Main Page
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | ||||||||||||||||||||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
Outdoor Advertising 3/16/17: in EPG 236.16.9.1 Substantially Rebuilt Conforming Out of Standard Outdoor Advertising and EPG 236.16.9.2 Deteriorated or Damaged Nonconforming Outdoor Advertising, the process for sending ODA courtesy letter was revised. EPG 903.18.4 Object Markers for Obstructions Adjacent to the Roadway 3/16/17: Object Marker usage policy was clarified, including new figures showing standard installation details. EPG 751.22.2.2 Prestressing Strands; Strand Arrangement Optimizing 3/8/17: New guidance for aligning NU top flange, straight and harped prestressing strands, when possible, in NU prestressed girders to aid in fabricating flange blockouts. Bridge Memo and Design Layout Requirements 3/8/17: Guidance in EPG 751.1.2.18.2 Content and EPG 751.1.2.31 Finishing Up Design Layout for bridge approach slabs requirements for Bridge Memo and the Design Layout was expanded and clarified. Galvanized Steel Pipes 3/7/17: Guidance in several articles, including EPG 751.1.2.20 Substructure Type , EPG 751.32.3 Details, EPG 751.36.2 Steel Pile and EPG 751.50 Standard Detailing Notes E.2, has been updated to require all steel pile (HP, Closed end CIP, Opened end CIP) to be galvanized. EPG 821 Herbicides and Roadsides 2/23/17: Guidance for products has been updated for 2017. Cost Estimate Guide for Rural Preliminary Design 2/21/17: In EPG 104.7 Estimates, the Cost Estimate Guide for rural preliminary design was updated. EPG 236.7.4.5 Subordination of Mortgage Liens 2/17/17: Guidance about the Partial Deed of Release has been updated to reflect current practices. Epoxy Coated Reinforcing 2/15/17: Guidance in EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements has expanded the use of epoxy coated reinforcement in bridge structures. Traffic Signal Maintenance 2/15/17: Signal-related preventive maintenance and inspection process guidance in EPG 902.4.2.1 Controller and Cabinet Replacement Program and EPG 902.5.8.3 Signal Maintenance was updated. 2/15/17: New and updated guidance provides permit requirements. Also, new EPG 129.13 Public Involvement for Stormwater guidance describes the public involvement process that allows input on new permits. 2/15/17: New guidance implements the Work Zone No Phone Zone signs. TA-50 was also updated. 2/10/17: Guidance about deflection fitting and expansion fitting requirements was clarified. EPG 751.40.2.3 Substructure Repair 2/9/17: Guidance for formed and unformed repair areas was clarified. Links to Maintenance Agreements 2/3/17: Several articles, such as EPG 171.1.1 Agreements, that have links to Maintenance Agreements, were updated due to the new eAgreements SharePoint site. EPG 616.6.87 Temporary Rumble Strips 1/17/17: Guidance has been updated and expanded. EPG 171.2, B&G(D2) Weigh Station Obligations 1/11/17: Due to a new MOU with MSHP, snow and ice removal will be performed for all paved surfaces immediately adjacent to weigh station facilities. EPG 134.1.3 Consultant Qualification 1/4/17: Guidance has been clarified that a firm is not required to submit a certificate of authority to become prequalified when the firm does work outside the jurisdiction of the MO Board for APEPLSPLA. 1/4/17: The Bridge Seismic Design Process Flowchart has been revised. EPG 751.40.2.3 Substructure Repair 12/6/16: General guidance was added for rehabilitating existing bent cap using fiber reinforced polymer reinforcement for shear strengthening. EPG 460.3.13 Asphalt Binder Sampling 12/5/16: New guidance for submission of initial daily binder sample will ensure timely testing. Right of Way Acquisition Authority 12/5/16: New guidance for federally funded early acquisition of a parcel is now available in EPG 236.3.4.4 Advance Acquisition - Hardship and Protective Buying. Form Liner Requirements for Large Block Wall 12/5/16: Guidance in EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems and EPG 751.24.2 Mechanically Stabilized Earth (MSE) Walls was clarified for form liner requirements for large block walls. Standard Detailing Note J1.20a 11/22/16: The shop drawing requirements in this note were clarified. Hairpin Bars 11/22/16: Hairpin guidance in EPG 751.10.1.14 Girder Haunch Reinforcement was expanded and clarified, especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel. |