751.33 Concrete Semi Deep Abutments

From Engineering_Policy_Guide
Jump to navigation Jump to search

751.33.1 General

751.33.1.1 Material Properties

Concrete
Class B Concrete (Substructure) = 3.0 ksi
  = 10 ksi
Class B-2 Concrete (Abutment Slab) = 4.0 ksi
  = 8 ksi

Modulus of elasticity,

Where:

f'c in ksi
wc = unit weight of nonreinforced concrete = 0.145 kcf
K1 = correction factor for source of aggregate
= 1.0 unless determined by physical testing

Modulus of rupture,

      LRFD 5.4.2.6

Where:

f'c is in ksi


Reinforcing Steel
Minimum yield strength, = 60.0 ksi
Steel modulus of elasticity, = 29000 ksi

751.33.2 Design

751.33.2.1 Limit States and Factors

In general, each component shall satisfy the following equation:

Where:

= Total factored force effect
= Force effect
= Load modifier
= Load factor
= Resistance factor
= Nominal resistance
= Factored resistance


Limit States

The following limit states shall be considered for abutment design:

STRENGTH – I
STRENGTH – III
STRENGTH – IV
STRENGTH – V
SERVICE – I
FATIGUE
EXTREME EVENT - II

See LRFD Table 3.4.1-1 and LRFD 3.4.2 for Loads and Load Factors applied at each given limit state.


Resistance factors

STRENGTH limit states, see LRFD 6.5.4.2 and LRFD 5.5.4.2
For all other limit states, = 1.00


Load Modifiers

751.33.2.2 Distribution of Loads

Dead Loads

Loads from stringers/girders shall be applied as concentrated loads at the intersection of the centerline of stringer/girder and the centerline of the bearing.

Loads from abutment components (abutment slab, barrier or railing, wings, apron, curtain wall, etc.) shall be applied to the bearing beam and transverse approach beam respectively as uniform distributed loads for the computation of pile loads and reinforcement.


Live Loads

Loads from stringers/girders shall be applied as concentrated loads at the intersection of the centerline of stringer/girder and the centerline of the bearing. Loads from the Abutment Slab shall be applied to the Transverse Approach Beam as a uniform distributed load for the computation of pile loads and reinforcement. No Live load shall be distributed through the Abutment Slab to the Bearing Beam for computations of pile loads or reinforcement


Wind, Temperature, Frictional Loads

These loads shall be disregarded, except for special cases or if specified by the Structural Project Manager, or on the Design Layout Sheet.


Earth Pressure Loads

Earth pressure loads are applied to the apron wall and part of the wing wall that extends past the transverse approach beam respectively. All tables have these forces already incorporated. For all special designs, these forces shall be applied appropriately.


File:751.33 distribution of loads-elevaton.gif

(*) Or compute using the angle, when it is given

Note: Do not use earth pressure on the front faces.

Elevation

751.33.2.3 Design Assumptions

Abutment Slab

Assume a uniform 3” wearing surface load. Assume slab to be acting one-way parallel with roadway.


Bearing Beam

The beam is assumed continuous over supports at centerline of piles. Live loads are applied to the superstructure only. Live loads are not simultaneously applied to the abutment slab.


Transverse Approach Beam

The beam is assumed continuous over supports at centerline of piles. The beam is assumed to carry half of the dead load of the approach slab. Live loads are applied to the abutment slab only. Live loads are not simultaneously applied to the approach slab.


Apron Wall

Assume apron wall to be cantilevered off of bearing beam with no support from battered piles. Use an equivalent fluid pressure of 45 pcf.


Wing Wall

Assume wing wall to be cantilevered at the fill face side of the transverse approach beam.

Assume 1’-0” of soil braces wing wall bottom at short end of wall.

Use an equivalent fluid pressure of 45 pcf.

Include a collision impact load applied to the barrier or railing transferred to the wing.

Assume LL surcharge lateral load of 90 pcf.


Piles

Stresses in the piles due to bending need not be considered in design calculations, except for seismic design.

751.33.2.4 Design Process

There are many ways to go about designing a Semi-Deep Abutment. Below is one process, which will work for most standard abutments. A majority of the steps are interchangeable, and can be switched to meet the designers’ preference.

Design geometry of abutment
Calculate the size and number of piles required for the bearing beam
Determine the bearing beam reinforcement
Calculate the size and number of piles required for the transverse beam
Determine the other abutment components reinforcement

751.33.3 Geometry

Use the standard illustrations in this section, information from your superstructure calculations, and the design layout sheet to design the geometry of the abutment.


