All pages
Jump to navigation
Jump to search
Previous page (102.1 Construction Inspection Guidance for Sec 102) | Next page (905.3 Transportation Impact Analysis)
- 320.1 Preliminary Geotechnical Report (PGR)
- 320.2 Release of Subsurface Information
- 320.3 Drilling Operations
- 320.4 Procedure for Final Sounding
- 320.5 Foundation Investigations
- 320.6 Slide Investigations
- 320.7 Quarantine Regulations
- 321.1 Design of Earth Slopes
- 321.2 Geotechnical Guidelines
- 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation
- 413.10 Undersealing
- 413.1 Micro-Surfacing
- 413.2 Scrub Seal
- 413.3 Ultrathin Bonded Asphalt Wearing Surface
- 413.4 Bituminous Fog Sealing
- 413.5 Crack Treatment in Bituminous Pavements
- 413.6 Scrub Seal Treatment
- 413.7 Thin Hot Mix Asphalt Overlay
- 413.8 Spot Seal Coating
- 413.9 Fly Coating
- 460.1 Quality Control/Quality Assurance
- 460.2 Pre-Pavement Meeting
- 460.3 Plant Inspection
- 460.4 Paving Equipment
- 460.5 Roadway Inspection
- 460.6 Paving Operations
- 460.7 Mat Problems
- 570.1 Repair of Concrete Surface Failures
- 570.2 Joint and Crack Maintenance
- 570.3 Repair of Buckled Pavement
- 570.4 Repair of Settlements with Bituminous Patches
- 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance
- 570.6 Preparation of Portland Cement Concrete Surfaces Prior to Resurfacing
- 606.1 Guardrail
- 606.2 Guard Cable
- 606.3 One-Strand Cable - Access Restraint
- 607.1 Applications
- 607.2 Plans
- 607.3 One-Strand Cable - Access Restraint
- 607.4 Maintenance Planning Guidelines for Fences
- 609.3 Material Inspection for Sec 609
- 609.4 Maintenance Planning Guidelines for Cleaning and Reshaping Paved Ditches
- 609.5 Maintenance Planning Guidelines for Repairing Paved Ditches and Slopes
- 609.6 Maintenance Planning Guidelines for Repairing Curbs
- 611.1 Rock Blanket
- 611.2 Revetment
- 611.3 Concrete Slope Protection
- 611.4 Gabions
- 614.2 Material Inspection for Sec 614
- 614.3 Laboratory Testing Guidelines for Sec 614
- 614.4 Maintenance Planning Guidelines for Drop Inlets and Storm Sewers
- 614.5 Maintenance of Floodgates
- 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation
- 616.11 Traffic Control for Waterways
- 616.12 Work Zone Speed Limits
- 616.13 Work Zone Capacity, Queue and Travel Delay
- 616.14 Work Zone Safety and Mobility Policy
- 616.15 Transit Considerations
- 616.16 Law Enforcement Services
- 616.17 Pavement Edge Treatment
- 616.18 Construction Inspection Guidelines for Sec 616
- 616.19 Quality Standards for Temporary Traffic Control Devices
- 616.1 General (MUTCD Chapter 6A)
- 616.20 Flagger Training
- 616.21 Work Zone Technician Training
- 616.22 Advanced Work Zone Training
- 616.23 Traffic Control for Field Operations
- 616.24 Traffic Control for Non-Motorized Traffic
- 616.25 MoDOT Work Zone Guidelines
- 616.26 Work Zone User Training
- 616.27 MoDOT Fleet Lighting
- 616.2 Fundamental Principles (MUTCD Chapter 6B)
- 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C)
- 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)
- 616.5 Flagger Control (MUTCD Chapter 6E)
- 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)
- 616.8 Typical Applications (MUTCD 6H)
- 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
- 616.x Typical Applications January 2023
- 617.1 Temporary Traffic Barriers
- 617.2 Construction Inspection Guidelines for Sec 617
- 617.3 Material Inspection for Sec 617
- 617.4 Laboratory Testing Guidelines for Sec 617
- 617.5 Maintenance Planning Guidelines for Concrete Traffic Barriers
