Main Page
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
11/9/16: The Land Disturbance QRG was replaced with three new Land Disturbance QRGs. EPG 236.6.2 Scope of Assignment 11/9/16: Guidance was updated to reflect current practices. "Scope of Assignment for Simple Assignment or Experienced Staff and Fee" was removed. 11/8/16: Guidance for handling drawings from suppliers was expanded. EPG 643.2.16.1 Buy America Guidelines for Utilities 11/1/16: Guidance has reverted to the previous, more relaxed, FHWA interpretation of Buy America. Title Datum and Allied Services 11/1/16: Guidance in EPG 236.4.4.5 Agreements Between Commission and Abstractor or Title Companies and EPG 236.4.4.7 Procedure for Obtaining Title Services updated the agreements between Commission and abstractor or title companies to be current with business practices. EPG 616.16 Law Enforcement Services 11/1/16: Guidance provided for incorporating law enforcement into contractor projects and maintenance operation work zones. EPG 153 Agreements and Contracts 10/26/16: Guidance has been updated due to implementation of eAgreements. EPG 751.50, H3. Bearings and I1.51 10/25/16: Notes H3.29.1, H3.49.1 and I1.51 were revised. EPG 236.5.21.5 Full Disclosure Clause 9/29/16: The full disclosure clause was updated to reflect how MoDOT currently handles property conveyances. EPG 751.5.1.4 Contract Addendums and Construction Changes 9/29/16: Guidance for change orders to bridge plans has been revised. 9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified. Value Engineering 9/23/16: EPG 130.1 Discussion was updated to reflect the tracker identified goal. A new workbook is available for a district-led Value Analysis. Preliminary Design of a Bridge 9/23/16: EPG 751.1.1 Overview has been updated to reflect current practice. EPG 751.10.1.11 Slab Elevations 9/23/16: Guidance is now coordinated with MicroStation cells. EPG 237.2.8 Utility Information Note 9/23/16: The note required to be placed on the title sheet has been expanded. EPG 109.1 Measurement of Quantities 9/22/16: Guidance about measuring quantities was clarified. EPG 903.2.12 Quantity Computations and EPG 903.3 Post-Mounted Signing 9/15/16: Revisions have brought these articles' guidance into conformance with various recent standard plan and policy changes. EPG 110.3 Prevailing Wages and Records 9/14/16: Guidance has been updated to comply with the e-Construction JSP. For instance, #6a now reminds payroll checkers to consider overtime rules and #7c clarifies how to handle subsistence withholdings made by contractors. EPG 131.1 Design Exception Process 9/6/16: Federal rules have reduced the controlling criteria to 10, reducing the instances in which federal approval is required on federal involvement projects. The expectations for documentation have also been updated. EPG 907.1 Safety Program Guidelines 8/26/16: New guidance for safety funds is now available. Also, the article was generally restructured and clarified. EPG 127.7 Threatened and Endangered Species 8/25/16: This article was updated and clarified, including the addition of new info on migratory birds. 8/25/16: Guidance for the use of a vibratory screed was expanded and clarified. EPG 401.2.3 Job Mix Formula and EPG 460.3.13 Asphalt Binder Sampling 8/24/16: In EPG 401.2.3, contractors are allowed flexibility in the field to make bin adjustments provided the specs are satisfied. In EPG 460.3.13 Asphalt Binder Sampling, the collection of a third pint can of binder as the retained sample is the appropriate procedure. 8/24/16: Guidance was revised to reflect recent updates to Sec 401. Includes revisions to the TSR verbiage, plant setting adjustments by the contractor without prior approval, average core results for acceptance and the approach to Plasticity Index. 8/24/16: Incidental grading for Type A end terminals was deleted so that a separate pay item could be included for prime contractors to bid on projects. |