Difference between revisions of "Category:101 Standard Forms"

From Engineering_Policy_Guide
Jump to navigation Jump to search
Line 424: Line 424:
  
 
====SiteManager Quick Reference Guides (QRGs) [[image:bulldozer.jpg|20px]]====
 
====SiteManager Quick Reference Guides (QRGs) [[image:bulldozer.jpg|20px]]====
 
+
<div id="Change Order Codes"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_Codes.doc Change Order Codes]  
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_Codes.doc Change Order Codes]  
 
+
<div id="Change Order Reports"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_reports.docx Change Order Reports]
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_reports.docx Change Order Reports]
 
+
<div id="Change Orders - Zero Dollar"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_zero_dollar.docx Change Orders - Zero Dollar]
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_zero_dollar.docx Change Orders - Zero Dollar]
 
+
<div id="Change Orders"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders.docx Change Orders]
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders.docx Change Orders]
 
<div id="Change Orders – Mobilization and Contract Bond"></div>
 
<div id="Change Orders – Mobilization and Contract Bond"></div>
Line 436: Line 436:
 
<div id="Change Orders – Time Adjustment"></div>
 
<div id="Change Orders – Time Adjustment"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Time_Adjustment.docx Change Orders – Time Adjustment]
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Time_Adjustment.docx Change Orders – Time Adjustment]
 
+
<div id="Change Orders – Value Engineering"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Value_Engineering.doc Change Orders – Value Engineering]
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Value_Engineering.doc Change Orders – Value Engineering]
  
Line 444: Line 444:
  
 
:* [http://epg.modot.mo.gov/forms/CM/Concrete_mix_design_creation.doc Concrete Mix Design Creation]
 
:* [http://epg.modot.mo.gov/forms/CM/Concrete_mix_design_creation.doc Concrete Mix Design Creation]
 
+
<div id="Contract Adjustments"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Contract_Adjustments.docx Contract Adjustments]
 
:* [http://epg.modot.mo.gov/forms/CM/Contract_Adjustments.docx Contract Adjustments]
  
Line 450: Line 450:
  
 
:* [http://epg.modot.mo.gov/forms/CM/Contract_Finalization.doc Contract Finalization]
 
:* [http://epg.modot.mo.gov/forms/CM/Contract_Finalization.doc Contract Finalization]
 
+
<div id="Contractor Pay Estimates"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Contractor_Pay_Estimates.docx Contractor Pay Estimates]
 
:* [http://epg.modot.mo.gov/forms/CM/Contractor_Pay_Estimates.docx Contractor Pay Estimates]
  
Line 484: Line 484:
  
 
:* [[media:101 Land Disturbance Storm Water Database Closeout Procedure QRG.pdf|Land Disturbance Storm Water Database Closeout Procedure]]
 
:* [[media:101 Land Disturbance Storm Water Database Closeout Procedure QRG.pdf|Land Disturbance Storm Water Database Closeout Procedure]]
 
+
<div id="Line Item Adjustments"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Line_Item_Adjustments.docx Line Item Adjustments]  
 
:* [http://epg.modot.mo.gov/forms/CM/Line_Item_Adjustments.docx Line Item Adjustments]  
 
<div id="Liquidated Damage Adjustments"></div>
 
<div id="Liquidated Damage Adjustments"></div>
  
 
:* [http://epg.modot.mo.gov/forms/CM/Liquidated_Damage_Adjustments.docx Liquidated Damage Adjustments]  
 
:* [http://epg.modot.mo.gov/forms/CM/Liquidated_Damage_Adjustments.docx Liquidated Damage Adjustments]  
 
+
<div id="Milestones"></div>
 
:* [http://epg.modot.mo.gov/forms/CM/Milestones.docx Milestones]  
 
:* [http://epg.modot.mo.gov/forms/CM/Milestones.docx Milestones]  
 
<div id="Moving Files from SharePoint to CIA"></div>
 
<div id="Moving Files from SharePoint to CIA"></div>
Line 508: Line 508:
 
   
 
   
 
:* [http://epg.modot.mo.gov/forms/CM/Sampling_Checklist.docx Sampling Checklist]
 
:* [http://epg.modot.mo.gov/forms/CM/Sampling_Checklist.docx Sampling Checklist]
   
+
<div id="Stockpiled Materials"></div>  
 
:* [http://epg.modot.mo.gov/forms/CM/Stockpiled_Materials.doc Stockpiled Materials]
 
:* [http://epg.modot.mo.gov/forms/CM/Stockpiled_Materials.doc Stockpiled Materials]
  

Revision as of 10:13, 5 February 2019

EPG articles are not referenced as "sections" but as EPG XXX.X to avoid confusion with MoDOT specs (which are contractually binding).

Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.


Bridge

101 Bridge.jpg

Construction and Materials

Forms for Contractor Use

Construction and Contractor Related

Materials Related

Posters, Federal Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Posters, State Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Utility or Right of Way Related

Quick Reference Guides (QRGs)

AASHTOWare Project Quick Reference Guides (QRGs)

SiteManager Quick Reference Guides (QRGs) Bulldozer.jpg

Design

Microstation D-Sheets
Signing
D-28, D-29 through D-34
Signals
D-37A through D-37d, D-38 through D-38e
Typical Sections
D-49 through D-70
Miscellaneous
D-71

Bridge

Checklist

Computer

Contracts

Design Forms

Engineering Professional Services

Environmental and Cultural

Hearings

Materials

Photo

Planning

Right of Way

Scoping

101 survey.jpg

Survey

External Civil Rights

Financial Services

Maintenance

Chip Seal Forms

Bridge Maintenance

Snow & Ice Control

Rest Areas

Commuter Lots

Disasters

Performance Indicators

Pavement Management

Motor Carrier Services


Planning

Right of Way

General Information

Right of Way Organization and Personnel

Administration

Description Writing and Titles

Property Management

Appraisal and Appraisal Review

Negotiation

Relocation Assistance Program

Asbestos Abatement-Removal of Building Improvement

Right Of Way Condemnation

Mediation

Quality Assurance Reviews

Designing Right of Way Plans

Change in Route Status Report

Requests from Cities for Annexations

Outdoor Advertising

Junkyards

Local Public Agency Land Acquisition

101 bottom.jpg

This category currently contains no pages or media.