- 620.10 Operational Procedures and Safety
- 620.11 Guidelines for Using Water-Borne Traffic Paint
- 620.12 Construction Inspection for Sec 620
- 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers
- 620.14 3M Installation Contract
- 620.1 General (MUTCD Chapter 3A)
- 620.2 Pavement and Curb Markings (MUTCD Chapter 3B)
- 620.3 Roundabout Markings (MUTCD Chapter 3C)
- 620.4 Markings for Preferential Lanes (MUTCD Chapter 3D)
- 620.5 Delineators (MUTCD Chapter 3F)
- 620.6 Colored Pavements
- 620.7 Channelizing Devices Used for Emphasis or Pavement Marking Patterns
- 620.8 Islands
- 620.9 Rumble Strip Markings
- 626.1 Edgeline Rumble Strips
- 626.2 Centerline Rumble Strips
- 626.3 Construction Inspection Guidelines for Sec 626
- 626.4 Transverse Rumble Strips
- 626.5 Modified Rumble Strips
- 640.1 Pavement Drainage
- 640.2 Median Drainage
- 641.1 Bicycle Facilities
- 642.10 Curb Ramp Applications
- 642.11 Pedestrian Grade Separations
- 642.12 Pedestrians and Roundabouts
- 642.13 ADA Self-Evaluation
- 642.14 ADA Transition Plan
- 642.1 Integrating Non-Motorized Facilities
- 642.2 Consideration of Pedestrian Facilites on Projects
- 642.3 Americans with Disabilities Act of 1990
- 642.4 Impact of the Project Category on ADA
- 642.5 Maximum Extent Feasible
- 642.6 Local Projects and ADA Considerations
- 642.7 Maintenance Responsibility
- 642.8 Sidewalk Design Criteria
- 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
- 643.1 Utilities - Status and Liability Acceptance
- 643.1 Utilities - Status Letter
- 643.2 Local Utility Adjustments - Public and Private
- 643.3 Policy, Standards and Regulations
- 643.4 Railroads
- 646.1 Manholes
- 646.2 Pipelines
- 646.3 Private Underpasses
- 646.4 Work Funded by Maintenance
- 733 Precast Concrete Box Culverts
- 748.1 Evaluation of Project Impacts
- 748.2 Roadway Design Criteria
- 748.3 Freeboard
- 748.4 Headwater and Backwater
- 748.5 Matching Existing Structures
- 748.6 High Water Surface Elevation
- 748.7 Bridge Deck and Bridge End Drainage
- 748.7 Bridge Reports and Layouts
- 748.8 Development in Floodplains
- 748.9 Legal Aspects of Hydraulic Design
- 750.1 Open Channels
- 750.2 Culverts
- 750.3 Bridges
- 750.4 Storm Sewers
- 750.5 Sanitary Sewers
- 750.6 Erosion Control and Energy Dissipation
- 750.7 Non-Hydraulic Considerations
- 751.0 State Map
- 751.10 General Superstructure
- 751.11 Bearings
- 751.12 Barriers, Railings, Curbs and Fences
- 751.13 Expansion Joint Systems
- 751.14 Steel Superstructure
- 751.17 Concrete Slab Bridges
- 751.18 Concrete Multicell Box Girder Bridges
- 751.1 Preliminary Design
- 751.21 Prestressed Concrete Slab and Box Beams
- 751.22 Prestressed Concrete I Girders
- 751.23 Prestressed Concrete Double Tee Girders
- 751.24 Retaining Walls
- 751.2 Loads
- 751.30 Open Concrete End Bents
- 751.31 Open Concrete Intermediate Bents
- 751.32 Concrete Pile Cap Intermediate Bents
- 751.33 Concrete Semi Deep Abutments
- 751.34 Concrete Pile Cap Non-Integral End Bents
- 751.35 Concrete Pile Cap Integral End Bents
- 751.36 Driven Piles
- 751.37 Drilled Shafts
- 751.38 Spread Footings
- 751.39 Pile Footings
- 751.39 Seal Course
- 751.3 Structural Steel Design Properties
- 751.40 LFD Widening and Repair
- 751.4 Reinforced Concrete Design Properties
- 751.50 Standard Detailing Notes
- 751.5 Structural Detailing Guidelines
- 751.6 General Quantities
- 751.7 General Design Data
- 751.8 Concrete Box Culverts
- 751.8 LFD Culverts
- 751.9 Bridge Seismic Design
- 770.10 Linseed Oil Treatment
