Difference between revisions of "Category:101 Standard Forms"
Jump to navigation
Jump to search
m (→Quick Reference Guides (QRGs): Per Env'l, moved storm water related QRGs under their own heading) |
|||
Line 494: | Line 494: | ||
:* [http://epg.modot.mo.gov/forms/CM/Key_Dates.docx Key Dates] | :* [http://epg.modot.mo.gov/forms/CM/Key_Dates.docx Key Dates] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<div id="Line Item Adjustments"></div> | <div id="Line Item Adjustments"></div> | ||
:* [http://epg.modot.mo.gov/forms/CM/Line_Item_Adjustments.docx Line Item Adjustments] | :* [http://epg.modot.mo.gov/forms/CM/Line_Item_Adjustments.docx Line Item Adjustments] | ||
Line 533: | Line 523: | ||
:* [[media:101 Storm Water Database Initial Setup QRG.pdf|Storm Water Database Initial Setup]] | :* [[media:101 Storm Water Database Initial Setup QRG.pdf|Storm Water Database Initial Setup]] | ||
− | |||
− | |||
:* [http://epg.modot.mo.gov/forms/CM/Subcontracts.docx Subcontracts] | :* [http://epg.modot.mo.gov/forms/CM/Subcontracts.docx Subcontracts] | ||
<div id="SuperPave Adjustments"></div> | <div id="SuperPave Adjustments"></div> | ||
Line 542: | Line 530: | ||
:* [http://epg.modot.mo.gov/forms/CM/Vendor_Master_List.doc Vendor Master List] | :* [http://epg.modot.mo.gov/forms/CM/Vendor_Master_List.doc Vendor Master List] | ||
+ | |||
+ | ====Storm Water Database Quick Reference Guides (QRGs)==== | ||
+ | |||
+ | :* [[media:101 Land Disturbance Deficiencies QRG 2019.pdf|Land Disturbance Deficiencies]] | ||
+ | |||
+ | :* [[media:101 Land Disturbance Storm Water Database Closeout Procedure QRG 2019.pdf|Land Disturbance Storm Water Database Closeout Procedure]] | ||
+ | |||
+ | :* [[media:101 Land Disturbance Storm Water Database Initial Setup for Construction Projects.pdf|Land Disturbance Storm Water Database Initial Setup for Construction Projects]] | ||
+ | |||
+ | :* [[media:101 Land Disturbance Storm Water Database Initial Setup for Maintenance Projects QRG.pdf|Land Disturbance Storm Water Database Initial Setup for Maintenance Projects]] | ||
+ | |||
+ | :* [[media:101 Land Disturbance Storm Water Database 7 Day Reviews QRG.pdf|Land Disturbance Storm Water Database 7-Day Reviews]] | ||
+ | |||
+ | :* [[media:101 Storm Water Land Disturbance Erosion Reporting QRG 2019.pdf|Storm Water Land Disturbance Erosion Reporting]] | ||
==Design== | ==Design== |
Revision as of 06:56, 11 July 2019
EPG articles are not referenced as "sections" but as EPG XXX.X to avoid confusion with MoDOT specs (which are contractually binding). |
Contents
- 1
- 2 Bridge
- 3 Construction and Materials
- 4 Design
- 5 External Civil Rights
- 6 Financial Services
- 7 Maintenance
- 8 Motor Carrier Services
- 9 Planning
- 10 Right of Way
- 10.1 General Information
- 10.2 Right of Way Organization and Personnel
- 10.3 Administration
- 10.4 Description Writing and Titles
- 10.5 Property Management
- 10.6 Appraisal and Appraisal Review
- 10.7 Negotiation
- 10.8 Relocation Assistance Program
- 10.9 Asbestos Abatement-Removal of Building Improvement
- 10.10 Right Of Way Condemnation
- 10.11 Mediation
- 10.12 Quality Assurance Reviews
- 10.13 Designing Right of Way Plans
- 10.14 Change in Route Status Report
- 10.15 Requests from Cities for Annexations
- 10.16 Outdoor Advertising
- 10.17 Junkyards
- 10.18 Local Public Agency Land Acquisition
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
AASHTOWare Project Quick Reference Guides (QRGs)
SiteManager Quick Reference Guides (QRGs)
Storm Water Database Quick Reference Guides (QRGs)
Design
Microstation D-Sheets |
Signing |
D-28, D-29 through D-34 |
Signals |
D-37A through D-37d, D-38 through D-38e |
Typical Sections |
D-49 through D-70 |
Miscellaneous |
D-71 |
Bridge
Checklist
Computer
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
External Civil Rights
Financial Services
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition
This category currently contains no pages or media.