Difference between revisions of "Main Page"
m (EPG 129.12) |
m (EPG 153.1.3.3) |
||
Line 68: | Line 68: | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''[[153.1.3.3 Agreements Written By Other Entities|EPG 153.1.3.3 Agreements Written By Other Entities]]''' | ||
+ | |||
+ | 2/5/18: This new guidance addresses Agreements initiated by other entities that are not initiated in eAgreements. The agreement template is initiated by the other entity, executed by the Commission and then uploaded into eAgreements Record center. | ||
+ | |||
'''[[:Category:129 Public Involvement#129.12 Presentation for Location or Design Approval to the Commission|EPG 129.12 Presentation for Location or Design Approval to the Commission]]''' | '''[[:Category:129 Public Involvement#129.12 Presentation for Location or Design Approval to the Commission|EPG 129.12 Presentation for Location or Design Approval to the Commission]]''' | ||
Line 168: | Line 172: | ||
9/27/17: In [[616.14 Work Zone Safety and Mobility Policy#616.14.8 Significant Projects|EPG 616.14.8 Significant Projects]], the criteria of "significant project" was revised. The requirements for TCP were revised in [[616.14 Work Zone Safety and Mobility Policy#616.14.10 Work Zone Transportation Management Plan|EPG 616.14.10 Work Zone Transportation Management Plan]]. | 9/27/17: In [[616.14 Work Zone Safety and Mobility Policy#616.14.8 Significant Projects|EPG 616.14.8 Significant Projects]], the criteria of "significant project" was revised. The requirements for TCP were revised in [[616.14 Work Zone Safety and Mobility Policy#616.14.10 Work Zone Transportation Management Plan|EPG 616.14.10 Work Zone Transportation Management Plan]]. | ||
− | |||
− | |||
− | |||
− |
Revision as of 08:38, 5 February 2018
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | ||||||||||||||||||||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 153.1.3.3 Agreements Written By Other Entities 2/5/18: This new guidance addresses Agreements initiated by other entities that are not initiated in eAgreements. The agreement template is initiated by the other entity, executed by the Commission and then uploaded into eAgreements Record center. EPG 129.12 Presentation for Location or Design Approval to the Commission 2/2/18: Clarified the requirements for location and design approval, which is required even if an LPA is administering and paying for the improvement. EPG Other Aspects of Pavement Design, Minor Roads 2/2/18: Clarification about pavement thicknesses/types sometimes not included on typical sections. EPG 616.6.89 Radar Speed Advisory Assembly 2/2/18: Expanded and updated guidance on the placement of the Radar Speed Advisory Assembly. Also slightly updated Work Zone Questions for the Core Team in EPG 616.14 Work Zone Safety and Mobility Policy. Clear Zones for 1R and 2R Projects 2/1/18: In EPG 128.2 Preventive Maintenance Projects (1R and 2R) and EPG 231.2 Clear Zones, the guidance regarding clear zones and roadside hardware for 1R and 2R projects was condensed and clarified. EPG 131.1.4 The Design Exception Process 1/26/18: Design Exceptions are to be stored electronically in eProjects after Central Office Design and/or Bridge divisions have reviewed and approved. EPG 106.3.2.87, No-Pick-Up Time for Tack Coats 1/18/18: This new TM is now available. Asphalt Cement Price Index Adjustments 1/18/18: "Guidance for Asphalt Cement Price Index Adjustments" has been updated to include info about contingent item work. The document is located in various articles including EPG 402.1.1 Plan Preparation and EPG 403 Asphaltic Concrete Pavement. Right of Way Acquisition Authority and Project Funding 1/17/18: To align with current CFR regulations, guidance in EPG 236.3.4.2 Limited Acquisition Authority and Project Funding and EPG 236.3.4.3 Acquisition Authority and Project Funding updated what RW activities can be coded to the PE number prior to receiving FHWA's "A" date approval. 1/10/18: The latest version of the Engineering Factors Report, providing SFY 2015 to SFY 2017 info, is now presented in EPG 104.7 Estimates. Fig. 104.7, Cost Estimate Guide for Rural Preliminary Design 12/18/17: A few bridge structure entries in this document have been revised. 12/15/17: Guidance for QA measures to assure compliance with wage rate reviews was expanded. EPG 751.5.1.3 Grammar and Punctuation 11/13/17: The capitalization rules were updated and two additions were added to the nomenclature. Design Exception Process 11/6/17: In EPG 131.1.4, was updated to show that CO Design does not need to file a copy of every approved design exception. These should simply be stored in eProjects. Also, the formal submittal letter is no longer needed. Project context can be provided directly on the design exception form. 11/3/17: New EPG 127.13.12 provides guidance for developing a sound study and report. Other revisions to EPG 127.13 Noise clarify and expand definitions and the analysis of traffic noise impacts and mitigation. Valley Section Locations 11/3/17: EPG 238.3.36 Bridge Surveys was updated to reflect changes in responsibility. In EPG 747.1 Bridge Survey Location Request and EPG 750.3.1.1 Survey Locations, guidance for district submittal of request for valley section locations was expanded. Discharging into a MSE Wall Backfill 11/3/17: In EPG 747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems, EPG 751.1 Preliminary Design, EPG 751.10.3 Bridge Deck Drainage - Slab Drains and EPG 751.24.2.1 Design, guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area was revised. EPG 751.40.1.2 Steel HP Pile Maintenance and Repair 11/3/17: New EPG 751.40.1.2 Steel HP Pile Maintenance and Repair presents guidelines to be used by Bridge maintenance or district maintenance to maintain or repair existing steel HP piles. Sealed Joint Design 10/27/17: Much of EPG 751.13 Expansion Devices was revised to reflect the improved design and details for both Preformed Compression and Strip Seal Expansion Joint Systems. New designs and details for Preformed Silicon or EPDM Seal Expansion Joint Systems were also issued. Numerous standard detail notes were revised or added in EPG 751.50 H5c, H5d and H5e. Required Number of Strands 10/13/17: In EPG 751.22.1.1 Material Properties and EPG 751.23.1.1 Material Properties, guidance was expanded for reporting on the girder plans the required number of strands by design and the total initial prestress force. EPG 236.5.25.6 Security Assessment for Leased Areas Over or Under Highway Structures 10/11/17: A table was added to clarify policies for storing items under bridges. Licensing of Junkyard 10/11/17: The junkyard expiration date was updated in EPG 236.17.4.2 Issuing a New License and EPG 236.17.5 Junkyard Renewal to match the statutes. EPG 237.13.2 Electronic Design Data 10/10/17: The list of electronic design data files generated from GEOPAK for Roadway Contract Plans was updated. End of Slab Guidance 9/29/17: In EPG 751.10.1.10 Slab Offsets for Curved Bridges and EPG 751.10.1.16 Plan of Slab Details, guidance was clarified about how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents. In EPG 751.6.2.10 Bridge Slabs and Note B3.21, guidance about how to estimate slab quantities when expansion joint systems are present was clarified. EPG 751.5.1.4 Contract Addendums and Construction Changes 9/28/17: Guidance for change orders to bridge plans was clarified. Work Zone Transportation Management Plan 9/27/17: In EPG 616.14.8 Significant Projects, the criteria of "significant project" was revised. The requirements for TCP were revised in EPG 616.14.10 Work Zone Transportation Management Plan. |