- 770.1 District Routine Maintenance and Special Crew Responsibilities
- 770.2 Regional and Central Office Bridge Maintenance Crew Responsibilities
- 770.3 Cathodic Protection
- 770.4 Navigation Lights/Light Tenders
- 770.5 Posting of Bridge Limits
- 770.6 Bridge Approach Maintenance
- 770.6 Mat Gutter Maintenance
- 770.7 Channel Work - Gabion Installation
- 770.7 Maintenance of Bridge Superstructure
- 770.8 Channel Work - Rock Blanket
- 770.8 Maintenance of Bridge Substructure
- 770.9 Miscellaneous Bridge Maintenance
- 771.10 Bridge Joint Sealing - Hot Pour
- 771.11 Bridge Joint Sealing - Silicone
- 771.12 Bridge Joint Sealing - Polytite
- 771.13 Sealing Abutment and Pier Caps
- 771.14 Spot Painting of Bearings and Piling
- 771.15 Concrete Bridge Deck Sealer Selection Matrix
- 771.16 Penetrating Concrete Sealer - Silane
- 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP)
- 771.18 In-Deck Bridge Deck Crack Filler
- 771.19 Chip Seal to Entire Deck
- 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)
- 771.20 Cut and Spray Brush and Vines
- 771.21 Rainy Day Bridge Activities
- 771.2 Bridge Cleaning and Flushing
- 771.3 Shaving Shoulder and Around Guardrail
- 771.4 Drain Basin Maintenance
- 771.5 Mat Gutter Maintenance
- 771.6 Channel Work - Gabion Installation
- 771.7 Channel Work - Rock Blanket
- 771.8 Remove Drift
- 771.9 Temporary Bridge Deck Repair
- 801.2 Laboratory Testing Guidelines for Sec 801
- 806.1 Erosion Control Measures
- 806.2 Sediment Control Measures
- 806.3 Additional Temporary Erosion and Sediment Controls
- 806.4 Preactivity Meeting
- 806.5 Site Inspections and BMP Repair
- 806.6 Proper Operation and Maintenance
- 806.7 Other Divisions' Activities
- 806.8 Storm Water Pollution Prevention Plan (SWPPP)
- 821.10 Equipment and Application Methods
- 821.11 Calibration
- 821.12 Mixing and Handling Guidelines
- 821.13 Traffic Control for Spraying Operations
- 821.14 Herbicide Spills Incident Reporting
- 821.15 Forms and Conversions
- 821.16 Total Vegetation Control Treatment
- 821.17 Plant Growth Regulators (PGRs)
- 821.18 Noxious Weeds
- 821.19 Problem Weeds
- 821.20 Woody Plant Control
- 821.21 Aquatic Areas
- 821.22 Weed Control in Landscaped Areas
- 821.23 Additives and Adjuvants
- 821.24 Glossary
- 821.25 Products
- 821.26 Maintenance Planning Guidelines for Chemical Weed Control
- 821.2 Safety
- 821.3 Public Relations
- 821.4 Pesticides and the Environment
- 821.5 Storage Facilities
- 821.6 Inventory Control and Storage
- 821.7 Planning and Ordering
- 821.8 Record Keeping
- 821.9 Labels and Safety Data Sheets (SDS)
- 822.10 Maintenance Planning Guidelines for Brush Cutting
- 822.11 Maintenance Planning Guidelines for Tree Removal
- 822.1 General Policy
- 822.1 Vegetation Management for Major Roads
- 822.2 Type I Management Area Guidelines (High Profile Areas)
- 822.2 Vegetation Management for Minor Roads
- 822.3 Type II Management Area Guidelines (Fully Developed Areas)
- 822.3 Vegetation Management for High Profile Areas
- 822.4 Best Practices
- 822.4 Recommended Practices
- 822.4 Type III Management Area Guidelines (Undeveloped Areas on Divided Highways)
- 822.5 Definitions
- 822.5 Type IV Management Area Guidelines (Undeveloped Areas on Undivided Highways)
- 822.6 Best Practices
- 822.6 Hay and Other Crops on the Right of Way
- 822.7 Definitions
- 822.7 Maintenance Planning Guidelines for Mowing Operations
- 822.8 Hay and Other Crops on the Right of Way
- 822.8 Maintenance Planning Guidelines for Brush Cutting