751.33.3.1 Wing Elevation

File:751.33 geometry-wing elevation.gif
Wing Elevation


File:751.33 circled 1.gif Top of curtain wall to be 2” below the slab of the adjoining span.
File:751.33 circled 2.gif An access door shall be used only when called for on the Design Layout Sheet (based on utility need or removal of form need).
File:751.33 circled 3.gif It may be necessary to increase Abutment Length so end of wing extends beyond the intersection of the ground line and top of slab at the outside edge of wing.
File:751.33 circled 4.gif Working points shall include elevations at grade for the bridge.
File:751.33 circled 5.gif Slope Transverse Beam both top and bottom when the Abutment Slab haunch exceeds 6” (at gutter line).

751.33.3.2 Cross-Section

File:751.33 geometry-cross section.gif
Cross-Section


File:751.33 circled 1.gif Check the profile sheet with Design Layout for the slope of finish ground line.
File:751.33 circled 2.gif Check the clearance of anchor bolt wells; increase beam depth if needed.
File:751.33 circled 3.gif If length is greater than 15’-0”, Apron wall reinforcement shall be designed.
File:751.33 circled 4.gif Abutment Slab Depth + 1/2” (Min.)
File:751.33 circled 5.gif 12” (Min.) at gutter line to the top of the Transverse Approach Beam, except when the Abutment Slab depth is 12” or greater, then place the top of the Transverse Approach Beam 1/2” below the bottom of the slab.
(*) Provide a minimum of 8" cl. from outside edge of pile to face of beam.

751.33.3.3 Plan View

File:751.33 geometry-plan view.gif
Square Structures Skewed Structures
Plan View

751.33.3.4 Front Elevation

File:751.33 geometry-front elevation.gif
Front Elevation


File:751.33 circled 1.gif Slope toe of Apron Wall when the ends of the walls differ in elevations by more than 2’-0”. (or when beam is sloped)
File:751.33 circled 2.gif Slope top of backwall when the slab haunch exceeds 6” (at gutter line).

751.33.3.5 Pile Location

File:751.33 geometry-pile location2.gif
Pile Location


File:751.33 circled 1.gif 21” (Min.), 2’-0” (Max).
File:751.33 circled 2.gif 30” or 2.5 x pile diameter (Min.), 12’-0” (Max.) spacing, 1” increments.
(*) Provide a minimum of 8" cl. from outside edge of pile to face of beam.

751.33.4 Reinforcement

751.33.4.1 Front Elevation

File:751.33 reinforcement-front elevation1.gif
Front Elevation


See Table below for reinforcement not shown.

All transverse steel to be placed parallel to the backwall. All main steel to be placed parallel to the centerline of roadway.

Epoxy coat all reinforcing in abutment slab, bearing beam, curtain wall, apron wall, backwall, and transverse approach beam.

When expansion devise is present use details of protective coating and sloping top of beam to drain.

(*) If height of Equivalent Fluid Pressure A is greater than 5 ft. or if apron wall extends more than 15 ft. below bearing beam, reinforcement will need to be verified.

751.33.4.2 Wing Elevation

File:751.33 reinforcement-wing elevation.gif
Wing Elevation


File:751.33 circled 1.gif Varies (12” Max.)
File:751.33 circled 2.gif #4 Bars at 12” cts. (Each face)
File:751.33 circled 3.gif #5 Bars at 12” cts. (Each face)
File:751.33 circled 4.gif 12” (Min.) (Development length)
File:751.33 circled 5.gif #6 Bars at 8” cts. (Each face)
File:751.33 circled 6.gif For details of K bars, see EPG 751.12.1.4.3 End of Barrier Reinforcement for Type B barrier and EPG 751.12.1.3.3 End of Barrier Reinforcement for Type D and H barriers.
File:751.33 circled 7.gif If end of wing wall is greater than 5’-0” deep, reinforcement will need to be verified.

751.33.4.3 Cross-Section

File:751.33 reinforcement-cross section1.gif
Cross Section


  See Table below for reinforcement.
File:751.33 circled 1.gif 2 1/2" Cl. (To clear the const. joint key).
File:751.33 circled 2.gif #4 @ 12" cts. (Max).


