box at the top of EPG 136.6 to the Allowable Profit Curve chart in EPG 134.3.
2/24/11: Updated the DBE Submittal Form and Disadvantaged Busn. Enterprise Program Form in EPG 136.14.3.1 Commonly Used Forms.
2/24/11: Minor update by changing a link in Item #3 in EPG 136.11.9.
2/15/11: Final trainee summary guidance was updated in the third paragraph of EPG 136.10.4.
2/15/11: Another update to Fig. 136.6.1 Contract in EPG 136.6 Consultant Contracts.
2/3/11: Updated Fig. 136.6.1 Contract in EPG 136.6 Consultant Contracts.
1/13/11: Numerous changes to EPG 136.2 from a recent FHWA audit include a new checklist and requires certification by the engineer of record. Also, it is now to be assumed that if rehabilitation costs are at least 68% of the replacement costs, the new replacement structure will provide a better value.
1/12/11: In EPG 136.4 Environmental and Cultural Requirements, a few links were updated and a link to Section 106 Survey Form was added.
1/7/11: In EPG 136.10.11 Bidder Qualification Language, the bid advertisement guidance was clarified.
1/7/11: In EPG 136.9.11 Plans, Specifications and Estimate (PS&E) Submittal, clarification about how many sets of plans the sponsor must submit.
1/7/11: In EPG 136.3.2 Highway Bridge Program (HBP) Project Selection, clarification about rehabilitation vs replacement. If the rehabilitation cost is at least 68% of the replacement costs, it can be assumed that replacing the structure will provide a better value than rehabilitation.
1/5/11: EPG 136.9.8 Work By Local Forces was clarified and a link was established to 23 CFR Subpart B, Section 635.201-205.
1/5/11: In EPG 136.6.4 Basis of Payment, guidance was updated on the retainage of Engineering Services Contracts.
12/16/10: In EPG 136.10, Fig. 136.10.1 Checklist for Bid Proposal was updated.
12/14/10: Additional guidance provided for progress invoices in the first paragraph of EPG 136.12.1 Progress Invoices.
12/1/10: Updated links to FHWA's Form 1273 in EPG 136.5 and EPG 136.11.18. In EPG 136.14.4, reworded the link to FHWA's Construction website. (Previously, it had been labeled as "Required Federal Aid Provisions".)
11/30/10: In EPG 136.6, Fig 136.6.1 Contract was updated to provide clear guidance to list subconsultants and the services they provide in the body of the contract.
11/12/10: In EPG 136.14.3.1, updated link to FHWA Form 1273.
11/12/10: EPG 136.10.8 was revised to bring it into compliance with federal obligation request verbiage.
10/14/10: In EPG 136.6, updated Fig 136.6.2 Consultant Selection Criteria.
10/5/10: In EPG 136.1.2.1 Procedures, the time allowed to bring an LPA project from allocation to award was shortened; EPG 136.6.2 was revised to ensure compliance with the Brooks Act, etc. since failure to comply with procedures may result in loss of funding; new retainage guidanace was added in EPG 136.9.9.5; and materials testing requirements in 136.11.9 Materials Testing were updated.
9/29/10: Updated District 3's Transportation Enhancements document in the Missouri map at EPG 136.14.1.1.
9/28/10: The former #18 (that allowed retainage) was removed to bring EPG 136.6.6 Contract Submittal into compliance with existing MoDOT policy. #19 was renumbered as #18.
9/28/10: In EPG 136.9.7 Estimates and EPG 136.10.11 Bidder Qualification Language, revised the listing of items to be subtotaled.