- 822.9 Maintenance Planning Guidelines for Mowing Operations
- 822.9 Maintenance Planning Guidelines for Tree Removal
- 823.1 Prohibited Work Activities for Inmates
- 823.2 Guidelines for Determining Who is Eligible to Oversee Incarcerated Crews
- 823.3 Role of MoDOT Supervisors
- 823.4 Dealing with Certain Situations
- 823.5 How to Obtain Assistance
- 823.6 General Rules for Inmates
- 823.7 All in a Day’s Work – Handling the Crew
- 824.1 Maintenance Planning Guidelines for Litter Pick-Up
- 901.10 Preparation of Plans
- 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination
- 901.12 Electrical Components
- 901.13 Lighting Proposed by Other Political Subdivisions on State Highways
- 901.14 Dusk-to-Dawn Lighting Policy
- 901.15 Glossary
- 901.16 Construction Inspection Guidelines for Sec 901
- 901.17 Material Inspection for Sec 901
- 901.18 Laboratory Testing for Sec 901
- 901.1 Lighting to be Provided, Operated, and Maintained at State Expense
- 901.2 Lighting to be Provided, Operated, and Maintained at the Expense of the Local Political Subdivision
- 901.3 Lighting to be Adjusted at State Expense and Operated and Maintained at the Expense of the Local Political Subdivision
- 901.4 State Participation in Continuous Freeway Lighting by a Local Political Subdivision
- 901.5 Future Lighting
- 901.6 Programming
- 901.7 Light Source and Intensity
- 901.8 System Voltage
- 901.9 Layout
- 902.10 Traffic Control Signals for Freeway Entrance Ramps (MUTCD Chapter 4I)
- 902.11 Traffic Control for Schools
- 902.12 Flashing Beacons (MUTCD Chapter 4L)
- 902.13 Lane-Use Control Signals (MUTCD Chapter 4M)
- 902.14 In-Roadway Lights (MUTCD Chapter 4N)
- 902.15 Designing a Traffic Signal
- 902.16 The Mobility Plan – Effective Arterial Management
- 902.17 Execution of Contracts for Signal or Flasher Installation
- 902.18 Glossary
- 902.19 Construction Inspection Guidelines for Sec 902
- 902.1 General (MUTCD Chapter 4A)
- 902.20 Material Inspection for Sec 902
- 902.21 Laboratory Testing Guidelines for Sec 902
- 902.2 Traffic Control Signals (MUTCD Chapter 4B)
- 902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C)
- 902.4 Signal Installations and Equipment
- 902.5 Traffic Control Signal Features (MUTCD Chapter 4D)
- 902.6 Pedestrian Control Features (MUTCD Chapter 4E)
- 902.7 Pedestrian Hybrid Beacons (MUTCD Chapter 4F)
- 902.8 Traffic Control Signals and Hybrid Beacons for Emergency Vehicle Access (MUTCD Chapter 4G)
- 902.9 Traffic Control Signals for One-Lane, Two-Way Facilities (MUTCD Chapter 4H)
- 903.10 General Service Signs
- 903.11 Specific Service Signs - Logos
- 903.12 Tourist-Oriented Directional Signs (TODS)
- 903.13 State and Federal Recreation and Historic Site Signing
- 903.14 Emergency Management Signing
- 903.14 Memorial Signs
- 903.15 Signing Agreements
- 903.16 Typical Signing Applications
- 903.17 Delineation and Object Markers
- 903.18 Signing for School Areas
- 903.19 Signing for Rail and Light Rail Transit Grade Crossings
- 903.1 Highway Signing General Information
- 903.20 Signing for Bicycle Facilities
- 903.21 Construction Inspection Guidelines for Sec 903
- 903.22 Material Inspection for Sec 903
- 903.23 Laboratory Testing Guidelines for Sec 903
- 903.2 Extent of Signing
- 903.3 Ground-Mounted Sign Supports
- 903.4 Overhead Sign Mounting
- 903.5 Regulatory Signs
- 903.6 Warning Signs
- 903.7 Conventional Road Guide Signs
- 903.8 Freeway and Expressway Guide Signs
- 903.9 General Information Signs
- 905.1 Traffic Data Collection
- 905.2 Traffic Studies