User contributions for Smithk
Jump to navigation
Jump to search
8 November 2011
- 13:0613:06, 8 November 2011 diff hist −27 m 133.4 Snow and Ice Control Operations →133.4.1 Route Classifications: Per Maintenance, "with AADT of at least 2500" dropped from description of Continuous Operations Map. Districts have flexibility in ID'ing these routes.
- 11:4511:45, 8 November 2011 diff hist −19 m Main Page EPG 751.13
- 10:2210:22, 8 November 2011 diff hist +257 m 751.6 General Quantities Per Bridge, links added
- 10:1610:16, 8 November 2011 diff hist +6 m 751.13 Expansion Joint Systems →751.13.1.1 General
- 10:1510:15, 8 November 2011 diff hist 0 N File:751.13.1.1 Expansion Length Diagram.jpg No edit summary current
- 10:1410:14, 8 November 2011 diff hist −4,601 m 751.13 Expansion Joint Systems Per Bridge, removed info and details of silicone expansion joint systems. Use of these systems is discontinued on future jobs; these systems are sensitive to how they are installed.
- 09:4409:44, 8 November 2011 diff hist −29 m 751.40 LFD Widening and Repair →751.40.3.1 Concrete Wearing Surface: Per Bridge, silicone expansion joint systems is discontinued on future jobs.
- 09:4209:42, 8 November 2011 diff hist −154 m 751.40 LFD Widening and Repair →751.40.2 Typical Sections of Concrete Repairs: Per Bridge, silicone expansion joint systems is discontinued on future jobs.
- 09:3509:35, 8 November 2011 diff hist −2,015 m 751.50 Standard Detailing Notes →H5. Expansion Devices: Per Bridge, silicone expansion joint systems is discontinued on future jobs. H5e notes removed.
- 09:3109:31, 8 November 2011 diff hist +136 m 771.11 Bridge Joint Sealing - Silicone Per Bridge, silicone expansion joint systems is discontinued on future jobs.
7 November 2011
- 15:4615:46, 7 November 2011 diff hist +7 m Main Page No edit summary
- 15:0115:01, 7 November 2011 diff hist +1,340 m 751.22 Prestressed Concrete I Girders →751.22.1.3 Typical Span Ranges: Per Bridge, clarification on the limitations of the span range charts.
- 14:4114:41, 7 November 2011 diff hist +43 m Main Page No edit summary
- 14:1414:14, 7 November 2011 diff hist 0 N File:Main Page 4 Nov 7, 2011.jpg No edit summary current
- 14:1314:13, 7 November 2011 diff hist 0 N File:Main Page 3 Nov 7, 2011.jpg No edit summary current
- 14:1314:13, 7 November 2011 diff hist 0 N File:Main Page 2 Nov 7, 2011.jpg No edit summary current
- 14:1214:12, 7 November 2011 diff hist −294 m Main Page new photos
- 11:0711:07, 7 November 2011 diff hist 0 N File:409 JSP Nov 7, 2011.docx No edit summary
- 11:0711:07, 7 November 2011 diff hist +1 m Category:409 Seal Coat Per Design/Bidding and Contract Services, Seal Coat Index JSP revised to allow the index to be used for any individual project > 50K sy or any number of projects in combination exceeding 50K sy.
- 10:0410:04, 7 November 2011 diff hist −372 m Main Page EPG 409
- 09:5209:52, 7 November 2011 diff hist 0 N File:409 JSP Nov 7, 2011.doc No edit summary current
- 09:5109:51, 7 November 2011 diff hist 0 m Category:409 Seal Coat Per Design/Bidding and Contract Services, the JSP has been updated.
4 November 2011
- 10:4110:41, 4 November 2011 diff hist 0 N File:Form 236.8.7.8(f) Nov 2011.pdf No edit summary
- 10:4010:40, 4 November 2011 diff hist +27 m 236.8 Relocation Assistance Program Per RW, Form 236.8.7.8 (f) updated.
- 08:2408:24, 4 November 2011 diff hist 0 N File:751.2.2.1 Live Load.jpg No edit summary current
- 08:2308:23, 4 November 2011 diff hist +792 m 751.2 Loads →751.2.2.1 Live Load: Per Bridge, updated article to match existing guidance on lane widths
- 08:2208:22, 4 November 2011 diff hist −277 m 751.10 General Superstructure →751.10.1.3 Loads: Per Bridge, updated article to match existing guidance on lane widths
3 November 2011
- 15:3915:39, 3 November 2011 diff hist +72 m Main Page EPG 751.34
- 15:2315:23, 3 November 2011 diff hist +48 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: minor clarification
- 15:0415:04, 3 November 2011 diff hist +825 m 751.31 Open Concrete Intermediate Bents →751.31.1 General: Per Bridge, added links
- 14:5514:55, 3 November 2011 diff hist +55 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent: Per Bridge, added link
- 14:4914:49, 3 November 2011 diff hist +18 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders
- 14:4814:48, 3 November 2011 diff hist 0 N File:751.34 plan of non-integral end bent (skewed).jpg No edit summary current
- 14:4714:47, 3 November 2011 diff hist 0 N File:751.34 plan of non-integral end bent (square).jpg No edit summary current
- 14:4614:46, 3 November 2011 diff hist 0 N File:751.34 part section at centerline.jpg No edit summary current
- 14:4614:46, 3 November 2011 diff hist +777 m 751.34 Concrete Pile Cap Non-Integral End Bents Per Bridge, some of EPG 751.34.3.2's diagrams updated to reference minimum support length
- 07:2907:29, 3 November 2011 diff hist +7 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types
- 07:1907:19, 3 November 2011 diff hist −1 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, removal of comma
2 November 2011
- 08:3508:35, 2 November 2011 diff hist +48 m 236.17 Junkyards Per RW, updated Outdoor Advertising Area Map
- 08:3308:33, 2 November 2011 diff hist 0 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 08:3308:33, 2 November 2011 diff hist 0 N File:236.16.2 Outdoor Advertising Area Map Oct 2011.jpg No edit summary current
- 08:3208:32, 2 November 2011 diff hist +57 m 236.16 Outdoor Advertising Per RW, updated Outdoor Advertising Area Map
- 08:1908:19, 2 November 2011 diff hist −877 m 127.13 Noise Per Environmental, "Common Noise Environment" definition removed. Also, MoDOT no longer allows cost averaging.
- 08:1108:11, 2 November 2011 diff hist 0 N File:Main Page Nov 2, 2011.jpg No edit summary current
- 08:1008:10, 2 November 2011 diff hist +335 m Main Page new photo
1 November 2011
- 13:1513:15, 1 November 2011 diff hist −29 m Main Page EPG 144 and EPG 133.4
- 13:0113:01, 1 November 2011 diff hist +62 m 133.4 Snow and Ice Control Operations →133.4.1 Route Classifications: added link
- 12:5312:53, 1 November 2011 diff hist −83 m 133.4 Snow and Ice Control Operations →133.4.1 Route Classifications: Per Maintenance, maps of Continuous Operations Routes updated.
- 12:5012:50, 1 November 2011 diff hist +18 m Category:144 Practical Operations No edit summary
- 12:4912:49, 1 November 2011 diff hist 0 N File:144.1 se.pdf No edit summary current