Talk:903.18 Signing for School Areas

From Engineering_Policy_Guide
Revision as of 10:35, 3 April 2013 by Doubrb1 (talk | contribs) (New page: The mention of contracts for school signing needed is hidden at the end of the signing under a section that looks like it just talks about the addition of a plaque. Because these signs are...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The mention of contracts for school signing needed is hidden at the end of the signing under a section that looks like it just talks about the addition of a plaque. Because these signs are required to have contracts and crossing guards, I believe the information about contracts should be placed at or near the front, bolded, or in some other way stick out to grab your attention that contracts are in deed required before installation.