Reinforcement
Abutment
Slab Design
Lengths (*)
Uniform
Abutment
Slab
Thickness
Axle
Vehicle
Live Load
(***)
Abutment
Slab Bottom
Steel
Parallel to
C.L. Rdwy.
Abutment
Slab Top
Steel Each
Way
Transverse Approach Beam Reinforcement
(Top & Bot.) (****)
Pile Spacing
7' 8' 9' 10' 11' 12'
10'-0" 11" 40.00 k #8 at 9" cts. #4 at 18" cts. 4-#6 4-#6 4-#6 4-#6 4-#7 4-#8
15'-0" 12" 43.33 k #8 at 8" cts. #4 at 12" cts. 4-#6 4-#6 4-#6 4-#7 4-#7 4-#8
20'-0" 15" 45.00 k #8 at 7" cts. #4 at 12" cts. 4-#6 4-#6 4-#7 4-#7 4-#8 4-#8
25'-0" 17" 46.08 k #8 at 5" cts. #4 at 12" cts. 4-#6 4-#6 4-#7 4-#7 4-#8 6-#8
30'-0" 20" 49.60 k #9 at 6" cts. #5 at 12" cts. 4-#6 4-#7 4-#7 4-#8 6-#8 6-#8
35'-0" 22" 52.80 k #9 at 5" cts. #5 at 12" cts. 4-#6 4-#7 4-#8 4-#8 6-#8 6-#8
Transverse Approach Beam Stirrup Size #4 #4 #5 #5 #6 #6


(*) Abutment slab design length is measured from the center of the backwall to the center of the approach beam along the centerline of roadway.

(**) For abutment slabs with lengths greater than 35’-0”, an intermediate bent is required inside the semi-deep abutment. Top and bottom reinforcement for these slabs shall be designed by the designer.

(***) Use the axle vehicle live load for calculating pile loads for the transverse approach beam.

(****) 4-#9’s can be used in lieu of 6-#8’s if spacing restrictions require fewer bars.

751.33.4.4 Plan View

File:751.33 reinforcement-section at upper construction joint.gif
Section at Upper Construction Joint


File:751.33 reinforcement-plan of bearing beam below lower keyed construction joint.gif
Plan of Bearing Beam below Lower Keyed Construction Joint


  See table above for reinforcement not shown.
File:751.33 circled 1.gif Use 3” (min.) and 6” (max.) (Typ.).
File:751.33 circled 2.gif See EPG 751.33.4.5
File:751.33 circled 3.gif Varies (12” max.)
File:751.33 circled 4.gif Stirrup to be centered over pile (Typ.).
File:751.33 circled 5.gif If nominal pile capacity is greater than 110 tons, stirrup size and spacing needs to be verified.

751.33.4.5 Bearing Beam

File:751.33 reinforcement-basic assumption (continuous beam).gif
Basic Assumption (Continuous Beam)


=
= Superstructure Loads (Applied through beam seat)
= Uniform DL (Abutment Components)
= Pile Spacing (ft.)






Min. Reinforcement: File:751.33 reinforcement-section thru beam.gif
 
Crack Control Parameters:


See LRFD 5.7.3.4 for variable definitions.

751.33.4.6 Pile Haunches

File:751.33 reinforcement-part section thru bearing beam.gif
Part Section Thru Bearing Beam
(*) Provide appropriate notes for steel H pile and steel pile shells.


File:751.33 reinforcement-plan of bearing beam below lower construction joint.gif
Plan of Bearing Beam below lower construction joint
(Showing typical dimensions for different pile types)

751.33.5 Details

751.33.5.1 Front Sheet

Figure shown below is an example of the information to be included on the abutment plan view on the first sheet of the plans.

File:751.33 details-plan view.gif
Plan View


Details for unsymmetrical roadways will require dimensions tying centerline of roadway to centerline of structure. (Pile coordinates shall be to centerline of roadway)

751.33.5.2 Ground line within Abutments

Figure shown below shall be detailed on the first or second sheet of the plans.


File:751.33 details-ground line and piling in abutments.gif
Ground Line and Piling in Abutments

751.33.5.3 Construction Joints

File:751.33 details-construction joints1.gif

(*) When the total length of beam and backwall exceeds 60'-0", use keyed construction joint at or near centerline Abutment as shown, perferably located at a 1/4 point between piles

File:751.33 details-construction joints2.gif
Construction Joints

751.33.5.4 Access Door

File:751.33 details-access door elevation.gif
Door Elevation


Cost of the door is to be included in other items.
Cut or bend reinforcing steel in the field to clear the opening for the access door.


File:751.33 details-access door section a-a.gif