This is the Engineering Policy Guide Test Site. To view the current EPG click here

Difference between revisions of "Recent Policy Changes in the EPG"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 616.6.89)
m
Line 4: Line 4:
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.89 Radar Speed Advisory System (RSAS)|EPG 616.6.89 Radar Speed Advisory System (RSAS)]]'''
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.89 Radar Speed Advisory System (RSAS)|EPG 616.6.89 Radar Speed Advisory System (RSAS)]]'''
  
7/21/21: A link to the new non-standard JSP, [https://spexternal.modot.mo.gov/sites/de/JSP/NJSP2106.docx?d=wec3fa9082eb645edbb9e979c1049b745 NJSP 21-06 Radar Speed Advisory System], is now available.
+
7/21/21: A link to the new nonstandard JSP, [https://spexternal.modot.mo.gov/sites/de/JSP/NJSP2106.docx?d=wec3fa9082eb645edbb9e979c1049b745 NJSP 21-06 Radar Speed Advisory System], is now available.
  
 
'''[[903.4 Overhead Sign Mounting#903.4.8 Bridge-Mounted Signs|EPG 903.4.8 Bridge-Mounted Signs]] and [[903.4 Overhead Sign Mounting#903.4.9 Bridge-Mounted Structure Designs|EPG 903.4.9 Bridge-Mounted Structure Designs]]'''
 
'''[[903.4 Overhead Sign Mounting#903.4.8 Bridge-Mounted Signs|EPG 903.4.8 Bridge-Mounted Signs]] and [[903.4 Overhead Sign Mounting#903.4.9 Bridge-Mounted Structure Designs|EPG 903.4.9 Bridge-Mounted Structure Designs]]'''

Revision as of 12:26, 21 July 2021

EPG 616.6.89 Radar Speed Advisory System (RSAS)

7/21/21: A link to the new nonstandard JSP, NJSP 21-06 Radar Speed Advisory System, is now available.

EPG 903.4.8 Bridge-Mounted Signs and EPG 903.4.9 Bridge-Mounted Structure Designs

7/21/21: Guidance for handling bridge sign attachments was expanded and updated to current established practice.

EPG 903.7.49 Community Wayfinding Signs

7/16/21: As a convenience to cities, a simplified document, Key Wayfinding Requirements, is now available.

EPG 236.4.7.2 Quitclaim Deed (to the Commission)

7/15/21: Guidance about the determination and documentation of when tenant interest must be released has been expanded and clarified.

Material Supplier CUF Frequency

7/15/21: In EPG 146.3.2.3 Commercially Useful Function (CUF), updated guidance about material supplier CUF frequency to every 30 days, regardless of DBE activity.

King MASH Composite Block

7/1/21: MoDOT has recently approved a new, MASH-tested composite block for guardrail.

System I Structural Steel Coating

6/30/21: In EPG 751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel), guidance about System I finish field coat was clarified. In EPG 751.50 Standard Detailing Notes, additional options for System I structural steel protective coatings were provided.

EPG 146 Disadvantaged Business Enterprise (DBE)

6/23/21: Guidance for project bid proposals that include DBE goals has been clarified and expanded.

EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts

6/16/21: Guidance for barrier and railing options on existing bridges has been simplified.

EPG 109.10 Contract Assignment Process - Contract Reassignment to a New Contractor

6/15/21: Expanded guidance is now available about how to assign a contract.

EPG 616.8.1 Listing of Typical Applications

6/11/21: For greater convenience, a new "effective date" column has been added for each TA in these tables.

Prestressed Girders and Beams

6/10/21: In EPG 751.10.1.14 Girder and Beam Haunch Reinforcement, EPG 751.21.3 Details, EPG 751.22.1.2 Geometric Dimensions, EPG 751.22.2.4 Shear, EPG 751.22.3.2 MoDOT Standard Girder Strand Arrangements, EPG 751.22.3.3 NU Standard Girders, EPG 751.22.3.4.2 Shear Reinforcement, EPG 751.22.3.4.3 Anchorage Zone Reinforcement, and EPG 751.50 Standard Detailing Notes, guidance about end section reinforcement for NU girders was revised as was guidance on specifying debonding regions. The requirement for a lifting loop detail was removed as was the reference to the 5-inch projection of WWR. Notes were also revised or removed in accordance with spec book revisions.

EPG 201.2.5.1 Open Burning

6/10/21: Guidance about open burning has been expanded.

EPG 616.18, Relocation of Service Signs (Supplemental Guide Sign Program Signs) on Construction Projects

6/7/21: Guidance has been updated with current practices and terminology.

EPG 107.4 Safety and Sanitary Provisions

5/25/21: New guidance is available to clarify hard hat safety policy.

CLC Contractor pdf Files and Contract Seal Coat pdf Plan Sheets

5/25/21: The Contract Leveling Course (CLC) contractor pdf files and Contract Seal Coat pdf plan sheets, in EPG 402 Bituminous Surface Leveling and EPG 409 Seal Coat, respectively, were updated. Several revisions involved safety edge, flag assemblies and rumble strip spacing for CLC projects and flag assemblies for seal coat projects.

EPG 153.6 Chief Counsel's Office

5/18/21: Guidance is now available for two new Amended Attorney Services Agreement contracts (CC11 and CC12).

Commercially Useful Function (CUF) Determination Form

5/10/212: The CUF Determination Form, discussed in EPG 146.3 Commercially Useful Function Verifications, has been revised with more open ended questions that assist in determining whether a DBE is performing a Commercially Useful Function. The form now includes a field observation section for inspectors to note what they saw in the field.

EPG 237.2 Title Sheet

4/30/21: Guidance about multiple title pages has been provided.

EPG 606.1.3.2.1 Crashworthy End Terminals with Curb

4/29/21: New guidance is available for crashworthy end terminals that are being installed in the vicinity of curb. Curb has not been tested with a CET and this guidance will help address questions and concerns about this.

AWP CO Commercially Useful Function (CUF) Review Date Entry

4/29/21: For the convenience of readers, AWP QRG CUF Review Date Entry information has been added to EPG 101, AASHTOWare Project Quick Reference Guides (QRGs).

Right of Way Timeline

4/26/21: Presented in EPG 236 Right of Way, this timeline provides the sequence of activities required to acquire property rights needed for projects.

EPG 102.2.8 Performance Rating Privacy, EPG 102.2.9 Contractor Referrals and EPG 102.2.10 Contractor Endorsements

4/23/21: New clarification about when contractor ratings can be shared and when references can be made is now available.

EPG 134.5.1.1 Workforce Diversity Verification

4/8/21: Guidance for Fig. 134.5.1.1, Blank Consultant Invoice has been updated from the life of the contract to life of the invoicing period.

EPG 751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts

4/6/21: In the Thrie Beam notes of the Common Bridge Barrier and Railing (for Rehabilitations) table, guidance has been updated to restrict the use of MGS approach rail with non-blocked thrie beam bridge rail.