This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

106.5 Storage of Materials

From Engineering_Policy_Guide
Jump to navigation Jump to search

It is the responsibility of the contractor to ensure materials are stored properly and that the quality of the stored material is preserved. It is also the responsibility of the contractor to ensure that materials are stored in such a manner to facilitate materials inspection.